雙重管高壓旋噴樁技術(shù)交底_第1頁
雙重管高壓旋噴樁技術(shù)交底_第2頁
雙重管高壓旋噴樁技術(shù)交底_第3頁
已閱讀5頁,還剩2頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、specificaci t cnica jtj034-2000 lespe cificaci, prova de pr oportioning segons els requeriments de disseny i complir els requi sits de disseny aba ns de construcci es pot utilitzar. estricte control de graduada for?a crua triturada, valor, ndex drid 0,5 mm de tela fina com el pl stic. gra escatosa a

2、 ldex de contingut en lmbit especificat, mentre net agregat dagregat. (2) el control estricte dels nivells gradua da de composici agregat. 9.4.3.2 mtode de construcci de (1): macadam pavimentaci barreja ha dutilitzar una gran construcci mecnica, equips, equi pament de transport, material de paviment

3、aci i altres rodets carretera normal de requisits de construcci del pr ojecte. (2) ingredients: un control estricte de qualitat grava, tot nivell. preguem a trav s de capes. (6) la difusi de qualificar a base de pedra triturada. difusi de la m quina. gra dua da pedra trencada pavimentaci en l nia do

4、s paviments m quines per permetre luniforme complet per pedra triturada graduada per a paviments i anivellament, despr s de compactar el gruix de la base. divisi de paviment. per alleujar la segregaci , carretera classificava trencat pedra s 12,5 m (amb costat pedres ampliat), control de m quina de

5、estene dora abg423 2 a 6 m, doble m quina botiga, dues pavimentaci de calade s. quan dobla m quina botiga, estenent un estricte control dambdues parts abans delevaci , desprs de lexterior amb elevaci de control del filferro corda, pel qual sa linterior del patcoix control de nivell nivell, dos super

6、posici estenedora pavimentaci 20-30cm, abans i despr s el mantenir dos 20-30m. h brid carr ils instal?lats capacitat s de 8m, fer un paviment de cal?ada. elements de paviment. materials de pavimentai quan segregaci i personal designat per mantenir leliminaci de la segregaci agregat fina i gruixuda.

7、pavimentaci de control de velocitat a 2,5-3m/min. en construcci , coeficient de solta aplana nt per 1.2. abans de paviments, primer comprovar el substrat, pende nt, al?atsecci , assegurar que els requisits, al mateix temps, davant el paviment sobre el terreny, polvoritzaci daigua sobre el substrat,

8、la part superior subjacent mantenen la humitat adequada. per reduir la segregaci , garantit la planitud segons la situaci actual, la construcci , per evitar la segregaci de la barreja a la falda de pavimentada dsfalt, barreja a m amb una segregaci b material, mantenir sempre les llambordes al pavime

9、nt no perdr proc s barreja-los tots en la tremuja. (7) el laminat: pressi est tica: corr vibratori estti ca 20t 1 vegades. pneum tics: lp2030 goma dels pneumtics vibraci corr rcc 1 vegades: compactaci vibratori terra esttica de 3 - 5 vegades (freqncia despr s de la primera freqncia alta): terra estt

10、ica vibraci carretera corr 1-2, pne um tics: patins de rodes de goma de tp2030 rcc 1 vegades quan va rodar, directament des de lespatlla a banda i banda per centre mlta de caixa de la carretera, lateral segments de corba dein order to ensure normal teachingorder, protecting students healthy growth,

11、ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, a ccording to the local conditions, make the management system. 1, the princi pal is the responsibility of schoo

12、l safety, school security under the leadership of president security work leading group. the head teacher to the leadershi p team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form e

13、very safety education for students of classe s per week should be targeted. to carry on emergency issues dealing with education in general, self-help and mutual rescue knowledge. emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major acci

14、 dent reporting system. school students report major accident within an hour of education; stude nt run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police station, a township peoples government shall not conceal the accident. 4 wee

15、k, teachers are on duty system, establish and improve the l eadership values; strengthen the education, management of teachi ng activities in schools to ensure normal teaching order; responsible for school safety leadership always maintained close contact and district pol ice stations, canvassing su

16、pport from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education qualit y, observe the stude nts psychological changes at any time and take preventive measures, no corporal punishment and covert corporal punishme nt o

17、n students, student out of the cla ssroom, schools may not be. 6, units or de partments use student street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the corre ctional centre, school princi pals consent, without organization. wit

18、hout the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should ducate students to obey the school rules and regulations, on time, on time home to prevent accidents. 8, school to school inspections on a regular basis, fou

19、nd hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples government, education, a nd r ule of law section. 9, the school should always check the internal walls, retaining walls, ponds, railings, handrails, doors, windows, staircases a nd a

20、 variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are safe and reliable. song lin xia ng liu jia ping elementarysch

21、ool march 2016 song lin xiang liu jia ping primary school fire safety systems to enha nce fire safety, protection of public property and the life and property safety of teachers and stude nts, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthe

22、n fire safety education of the whole school. according to the requirements of the fire services act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fire ns de le spatlla a espatlla lamina ci . come n?nt de s de la carretera a ambd

23、 s costats de lespatlla dur a rodant cam ce ntre. 1 - 2 vegades m s pressi a banda i banda de carretera. procs rodant la roda del darrere 1/2 roda ample, darrere de superposici roda amplada de l paviment aca bat, sha acabat. rodant velocitat dels rodets, les due s primeres vegades han de ser tractat

24、s amb 1.5-1.7km/h, desprs 2.0-2.5km/h. corr est estrictament prohi bit a lacabat o est posant en un tram de carretera de torn o fre (fora de la zona de construcci a volta). aixafar controlada en la humitat ptima humitat contingut contingut flotant al voltant del 1% - 2% (prova personal controls en q

25、ualsevol m oment en lobra si construcci) i, si sescau, rec rrega artificial daig ua, consum daigua s 1kg/m2, loperaci real grava tot humit, i la cal?da s no formar aigua, portar laigua a les necessitats. 9.4.3.3 gesti de la qualitat de li avaluaci del control de dimensions de construcci est ndard de

26、l projecte inspeccions graduada pr oporciona freq ncia de m tode de pr ova de valor delevaci 1 secci longitudinal (mm) nica 20.1 metres secci 5, nivell-10, per secci 3-5 2 gruix (mm) endoll mesurar valor representatiu de-8 sol 100.6 metres damplada l mit-10 3 (mm) disseny est ndard per 40,1-metre. e

27、st ndards de qualitat i tolerncies de les taules de vorera proje cte estndards de qualitat i tolerncies de grau subgrade de compactaci del grau de compactaci de subgrade de suavitat 10mm 110mm creu pendent requi sits 10mm i menys de 0,3% amplada no inferior a lestructura de paviment disseny 9.5.2.3

28、constructiva m tode (1): 15cm de trencat graduada pe dra base + 3 cm gruix ciment morter + 6 cm gruix pors sorra coix. (2) primria 15cm el gruix de paviment trencat graduada pedra base, preparaci , barreja de procs amb les carreteres, cla ssificava aixafat grau pedra base, motor, pavimentaci, anivel

29、lament artificial, corr compactar. (3) ma permeable pres tant control fil horitzontals i verticals, assegura articulacions uniformes, lineals i sua us, superf cies plana. tancat 25x12cm pedra especificacions, c20 prefabricats formig requereix la mateixa mida, angular, fora compleix els requisits de

30、disseny. 9.6 asfalt estructura de paviment de asfalt de paviment de formig de dalt a baix les segents: 4cm asfalt molt especfics concrets (ac-13) gruixudes part cules en asfalt formig + 6 cm (ac-20) + 14 cm gruix el betum estabilitzat grava (lsm-30). materials dasfalt amb trnsit pesat asfalt (ah-70)

31、. abans de paviments de formig asf ltic, primer en lacce ptaci de superf cie de pedra triturada graduada de la construcci de macadam bituminoses sincr ni c segellat. punts claus i dificultats en gran mida asfalt construcci paviment dasfalt estabilitzat picat pedra capa, com una nova tecnologia, el d

32、isseny de barreja de gradaci per a lesquelet estruct ura dens, per tal devitar la segregaci ms greu d rid gruixutelectricity lines, equipment inspections, found hidden in time for rectification, maintenance, and security. 9, do not use a n open flame in the classroom, prohibit burni ng stove, lit ca

33、ndles, mosquito repellent, no smoking, and banning messy wiring. without using any house hol d appliances is not allowed. 10, live on campus faculty members, must lead by example, and educate families and children ready to fire. 11, househol d use of gas in schools, to master proper usage, pay atten

34、tion to the leak-pr oof, explosion-proof, fireproof, closing valve after use to ensure security. 12, di ning room must be qualified, and annual testing of pressure vessels, to regularly check, the canteen workers must be certified, strictly by operation operation, gas tank and stove safety distance

35、of 1.5 meters, to prevent accidents. 13, the adverse conseque nces cause d by ignoring fire safety regulations, will be punished, until investigated for legal responsibility. s ong lin xiang liu jia ping elementary school march 2016 xiang liu jia ping elementary school, pine slopes surrounding safet

36、y managementsystem 1 teachers and students, the surrounding area of the school governance covers personal and food hygiene, cultural events and other aspects, integrated governance shall obtain wide support and full cooperation of the community. on the surrounding environment in schools shoul d be o

37、sely monitored. 2, school work at the same time, should pay attention to the safety management of school environment, should take the initiative to contact the district police station, the village committee, corre ctional centre, township government, business management and other departments to do a

38、 good job management. 3, teacher on duty with the exception of inspections in schools, should also pay attention to environmental inspections near the campus, found that the jobless migrants from rural areas, for example, harassment of students and a variety of acci dents, accordi ng to different si

39、tuations reporte d school officials or t he poli ce station in a timely manner, to pr otect the safety of students. 4, every day before school, teachers remind students, pay attention to traffic safety. 5, should e ducate students to respect social ethics, and various regulations, maintaining public

40、 order, a nd fight the bad guy s, and grasp the correct ways and means of maintaining and improving students self-care ability. 6, the establishme nt of emergency rescue teams of teachers in schools, on high alert and deployed. song lin xiang liu jia ping elementary school march 2016 song lin xi ang

41、 liu jia ping primary school teachers and students organizations out of safety management system organization activities between teachers and students, to draw up a precise plan a nd security measures must be signed by the school officials to review the programme of activities agreed upon correction

42、al center agreed to implement. organization t o the field relatively far or activities require approval by the deputy director of the education bureau in charge of security. 2, ea ch activity should hav e a specific responsibility, pay attention to the persons age, physical match. route 3, activitie

43、s, location, field surveys shoul d be carried out in advance. 4, activities for the means of transport should explain the situation to the school to comply with vehicle, safety requirements, before the line for repairs. 5, each a ctivity must have security, emergency response plan for accidents. 6,

44、picnics, hiking, picnic to pay attention to fire prevention, food poisoning, prevention of fall accidents 7, the activities near the rivers, reservoirs, no measures or do not meet the security requirements of the organization and not let students into the water雙重管高壓旋噴樁技術(shù)交底雙重管高壓旋噴樁設(shè)計樁徑80cm , 水灰比為 1:

45、1, 水泥采用 42.5級普通硅酸鹽水泥, 每延米水泥用量為340kg ,樁間咬合 15cm ,采用等邊三角形布置, 隔樁跳打法施工。 施工范圍詳見: 雙重管施工平面布置圖一、雙重管旋噴樁主要施工方法1、施工準備根據(jù)現(xiàn)場情況,進行場地平整;嚴格按照設(shè)計要求及有關(guān)規(guī)范規(guī)定,進行圖紙的技術(shù)交底工作, 作好施工前安全文明教育; 做好通水、通電及硬化道路工作;檢查機器運轉(zhuǎn)情況并做好各易損件的籌備工作;按現(xiàn)場平面布置圖選好地點挖水泥漿池及鋪水泥堆放臺。2、測量放樣根據(jù)項目部測量班提供的樁位及時進行引樁,將主軸線控制點引至不受破壞的位置,且加以保護;采用鋼尺拉線、插竹簽定樁位的方式進行樁位點的測放,距離中

46、誤差:5mm 。3、標定進場后及時與實驗室聯(lián)系并對每臺機壓力表進行標定,標定后及時將標定證書交項目部實驗室。 開工前通知項目部現(xiàn)場施工員及監(jiān)理對攪拌桶進行標定。在攪拌桶上掛標識牌,內(nèi)容包括(每桶內(nèi)水泥用量、加入水的深度、漿液壓力讀數(shù)、設(shè)計水泥用量、設(shè)計水灰比、提升速度、施工日期等)specificaci t cnica jtj034-2000 lespe cificaci, prova de pr oportioning segons els requeriments de disseny i complir els requi sits de disseny aba ns de constr

47、ucci es pot utilitzar. estricte control de graduada for?a crua triturada, valor, ndex drid 0,5 mm de tela fina com el pl stic. gra escatosa a lndex de contingut en lmbit especificat, mentre net agregat dagregat. (2) el control estricte dels nivells gradua da de composici agregat. 9.4.3.2 mtode de co

48、nstrucci de (1): macadam pavimentaci barreja ha dutilitzar una gran construcci mecnica, equips, equi pament de transport, material de pavimentaci i altres rodets carretera normal de requisits de construcci del projecte. (2) ingredients: un control estricte de qualitat grava, tot nivell. preguem a tr

49、av s de capes. (6) la difusi de qualificar a base de pedra triturada. difusi de la mquina. gra duada pe dra trencada pavimentaci en l nia dos paviments m quines per permetre luniforme complet per pedra triturada graduada per a paviments i anivellament, despr s de compactar el gruix de la base. divis

50、i de paviment. per alleujar la segregaci , carretera classificava trencat pedra s 12,5 m (amb costat pedres ampliat), control de m quina de estene dora abg423 2 a 6 m, doble m quina botiga, dues pavimentaci de calade s. quan dobla m quina botiga, estenent un estricte control dambdues parts abans del

51、evaci , desprs de lexterior amb elevaci de control del filferro corda, pel qual sa linterior del patcoix control de nivell nivell, dos superposici estenedora pavimentaci 20-30cm, abans i despr s el mantenir dos 20-30m. h brid carr ils instal?lats capacitat s de 8m, fer un paviment de calada. element

52、s de paviment. materials de pavimentaci quan segregaci i personal designat per mantenir leliminaci de la segregaci agregat fina i gruixuda. pavimentaci de control de velocitat a 2,5-3m/min. en construcci , coeficient de solta aplana nt per 1.2. abans de paviments, primer comprovar el substrat, pende

53、 nt, al?atsecci , assegurar que els requisits, al mateix temps, davant el paviment sobre el terreny, polvoritzaci daigua sobre el substrat, la part superior subjacent mantenen la humitat adequada. per reduir la segregaci , garantit la planitud segons la situaci actual, la construcci , per evitar la

54、segregaci de la barreja a la falda de pavimentada dasfalt, barreja a m amb una segregaci b material, mantenir sempre les llambordes al paviment no perdr proc s barreja-los tots en la tremuja. (7) el laminat: pressi est tica: corr vibratori estti ca 20t 1 vegades. pneum tics: lp2030 goma dels pneumti

55、cs vibraci corr rcc 1 vegades: compactaci vibratori terra esttica de 3 - 5 vegades (freqncia despr s de la primera freqncia alta): terra esttica vibraci carretera corr 1-2, pne um tics: patins de rodes de goma de tp2030 rcc 1 vegades quan va rodar, directament des de lespatlla a banda i banda per ce

56、ntre mlta de caixa de la carretera, lateral segments de corba dein order to ensure normal teachingorder, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety

57、and reduce losses principle, a ccording to the local conditions, make the management system. 1, the princi pal is the responsibility of school safety, school security under the leadership of president security work leading group. the head teacher to the leadershi p team is responsible for, implement

58、ation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classe s per week should be targeted. to carry on emergency issues dealing with education in general, self-help and mutua

59、l rescue knowledge. emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, t he establishment of major acci dent reporting system. school students report major accident within an hour of education; stude nt run and disappearances to report; report of the accident t

60、o a written report in triplicate, a correctional centre, a police station, a township peoples government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the l eadership values; strengthen the education, management of teachi ng activities in schools to ensur

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論