1、建筑裝飾工程施工合同示范文本頁(yè)腳內(nèi)容6Contract for Decoration ProjectParty A (full name):Party B (full name):This Contract is concluded on the basis of the project details by and between the foresaid Party A and Party B in accordance with Contract Law of People s Republic of China and Construction Engineering Contract
2、 Regulations1. Overview1.1 Project name:1.2 Project site:1.3 Project content:1.4 Means of contract:1.5 Construction Period is from date of commence of , to completion date of1.6 Quality standard:1.7 Contract price:2. Party A s Responsibilities2.1 Party A shall providecopy of confirmed construction d
3、rawings or instructions toParty BDays prior to the date of commence, clear up all or parts of the buildings, andremove barriers. Party A will take protective measures for the remaining furniture and furnishings. Party A also needs to provide water, electricity, gas and telecommunications, and indica
4、te matters needing attention to Party B. Party A will be responsible for going through all the applications and approval procedures related to the project.2.2 Party A assigns to be the representative. He will be responsible for the supervision and control over the project, and handle the acceptance,
5、 alteration, registration formalities.2.3 Party A entrustswith the construction supervision of this project. Thesupervision company appoints to be the general supervision engineer, clarifiesParty B.his responsibilities in the supervision contract, and submitscopy of the contract to2.4 Party A shall
6、be responsible for protecting the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged, and bear corresponding costs.2.5 If it is really necessary to change the original building structure or pipelines, Party A shall be responsible for going through the correspondin
7、g approval procedures.2.6 Party A will coordinate with relevant departments to do on-site security, fire protection, waste disposal, etc., and bear the corresponding costs.3. Party B s Responsibilities3.1 Party B must be available to attend meetings organized by Party A and prepare construction plan
8、 and schedule.3.2 Party B assigns as the site resident representative. He will be responsible for construction organization and completion of the project with good quality.3.3 Party B shall strictly implement the construction specifications, safety operation procedures, fire safety regulations, and
9、environmental protection regulations. It must strictly execute construction abiding by construction drawings or practice instructions, and complete the quality inspection record. Party B must participate in the final completion acceptance, and prepare the project settlement.3.4 Party B must abide by
10、 the provisions on the management of the construction sites by the national or local government and related departments, protect the surrounding buildings, equipments, pipelines, trees and landscaping from being damaged. Party B also need to do a good job in such things as the construction site secu
11、rity and garbage disposal, and deal well with the issue of disturbing residents brought about by construction.3.5 Without Party As consent or approval of relevant departments, Party B shall not make any unauthorized changes to original building structure or pipelines.3.6 Party B shall be responsible
12、 for protecting all the facilities and finished projects before the project is handed over to Party A.4. Construction Period4.1 When Party A needs to complete the project ahead of the time limit, it should obtain Party Bs agreement and pay the cost for the measures that Party B takes to crash the sc
13、hedule.4.2 If the project progress is influenced by the delay of Party As delivery date, the practically impacted cycle extends accordingly.4.3 If the project can not be started on time or shutdown halfway for no reason because of Party Bs responsibility, the practically impacted cycle can not exten
14、d accordingly.4.4 The project duration shall be prolonged when the downtime is over eight hours (accumulated in one week) caused by the power failure, water failure,qas stop and force majeure factors because of design changes or reasons not related to Party B.5. Quality Standard and Acceptance Inspe
15、ction5.1 This project takes construction drawings, instructions, design changes and national construction and acceptance specifications such as Construction and Acceptance Standards of Decoration Engineering (JGJ73-91 )Unified Quality Inspection and Assessment of Architectural Installation Work (GBJ
16、300-88) as quality assessment and acceptance standards.5.2 Quality of the project should meet the acceptance criterion of national quality assessment. If all or parts of the project reach to the excellent standard, Party A will pay to Party B increased costs.5.3 Party A and Party B shall promptly ha
17、ndle the concealed work inspection procedures of pre-acceptance in the middle of the project. If Party A do not organize covert acceptance in time, Party B can make self-inspection and Party A shall admit the result. If Party A requires the re-inspection, Party B shall be in accordance with the requ
18、irements lor the re-inspection. If the re-inspection result is acceptable, Party A shall bear the re-inspection fee and the project duration can be extended accordingly; if re-inspection result is not acceptable, the re-inspection and reworking costs shall be borne by Party B, and the project durati
19、on shall also be extended accordingly.5.4 If materials provided by Party A for the construction do not meet the necessary requirements, Party A shall bear responsibility for any resulting delays in the completion of the project.5.6 When the Project is ready for final acceptance, Party B shall submit
20、 to Party A thefull as-built documentations and completion acceptance report. Party A shall organizethe acceptance within 5 day after receiving all the documents. When Party A can not5.5 If the quality of Party Bs work results in any accidents, liability for such accidents shall be borne by Party B.
21、conduct the acceptance within the time specified in the Contract, Party A shall inform Party B without delay and determine another date for the acceptance. Party A, however, shall admit the completion date of the Decoration Project and be liable for the expenses for taking care of the construction b
22、y Party B and other relevant expenses.6. Contract Prices & Settlement6.1 The Parties agree to determine the contract price pursuant to mode below:(1) Fixed price(2) Fixed price, combined with _/% risk rate (including/)(3) Adjustable price: make adjustments and settlement according to relevant state
23、regulations6.2 Party A shall makepayments after the Contract comes into effect. Finalpayment will be made after completion of the project.Timing of PaymentsPayment ProportionAmount6.3 After final acceptance of construction, Party B will make the engineering settlement and transfer the relevant docum
24、ents to Party A. Party A shall complete reviewing of the documents within / days. Where Party A fails to raise an objection, its consent shall be deemed to have been given. The final payment shall be made within / _ days.7. Material supplies7.1 Party A is in charge of purchasing the supplied materia
25、ls and equipments (refer to Annex). The materials shall be qualified and meet the design requirements, and be delivered to the scene in time. If Party B is responsible for picking up the materials, Party A shall hand over delivery documents to Party B and let Party B bear the transportation expense.
26、 Party A shall be responsible for the damages to the project caused by quality problems or specification differences of the materials and equipment supplied by Party A. Party B is responsible for storage of materials provided by Party A, and Party A shall pay / % of the material value as the storage
27、 fee. Party B shall be responsible for the compensation associated with the loss caused by improper storage of Party B.7.2 Materials provided by Party B: Any materials or equipment supplied by Party B whic h do not meet the design and construction requirements are prohibited. If the materials have b
28、een used, the loss caused shall be assumed by Party B.8. Safe Production and Fire Regulations8.1 Construction drawings provided by Party A or practice that should comply with the fire regulations of the Peoples Republic of China and the relevant fire safety rules.8.2 Party B should strictly abide by
29、 Engineering Safety Technical Regulations for Construction and Installation, Safety Operation Proceduresi Fire Control Regulation and other relevant laws and regulations.8.3 Party A shall bear all the resulting economic losses if the drawings or instructions violate the safety operating rules, fire
30、control and fire prevention design specifications.8.4 Party B shall bear all the resulting economic losses if its construction process violates the safety operating rules, fire control and fire prevention design specifications.9. Rewards and Liabilities for Breach of the Contract9.1 If Party A cause
31、s any delays to the completion of this project, then Party A must pay to Party B for each day beyond the scheduled completion date. A fine ofwill be imposed in respect of each day that the payment is overdue.9.2 If Party B causes any delays to the completion of this project, then Party B must pay to
32、 Party A for each day beyond the scheduled completion date. If theproject needs to be completed ahead of the time limit, a reward of will beprovided by Party A in respect of each day before the scheduled completion date.9.3 If all or parts of the project reach to the excellent standard, Party A will
33、 pay to Party B as a reward.9.4 Party B shall protect the equipments provided by Party A, furniture, furnishings and finished products placed on site. If losses are caused, Party B shall bear the compensation responsibility.9.5 If Party A instructs Party B to make any alterations to a load bearing w
34、all and Party A has not sought and received permission from the building property management, Party A shall be responsible for any resulting costs and shall indemnify Party B for any additional expenses incurred.9.6 If Party B makes any unauthorized changes to load bearing walls or building pipeline
35、s and such changes result in damages or loss, it shall be the responsibility of Party B to pay for such loss.9.7 Party A shall be responsible for any extra costs incurred due to his use of the property before the final completion meeting and signing of the “ EngineeringQuality Acceptance ” document.9.8 If a party suspends its performance, it shall timely notify the other party and be liable for all losses thus incurred to the other party.10. Deputes10.1 If there is any dispute between the two parties, the parties should solve through negotiation o
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 二年級(jí)數(shù)學(xué)下冊(cè) 三 生活中的大數(shù)第6課時(shí) 比一比(1)教學(xué)設(shè)計(jì) 北師大版
- 人教部編版(2024)七年級(jí)2025年賣(mài)油翁教案及反思
- 人教版生物八年級(jí)上冊(cè)6.1.1《嘗試對(duì)生物進(jìn)行分類(lèi)》教學(xué)設(shè)計(jì)
- 人教部編版 九年級(jí)歷史下冊(cè)第10課 《凡爾賽條約》和《九國(guó)公約》教學(xué)設(shè)計(jì)
- 人教 版五年級(jí)美術(shù)下冊(cè)《第3課 抽象的雕塑》教學(xué)設(shè)計(jì)
- 人教版歷史八上第22課科學(xué)技術(shù)與思想文化教學(xué)設(shè)計(jì)2份 (2份打包)
- 專(zhuān)題11 標(biāo)點(diǎn)符號(hào)之問(wèn)號(hào)(教案)-2024-2025學(xué)年高考語(yǔ)文一輪復(fù)習(xí)之語(yǔ)言文
- 九年級(jí)英語(yǔ)上冊(cè) Unit 4 I used to be afraid of the dark Section B(1a-1e)教學(xué)設(shè)計(jì)(新版)人教新目標(biāo)版
- 專(zhuān)題四第1課一、《智能家居》教學(xué)設(shè)計(jì) 2023-2024學(xué)年青島版(2018)初中信息技術(shù)八年級(jí)上冊(cè)
- 人教部編九年級(jí)上冊(cè)歷史第21課《馬克思主義的誕生和國(guó)際工人運(yùn)動(dòng)的興起》教學(xué)設(shè)計(jì)
- 廢舊鋰電池回收利用技術(shù)課件
- 區(qū)域醫(yī)學(xué)檢測(cè)中心的建設(shè)與管理V3
- 北京市矢量地圖-可改顏色
- 技術(shù)轉(zhuǎn)移案例
- 旅游公司抖音代運(yùn)營(yíng)合同范本
- 草莓水果課件教學(xué)課件
- 醫(yī)生護(hù)士家長(zhǎng)進(jìn)課堂助教兒童醫(yī)學(xué)小常識(shí)課件
- 中學(xué)生廉潔教育課件
- 八上第三單元《紅星照耀中國(guó)》紀(jì)實(shí)作品閱讀課公開(kāi)課一等獎(jiǎng)創(chuàng)新教學(xué)設(shè)計(jì)(表格式)
- 匯率超調(diào)模型
- 減數(shù)分裂和受精作用-2025年高考生物一輪復(fù)習(xí)練習(xí)(新人教新高考)
評(píng)論
0/150
提交評(píng)論