電氣-施工質量檢驗項目劃分表_第1頁
電氣-施工質量檢驗項目劃分表_第2頁
電氣-施工質量檢驗項目劃分表_第3頁
電氣-施工質量檢驗項目劃分表_第4頁
電氣-施工質量檢驗項目劃分表_第5頁
已閱讀5頁,還剩7頁未讀 繼續免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

天津堿廠搬遷改造工程熱電站項目#1標,,,,,,,,,,,,,,

電氣專業施工質量檢驗項目,,,,,,,,,,,,,,

工程編號,,,工程項目名稱,性質,質檢機構驗評范圍,,,,,監檢方式,,,,質量驗評及簽證表編號(DL/T)

單位工程,分部工程,分項工程,,,施工單位,,,監理單位,建設單位,待檢點H,簽證點R,見證點W,旁站點S,

,,,,,班組,工地,質檢部,,,,,,,

1,,,發電機電氣與引出線安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,發電機電氣與出線設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,發電機本體檢查,主要,√,√,√,√,√,,,√,,5161.7-表1.0.1

,,2,發電機附件安裝,主要,√,√,√,√,,,,√,,5161.7-表1.0.2

,,3,勵磁設備檢查安裝,,√,√,√,√,,,,,,5161.7-表2.1.25161.3-表1.0.1

,,4,互感器檢查安裝,,√,√,,,,,,,,5161.3-表3.0.1

,,5,箱、柜(盤)安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表2.0.15161.8-表4.0.25161.8-表6.0.2

,,6,電阻器安裝,,√,√,,,,,,,,

,,7,交(直)流勵磁母線安裝,主要,√,√,√,√,,,,,,5161.4-表3.0.2

,2,,發電機引出線安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,鐵構架制作安裝,,√,√,,,,,,,,5161.4-表1.0.25161.4-表1.0.3

,,2,封閉母線安裝,主要,√,√,√,√,,,,√,,5161.4-表5.0.2

,,3,電壓互感器、避雷器安裝,,√,√,√,√,,,,,,5161.3-表3.0.15161.2-表6.0.2

,,4,隔離開關安裝,,√,√,,,,,,,,5161.2-表5.0.1

,,5,負荷開關安裝,主要,√,√,√,√,,,,,,5161.2-表5.0.2

,10,,發電機啟動試運,主要,,√,√,√,√,√,√,,,5161.7-表3.0.7

2,,,主變壓器系統設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,主變壓器安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,主變壓器本體安裝,,√,√,√,√,,,,,,5161.3-表1.0.3-1

,,2,主變壓器檢查,主要,√,√,√,√,√,,,,,5161.3-表1.0.3-2

,,3,主變壓器附件安裝,,√,√,√,√,,,√,√,,5161.3-表1.0.3-3

,,4,主變壓器注油及密封試驗,主要,√,√,√,√,,,,,√,5161.3-表1.0.3-4

,,5,主變壓器整體檢查,主要,√,√,√,√,,,,,,5161.3-表1.0.3-5

,2,,主變壓器系統附屬設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,中性點隔離開關安裝,,√,√,√,√,,,,,,5161.2-表5.0.1

,,2,避雷器安裝,,√,√,√,√,,,,,,5161.2-表6.0.2

,,3,控制柜及端子箱檢查安裝,,√,√,,,,,,,,5161.8-表4.0.2

,,4,軟母線安裝,,√,√,√,√,,,,,,5161.4-表7.0.2

,10,,主變壓器帶電試運,主要,,√,√,√,√,√,√,,,5161.3-表4.0.9

3,,,×××kV配電裝置安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,網控室設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,控制及保護屏臺安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.2

,,2,直流屏及充電設備安裝,,√,√,,,,,,,,5161.13-表2.0.2

,,3,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,,4,蓄電池安裝,,√,√,√,√,,,,√,,5161.9-表1.0.25161.9-表2.0.2

,,5,充放電及容量測定,主要,√,√,√,√,,,√,,√,5161.9-表3.0.35161.9-表3.0.4

,2,,主母線及旁路母線安裝,,,√,√,√,√,√,,,,5161.1-表4.0.2

,,1,絕緣子串安裝,,√,√,,,,,√,,,5161.4-表2.0.2

,,2,軟母線安裝,,√,√,√,√,√,,,,,5161.4-表7.0.2

,,3,支柱絕緣子安裝,,√,√,,,,,,,,5161.4-表2.0.3

,,4,管型母線安裝,主要,√,√,√,√,,,,,,5161.4-表6.0.2

,,5,隔離開關安裝,,√,√,√,√,,,,,,5161.2-表5.0.1

,3,,電壓互感器,,,,,,,,,,,

,,6,低壓側共箱封閉母線安裝,☆,√,√,√,√,,,,√,,5161.4-表1.0.25161.4-表4.0.2

,,7,變壓器整體檢查,☆,√,√,√,√,,,,,,5161.3-表1.0.3-5

,10.1,,廠用高壓工作變壓器帶電試運,☆,,√,√,√,√,√,√,,,5161.3-表4.0.9

,3,,廠用高壓備用變壓器安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,變壓器本體安裝,,√,√,,,,,,√,,5161.3-表1.0.3-1

,,2,變壓器檢查,☆,√,√,√,√,√,,,,,5161.3-表1.0.3-2

,,3,變壓器附件安裝,,√,√,,,,,,,,5161.3-表1.0.3-3

,,4,變壓器注油及密封試驗,☆,√,√,√,√,,,,,,5161.3-表1.0.3-4

,,5,控制及端子箱安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表4.0.2

,,6,低壓側共箱封閉母線安裝,☆,√,√,√,√,,,,√,,5161.4-表1.0.25161.4-表4.0.2

,,7,軟母線安裝,☆,√,√,√,√,,,,,,5161.4-表7.0.2

,,8,變壓器整體檢查,☆,√,√,√,√,,,,,,5161.3-表1.0.3-5

,,9,隔離開關等電氣設備安裝,☆,√,√,,,,,,,,5161.4-表7.0.2

,10.2,,廠用高壓備用變壓器帶電試運,☆,,√,√,√,√,√,√,,,5161.3-表4.0.9

5,,,主廠房廠用電系統設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,廠用高壓工作配電裝置安裝(I段),,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,斷路器檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,2,,廠用高壓工作配電裝置安裝(II段),,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,斷路器檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,3,,廠用高壓備用配電裝置安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,斷路器檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,4,,廠用低壓公用配電裝置安裝(A段),,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,干式變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,3,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,4,空氣開關檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,5,,廠用低壓公用配電裝置安裝(B段),,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,干式變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,3,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,4,空氣開關檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,6,,廠用低壓工作配電裝置安裝(I段),,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,干式變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,3,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,4,空氣開關檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,7,,廠用低壓工作配電裝置安裝(II段),,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,干式變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,3,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,4,空氣開關檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,8,,廠用低壓備用段配電裝置安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,盤柜基礎安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,干式變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,3,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,4,空氣開關檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,9,,汽機間電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,2,就地動力控制設備安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表4.0.2

,,3,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,,4,電動機檢查,☆,√,√,√,√,,,,√,,5161.7-表2.2.2

,,5,電動機帶電試運,☆,√,√,√,√,√,√,√,,,5161.7-表3.0.115161.7-表3.0.13

,10,,鍋爐間電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,,1,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,2,就地動力控制設備安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表4.0.2

,,3,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,,4,電動機檢查,☆,√,√,√,√,,,,√,,5161.7-表2.2.2

,,5,電梯電氣設備安裝,☆,√,√,√,√,√,,,,,5161.11-表1.0.2

,,6,電動機帶電試運,☆,√,√,√,√,√,√,√,,,5161.7-表3.0.115161.7-表3.0.13

,11,,集控樓電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,,1,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,2,就地動力控制設備安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表4.0.2

,,3,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,,4,電動機檢查,☆,√,√,√,√,,,,√,,5161.7-表2.2.2

,,5,電梯電氣設備安裝,☆,√,√,√,√,√,,,,,5161.11-表1.0.2

,,6,電動機帶電試運,☆,√,√,√,√,√,√,√,,,5161.7-表3.0.115161.7-表3.0.13

,10,,廠用電系統設備帶電試運,☆,,√,√,√,√,√,√,,,5161.1-表5.0.5-25161.1-表5.0.5-3

6,,,事故保安電源設備安裝,,,√,√,√,√,,,√,,5161.1-表4.0.3

,,1,控制屏安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.2

,,2,不停電電源裝置安裝,,√,√,√,√,,,,,,5161.8-表1.0.25161.13-表2.0.2

,,3,配電盤安裝,,√,√,√,√,,,,,,5161.8-表2.0.15161.8-表2.0.25161.8-表3.0.3

,,4,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,5,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,10,,事故保安電源帶電試運,☆,,√,√,√,√,,√,,√,5161.1-表5.0.5-3

7,,,輸煤系統電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,輸煤系統控制設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,輸煤控制室控制及保護屏安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.2

,,2,輸煤控制室二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,2,,高壓配電裝置安裝,☆,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,基礎型鋼安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,斷路器檢查,☆,√,√,√,√,,,,,√,5161.2-表3.0.25161.2-表4.0.2

,,5,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,3,,低壓配電裝置安裝(A段),,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,4,,低壓配電裝置安裝(B段),,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,5,,低壓備用配電裝置安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,2,配電盤安裝,,√,√,,,,,,,,5161.8-表2.0.15161.8-表2.0.2

,,3,母線安裝,☆,√,√,√,√,,,,,,5161.4-表3.0.2

,,4,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,6,,輸煤系統電動機帶電試運,☆,,√,√,√,√,√,√,,,5161.7-表3.0.115161.7-表3.0.13

,10,,輸煤系統配電裝置帶電試運,☆,,√,√,√,√,√,√,,,5161.1-表5.0.5-25161.1-表5.0.5-3

8,,,除塵除灰系統電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,除塵除灰系統控制設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,除塵除灰系統控制及保護屏安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.2

,,2,除塵除灰系統二次回路檢查接線,,√,√,,,,,,,,5161.8-表7.0.2

,2,,除塵除灰系統高壓電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,基礎型鋼安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,2,整流變安裝,☆,√,√,√,√,,,,,,5161.3-表1.0.2

,,3,配電盤安裝,,√,√,,,,,,,,5161.8-表1.0.2

,,4,母線安裝,,√,√,√,√,,,,,,5161.4-表3.0.2

,,5,斷路器檢查,☆,√,√,√,√,,,,,,5161.2-表3.0.25161.2-表4.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,3,,除塵系統低壓電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,2,MCC(電動機控制中心)盤安裝,,√,√,,,,,,√,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,3,控制柜安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.2

,,4,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,4,,除灰系統電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,變壓器安裝,☆,√,√,√,√,,,,√,,5161.3-表1.0.15161.3-表1.0.2

,,2,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,3,電動機檢查,☆,√,√,√,√,,,,,,5161.7-表2.2.2

,,4,就地動力控制設備安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表4.0.25161.12-表5.0.25161.12-表2.0.2

,,5,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,5,,除塵除灰系統電動機帶電試運,☆,,√,√,√,√,√,√,,,5161.7-表3.0.115161.7-表3.0.13

,10,,除塵除灰系統配電裝置帶電試運,☆,,√,√,√,√,√,√,,,5161.1-表5.0.5-25161.1-表5.0.5-3

9,,,附屬生產系統電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.3

,1,,燃油泵房電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,2,控制盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.25161.12-表5.0.2

,,3,就地電氣設備安裝,,√,√,,,,,,,,5161.15-表3.0.2

,,4,電動機檢查,☆,√,√,√,√,,,,,,5161.7-表2.2.2

,,5,就地電氣設備接地,☆,√,√,√,√,,,,,,5161.15-表4.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,10.1,,燃油泵房電氣設備帶電試運,☆,,√,√,√,√,√,√,,,5161.1-表5.0.5-3

,2,,空壓機站電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,2,控制盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.25161.12-表5.0.2

,,3,電動機檢查,☆,√,√,√,√,,,,,,5161.7-表2.2.2

,,4,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,10.2,,空壓站電氣設備帶電試運,☆,,√,√,√,√,√,√,,,5161.1-表5.0.5-3

,3,,油處理站電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,MCC(電動機控制中心)盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表3.0.35161.12-表1.0.25161.4-表3.0.2

,,2,控制盤安裝,,√,√,,,,,,,,5161.8-表1.0.25161.8-表5.0.25161.12-表5.0.2

,,3,就地電氣設備安裝,,√,√,,,,,,,,5161.15-表3.0.2

,,4,電動機檢查,☆,√,√,√,√,,,,,,5161.7-表2.2.2

,,5,就地電氣設備接地,☆,√,√,√,√,,,,,,5161.15-表4.0.2

,,6,二次回路檢查及接線,,√,√,,,,,,,,5161.8-表7.0.2

,10.3,,油處理站電氣設備帶電試運,,,√,√,√,√,√,√,,,5161.1-表5.0.5-3

10,,,全廠起重機電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,汽機間起重機電氣設備安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,主、副滑線安裝,,√,√,,,,,,√,,5161.14-表1.0.25161.14-表1.0.45161.14-表1.0.65161.14-表3.0.2

,,2,電動機檢查,☆,√,√,√,√,,,,,,5161.7-表3.0.9

,,3,控制設備安裝及接線,,√,√,,,,,,,,5161.12-表1.0.25161.12-表3.0.25161.12-表5.0.25161.14-表2.0.2

,2,,鍋爐間起重機電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,軟電纜安裝,,√,√,,,,,,,,5161.14-表1.0.5

,,2,滑線安裝,,√,√,,,,,,,,5161.14-表3.0.2

,3,,輔助車間起重機電氣設備安裝,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,滑線安裝,,√,√,,,,,,,,5161.14-表1.0.25161.14-表1.0.45161.14-表1.0.65161.14-表3.0.2

,,2,軟電纜安裝,,√,√,,,,,,,,5161.14-表1.0.4

,10,,起重機電氣設備帶電試運,☆,,√,√,√,√,√,√,,,5161.14-表4.0.2

11,,,設備及構筑物照明安裝,,,√,√,√,√,,√,,,5161.1-表4.0.3

,1,,鍋爐本體照明安裝,,,√,√,√,√,,√,,,5161.1-表4.0.2

,,1,電源及控制設備安裝,,√,√,,,,,,,,5161.17-表1.0.25161.17-表3.0.2

,,2,管路敷設,,√,√,√,√,,,,,,5161.16-表1.0.2

,,3,管內配線及接線,,√,√,,,,,,,,5161.16-表2.0.2

,,4,照明燈具安裝,,√,√,√,√,,,,,,5161.17-表2.0.2

,2,,回路通電檢查,☆,√,√,√,√,√,,,,√,5161.17-表4.0.2

,,1,電源及控制設備安裝,,√,√,,,,,,,,5161.17-表1.0.25161.17-表3.0.2

,,2,管路敷設,,√,√,√,√,,,,,,5161.16-表1.0.2

,,3,管內配線及接線,,√,√,,,,,,,,5161.16-表2.0.2

,,4,照明燈具安裝,,√,√,√,√,,,,,,5161.17-表2.0.2

12,,,全廠電纜線路施工,,,√,√,√,√,,,√,,5161.1-表4.0.3

,1,,電纜管配制及敷設,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,主廠房電纜管配制及敷設,,√,√,,,,,,,,5161.5-表1.0.2

,,2,開關站及網控室電纜管配制及敷設,,√,√,,,,,,,,5161.5-表1.0.2

,,3,輸煤系統電纜管配制及敷設,,√,√,,,,,,,,5161.5-表1.0.2

,,4,電除塵系統電纜管配制及敷設,,√,√,,,,,,,,5161.5-表1.0.2

,,5,除灰系統電纜管配制及敷設,,√,√,,,,,,,,5161.5-表1.0.2

,,6,其他附屬車間電纜管配制及敷設,,√,√,,,,,,,,5161.5-表1.0.2

,2,,電纜架安裝,,,√,√,√,√,,,√,,5161.1-表4.0.2

,,1,主廠房電纜架安裝,,√,√,,,,,,,,5161.5-表1.0.3

,,2,開關站及網控室電纜架安裝,,√,√,,,,,,,,5161.5-表1.0.3

,,3,輸煤系統電纜架安裝,,√,√,,,,,,,,5161.5-表1.0.3

,,4,除灰系統電纜架安裝,,√,√,,,,,,,,5161.5-表1.0.3

,,5,其他附屬車間電纜架安裝,,√,√,,,,,,,,5161.5-表1.0.3

,3,,電纜敷設,,,√,√,√,√,,,,,5161.1-表4.0.2

,,1,發電機變壓器組系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,2,主廠房廠用電系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,3,全廠直流系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,4,事故保安電源系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,5,照明及檢修電源系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.25161.5-表2.0.4

,,6,開關站及網控室電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,7,輸煤系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,8,除灰系統電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,,9,其他附屬車間電纜敷設,,√,√,,,,,,,,5161.5-表2.0.2

,4,,電力電纜終端制作及安裝,,,√,√,√,√,,,,√,5161.1-表4.0.2

,,1,發電機變壓器組系統電力電纜終端制作及安裝,,√,√,,,,,,,,5161.5-表3.0.2

,,2,主廠房廠用電系統電力電纜終端制作及安裝,,√,√,,,,,,,,5161.5-表3.0.2

,,3,全廠直流系統電力電纜終端制作及安裝,,√,√,,,,,,,,5161.5-表3.0.2

,,4,事故保安系統電力電纜終端制作及安裝,,√,√,,,,,,,,5161.5-表3.0.2

,,5,照明及檢修電源系統電力電纜終端制作及安裝,,√,√,,,,,,,,5161.5-表3.0.

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論