工程設(shè)計合同(中英文)_第1頁
工程設(shè)計合同(中英文)_第2頁
工程設(shè)計合同(中英文)_第3頁
工程設(shè)計合同(中英文)_第4頁
已閱讀5頁,還剩10頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進行舉報或認領(lǐng)

文檔簡介

1、建設(shè)工程設(shè)計合同Engineering Service Contract(專業(yè)建設(shè)工程設(shè)計合同)(Professional Engineering Service Contract For Construction Project)工程名稱:Name of the project:工程地點:Location of the project:合同編號:(由設(shè)計人編填)Contract No.:(Filled in by the Designer)設(shè)計證書等級:Level of the design certificate:發(fā)包人:Employer:設(shè)計人:Designer:簽定日期:Date of

2、 contract:江蘇省建設(shè)廳監(jiān)制江蘇省工商行政管理局Supervised by: Jiangsu Provincial Department of Construction Jiangsu Provincial Administration for Industry and Commerce發(fā)包人 :Employer: (Party A)設(shè)計人 :Designer: (Party B)發(fā)包人委托設(shè)計人承擔工程設(shè)計 , 工程地點為, 經(jīng)雙方協(xié)商一致 , 簽訂本合同 , 共同執(zhí)行。The Employer entrustthe Designerto undertake the engineer

3、ingdesignof*and the locationforthe projectis within the plant of.Afterfriendly consultation,the Partieshereby sign this Contractas follows:第一條本合同簽訂依據(jù)。Article 1Basis for the conclusion of this Contract1.1 中華人民共和國合同法 、中華人民共和國建筑法 、 建設(shè)工程勘察設(shè)計市場管理規(guī)定。1.1The Contract Law ofthe Peoples Republic of China; The

4、 ConstructionLaw of the Peoples Republic of China; Regulations on the Administrationof the Market for Survey and Design of Engineering Construction.1.2國家及地方有關(guān)建設(shè)工程勘察設(shè)計管理法規(guī)和規(guī)章。1.2National and localrules and regulations on the administration of themarket for survey and design of engineering constructio

5、n.1.3建設(shè)工程批準文件。13 Approval documents of the engineering construction第二條設(shè)計依據(jù)。Article 2Basis for design of the engineering construction2.1發(fā)包人給設(shè)計人的委托書或設(shè)計中標文件2.1Letter of Authority or documents on letter of acceptance provided bythe Employer to the Designer.2.2發(fā)包人提交的基礎(chǔ)資料2.2Basic materials submitted by th

6、e Employer.2.3設(shè)計人采用的主要技術(shù)標準是:國家及地方現(xiàn)行的技術(shù)標準和規(guī)范2.3The main technologicalstandards adoptedby the Designer areasfollows:Currentnationalandlocaltechnologicalstandards,rulesandregulations.第三條合同文件的優(yōu)先次序Article 3Priority of the contractual documentsCurrentnationalandlocaltechnologicalstandards,rulesandregulati

7、ons.構(gòu)成本合同的文件可視為是能互相說明的,如果合同文件存在歧義或不一致, 則根據(jù)如下優(yōu)先次序來判斷:1The several documents forming the Contract are to be taken as mutuallyexplanatory ofone another, but in case of ambiguities or discrepancies,the priorityof the documents forming the contract shallbe as follows:3.1合 同書3.1The Contract3.2中標函(文件)3.2Th

8、e Letter of Acceptance (documents);3.3發(fā)包人要求及委托書3.3Requirements of the Employer and letter of authority;3.4投 標書3.4The Tender.第四條本合同項目的名稱、規(guī)模、階段、投資及設(shè)計內(nèi)容(根據(jù)行業(yè)特點填寫)。Article 4 Name,size, stages,investment and contentof design(which may befilled in according to the characteristics of the industry).名稱:Name:

9、規(guī)模:Size:階段:Stage:投資:約萬美元Investment: Aboutdollars設(shè)計內(nèi)容及工作范圍:Design content and work scope:第五條發(fā)包人向設(shè)計人提交的有關(guān)資料、文件及時間。Article 5 Materials and documents delivered by the Employer to the Designer and time for delivery of materials and documents1. 上級部門的批復文件。 ( 合同生效后 )1.Official reply document by higher autho

10、rity(after effectiveness of contract);2. 設(shè)計開始前應提供有關(guān)技術(shù)規(guī)格資料。 ( 合同生效后 )2.The Employer should supply related technological specification documents before starting to design;3. 主管部門對方案設(shè)計的審批意見。 (施工圖開始前提供)3. Official reply of the power supply department on consent of the power supply.(supply before constru

11、ction drawing)第六條設(shè)計人向發(fā)包人交付的設(shè)計文件、份數(shù)、地點及時間。Article6 Deliveryof design documents by the Designer to the contractissuingparty and copies, location and time for the delivery第七條費用。Article 7 Charges27.1 雙方商定,本合同的設(shè)計費為 萬元。收費依據(jù)和計算方法按國家和地方有關(guān)規(guī)定執(zhí)行,國家和地方?jīng)]有規(guī)定的,由雙方商定 。7.1 The Partiesagree thatcharges forthe design

12、hereunder shallbe.The basis for charges and the method of computing shall be in accordancewith relevantnational and localprovisions. Where thereare no relevantnational and local provisions, it shall be discussed and determined bythe Parties.7. 2 如果上述費用為估算設(shè)計費,則雙方在初步設(shè)計審批后,按批準的初步設(shè)計概算核算設(shè)計費。工程建設(shè)期間如遇概算調(diào)整,

13、則設(shè)計費也應作相應調(diào)整。7.2 If the design charges mentioned above are appraised prices, bothparties willcompute design chargesbased on the approved roughestimateof preliminary design after preliminary design approval. If there is rough estimate adjustment in period of engineering construction, the design price

14、will be adjusted accordingly.第八條支付方式。Article 8 Terms of payment8. 1 本合同生效后三天內(nèi),發(fā)包人支付設(shè)計費總額的 30%,計萬元作為定金(合同結(jié)算時,定金抵作設(shè)計費)。8.1 Within three days upon the effectivenessof thiscontract,theEmployershallpay the Designer 30%of contractpricenamely RMBYuanas thedown payment.( The down payment shallbe counted as

15、the charges for designupon settlement of the contract).8.2 設(shè)計人提交 方案 設(shè)計文件后三天內(nèi),發(fā)包人支付設(shè)計費總額的 20%,計萬元;設(shè)計人提交 施工圖 設(shè)計文件后三天內(nèi),發(fā)包人支付設(shè)計費總額的 45%,計萬元;工程完工后,結(jié)清設(shè)計費,不留尾款。8.2 Within three days upon the submission of schematic design documentsby the Designer, the Employer will pay 20% of contract price namely RMBYuan.

16、 Within three days upon the submission of construction drawings bythe Designer, the Employer willpay 45%of contractprice namely RMBYuan.Aftercompletion of the project,theEmployer willpay therest RMB*Yuan, without any remainder.8. 3 雙方委托銀行代付代收有關(guān)費用。8.3 The Partiesshallentrustbank to collectand pay for

17、 relevantcharges.第九條雙方責任。Article 9 Responsibilities of the Parties9.1發(fā)包人責任9.1 Responsibilities of the Employer9. 1. 1 發(fā)包人按本合同第五條規(guī)定的內(nèi)容,在規(guī)定的時間內(nèi)向設(shè)計人提交基礎(chǔ)資料及文件,并對其完整性、正確性及時限負責。發(fā)包人不得要求設(shè)計人違反國家有關(guān)標準進行設(shè)計。發(fā)包人提交上述資料及文件超過規(guī)定期限15 天以內(nèi),設(shè)計人按3本合同第六條規(guī)定的交付設(shè)計文件時間順延;發(fā)包人交付上述資料及文件超過規(guī)定期限 15 天以上時,設(shè)計人有權(quán)重新確定提交設(shè)計文件的時間。9. 1.1 The

18、 Employers ha lls ub mi t t o Design erba sicmat erial sanddoc umen tswi t hins pe cifiedpe riod aspr ov i de di nAr ticl e 5 oft hi s c on trac t and shal lb e resp on sible f orthec omple tene ss , acc ura cy and tim e limit of the m at erials anddocu ments. T he Employe r shalln otrequ ire the De

19、s i gn ertoc ond uc tde signi n v iolation ofre lev an tna tion als ta nda rd s.I n ca se th er e is ad el ayoflessthan 1 5 d ay s e xc eed i ng thes pec if ied t im e limi tf orthede live r yoft heabo vemat er ialsanddo cu ment sbyth eEmploye r,t hetimelimi tf orth eDesign ertode liv erde signdo cu

20、 men tssh al lbeex te nd edac co rd ingl y; in case ther e is a del ay of more than 15 daysex ce ed ing the spec ified t im e limit for the delivery of theabov e mat er ia lsan d do cu ment sbyth e Employ er ,th e De sign ers hall h av e the righ t to re - de te rmin e the time fo r delive ryof the

21、des ig ndoc ument s.9. 1. 2 發(fā)包人變更委托設(shè)計項目、規(guī)模、條件或因提交的資料錯誤,或所提交資料作較大修改,或設(shè)計周期變化,以致造成設(shè)計人設(shè)計返工或工作量加大時,雙方除另行協(xié)商簽訂補充協(xié)議(或另訂合同)、重新明確有關(guān)條款外,發(fā)包人應按設(shè)計人所耗工作量向設(shè)計人支付返工費。在未簽訂合同前發(fā)包人已同意,設(shè)計人為發(fā)包人所做的各項設(shè)計工作,發(fā)包人應支付相應設(shè)計費。9. 1.2Inca seoftheDes igne r sre workonth edes ig nr esu ltedf orch ang esoft heeng in ee ring ,si zea ndc on

22、d itionso f the d es ig n bythe E mpl oy ero r mistak esofthematerialss ub mi ttedormaj orr ev i si ononth esu bmi ttedmaterials,t hePar tiess ha llc on clud esu pplement ar yagreemen tse pa rate ly( orc on cludead dition alagre e ment )andre de finereleva ntt er msandco nd itions ,an dt heEmploy er

23、sh ou ldpa ych ar ge sforr ewor ktot heDesign erac co rd ingto thewor kloa d.TheEmploy erhasag re edbe foret heco nc lu sionoft hec ontra cttha t itwi llp ayc ha rg es o fd es ig n tot heDesign erf orallth e de sign w or kscon du cted b yth eDesigne r.9. 1. 3 在合同履行期間,發(fā)包人要求終止或解除合同,設(shè)計人未開始設(shè)計工作的,不退還發(fā)包人已

24、付的定金;已開始設(shè)計工作的,發(fā)包人應根據(jù)設(shè)計人已進行的實際工作量,不足一半時,按該階段設(shè)計費的一半支付;超過一半時,按該階段設(shè)計費的全部支付。9. 1.3Duringthepe rf or manc eofth ec on trac t,i ft heEmploy erre qu ires tote rm in at eorca nc elth eco ntra ctbeforet he D es igner star tst hedes ign wo rk , th e D e sign erwi llnotre tu rnt hedo wnp ay mentalrea dypa idbyt

25、 heEmploy er ; if the D e sign er has start ed the d e s ig n wo r k, th e4Employ er shal l pay for the actu al work load alre adyd on e b yt he Des ig ne r.When t he act ua lwor kl oadoft hede si gni s lesst han half of the w ork at the sta ge,t he Em ploy er shal l payhalf of the p ay ment for the

26、 design wo rk at the s ta ge. Whent h e a ctua l wor kload o f the design is more than ha lfo f theworkatthe s ta ge , the E mplo ye rs hal lp ay all t he p ay mentf orth ede sign wo r kat the sta ge.9. 1. 4 發(fā)包人必須按合同規(guī)定支付定金,收到定金作為設(shè)計開工的標志。未收到定金,設(shè)計人有權(quán)推遲設(shè)計工作的開工時間,且交付文件的時間順延。9. 1. 4 T he Em pl oye r shou

27、 ld pay d own paymen t a s p ro vid ed byt he cont ra ct a nd r ece ip t ofd own pa y mentw ill bet he symbolf or the co mmen cementofthe d es ig n wo rkbythe De s igne r.TheDesi gn ersh a llhav eth er ig htt opu tofft hec ommen ce mentd ate oft he d es ig n wo r k ifit has not r e ce iv edt he down

28、 pa ymen t a nd t het im e f orde l iver y s ha llbe e x te nd edac co rd in gl y.9. 1. 5 發(fā)包人應按本合同規(guī)定的金額和日期向設(shè)計人支付設(shè)計費,每逾期支付一天,應承擔支付金額千分之二的逾期違約金,且設(shè)計人提交設(shè)計文件的時間順延。逾期超過 30天以上時,設(shè)計人有權(quán)暫停履行下階段工作,并書面通知發(fā)包人。發(fā)包人的上級或設(shè)計審批部門對設(shè)計文件不審批或本合同項目停緩建,發(fā)包人均應支付應付的設(shè)計費。9. 1.5Th e Emplo ye rs ho ul dpaycha r ge sfordes ig nt ot he

29、Design er at the am o un t and date prov id ed in this Cont ra ct.For eachda y ofov e rd uep ay ment ,2 oft heov er duepa ymen ts hallb e p ai d a s damage s f orov er due paymen ta nd the tim ef ordel iv er y byth e Design ers ha llbeexten de d acc or d ingl y.Wh er eth ed el ayo fpay menthase xc e

30、e de d30day s,th eDesign ers ha llhav e the righ t to s us pe nd t he perfo rm an ceof the worka t the nexts ta ge and g iv e writte n not ice t ot heEmploy er.Incas eth ehigh eraut ho rityo rcomp et en tdepa rtment of desi gn appr ov al woul d n ot appr ov e th e desi gndocu ment s o r the e ngine

31、er ing c onstr uc tion oft his c o nt ra cti s su sp en de d orstopp ed ,t heEmployers ho ul d p ay t hep ay ab lec har ge s fo rde sign.9. 1. 6 發(fā)包人要求設(shè)計人比合同規(guī)定時間提前交付設(shè)計文件時,須征得設(shè)計人同意,不得嚴重背離合理設(shè)計周期,且發(fā)包人應支付趕工費。9. 1.6 If the Em ploy er requ ires theD es ig ne r to d eliv er th edesigndo cu ment s i n ad va

32、nc e,i t sho uldge tt he priorc on se ntoft heDesi gn erwi thou tser iousde viat io nf r omt her eas on ab led es ignci rc le , and t he Em pl oy ers ha ll pay thec r us h co st.9. 1. 7 發(fā)包人應為設(shè)計人派駐現(xiàn)場的工作人員提供工作、生活及交通等方面的便利條件及必要的勞動保護裝備。59. 1.7 T he Em ploye r sh ou ld offe r co n ve ni en ce s i n aspec

33、 ts ofworkin g, l iv ing an d t ra ff ican d n ec ess ar y la bo r - prot ec ti onequipmen ts.9. 1. 8 設(shè)計文件中選用的國家標準圖、部標準圖及地方標準圖由發(fā)包人負責解決。9. 1. 8 Th e Em pl oye r s ha llb e r es po nsi bl e for the n a tion als t an da rdd ra wi ng,mi ni st er ia ls ta nda rd d ra wi ng an d loc als t an da rdd ra wi

34、ngs.9. 1. 9 承擔本項目外國專家來設(shè)計人辦公室工作的接待費(包括傳真、電話、復印、辦公等費用)。9. 1.9 The Em ploye r sha llb ea r the expe ns es forrec eivi ngf oreig nex pe rti nch ar ge o ft heeng in ee ringt oth eDesign er s office (in clud in g exp ens es o n fa x , tel ep ho neandof fice a ffairs ).9. 2 設(shè)計人責任9. 2Desi gn er s resp on si

35、 bi lities9. 2. 1 設(shè)計人應按國家規(guī)定和合同約定的技術(shù)規(guī)范、標準進行設(shè)計,按本合同第六條規(guī)定的內(nèi)容、時間及份數(shù)向發(fā)包人交付設(shè)計文件(出現(xiàn) 9. 1. 1、9. 1. 2、9.1.4 、9. 1. 5 規(guī)定有關(guān)交付設(shè)計文件順延的情況除外)。并對提交的設(shè)計文件的質(zhì)量負責。9. 2.1Th eDesign ersho uldcar r you tde signwor kinac co rd a nce with te c hn ol og icalr ulesand stan da rd spr ov id edi n this cont ra cto r the s ta te ,

36、 an d de live r des ign do c umen tsas the c on tent , ti me an d c op ie s s pec ifie d in A rtic le 6o ft hisCont ra ct( exc eptfo r the c ir cu mstan ce sprovi de d inArt.9. 1.1,9. 1.2,9.1.4 ,9.1.5unde rwhic hth edeli ve ryofdesigndo cu ment s maybe ex te nd ed ),an d sh allb e re spo nsi bl ef o

37、rth equ ality o f the d es ign doc ument s.9. 2. 2 設(shè)計合理使用年限為主體結(jié)構(gòu) 50年(磚混或框架結(jié)構(gòu))。9. 2. 2 The des ig n l i fe of t he en gi ne eri ng co ns tr uc ti on s ha ll be mai n st ru ct ure fi ft y ye ar s.9. 2. 3 負責對外商的設(shè)計資料進行審查,負責該合同項目的設(shè)計聯(lián)絡工作。9. 2.3 The De si gne r s ha ll b e res po nsi bl e for th e s c ru t

38、inyon the fore ign inv es to r s d es ign ma te ri alan d co nta cto nt hede sign o ftheen gi ne er ing.9. 2. 4 設(shè)計人對設(shè)計文件出現(xiàn)的遺漏或錯誤負責修改或補充。由于設(shè)計人對設(shè)計錯誤造成工程質(zhì)量事故損失,設(shè)計人除負責采取補救措施外,應免收損失部分的設(shè)計費,并根據(jù)損失程度向發(fā)包人支付賠償金,賠償金數(shù)額最多與受損部分的設(shè)計費相等.9. 2. 4 The Designe r sha llb e res po nsibl e for the re visi onor s up plementt

39、 ot hemi st ak es oro mi ss io noft hed es ig ndocu ments.I fan ye ng inee ringq ual ityac ci de ntsha pp enbeca us e ofthe De s igne r s fau lt,the De sign ersho uld ber esp on sible for ta king remedial me as ur es as well as redu cet he de sign char ge s o n t he a ffec tedpa rt ofthe de sign wo

40、rk6and c ompe ns at e theEmplo ye r acco rdi n g t o t he d eg re e o flo ss.The am ou ntoft he d amag es fo r compensa ti on i s n o mor e t ha nt hede si gnpriceof th e ac tu allo s s.9.2.5由于設(shè)計人原因,延誤了設(shè)計文件交付時間,每延誤一天,應減收該項目應收設(shè)計費的千分之二。9. 2.5 I f the de liv er y o f des ig n d ocu ment s a re delaye d

41、 f ort he De si gn er s reas on , each da y o ve rd ue wi ll resulted i nt her ed uc ti on of2 of t hedesi gn ch ar ge sf ort heengine er ing.9.2.6 合同生效后,設(shè)計人要求終止或解除合同,設(shè)計人應雙倍返還發(fā)包人已支付的定金。9. 2.6 After the c o ntra cte nter s intof or ce , the D e sign ermayr eq ui ret er min ation orc an ce llat ion of

42、 th e c on tractan dt heDesign ers hou l dre turn the downpa ymen tin dou ble.9.2.7 設(shè)計人交付設(shè)計文件后,按規(guī)定參加有關(guān)上級的設(shè)計審查,并根據(jù)審查結(jié)論負責不超出原定范圍的內(nèi)容做必要調(diào)查補充。設(shè)計人按合同規(guī)定時限交付設(shè)計文件一年內(nèi)項目開始施工,負責向發(fā)包人及施工單位進行設(shè)計交底、處理有關(guān)設(shè)計問題和參加竣工驗收。在一年內(nèi)項目尚未開始施工,設(shè)計人仍負責上述工作,可按所需工作量向發(fā)包人適當收取咨詢服務費,收費額由雙方商定。9. 2.7 Up on delive r y ofthe d es igndo cu ment

43、s,th e D es ig ne rs hallp ar ticipa tein the insp ec tion o n the design by ther eleva nthighe raut ho rityasp ro videan ds hallber esp on sible fo rne c es sa ryadj us tme nt an d su pp lement s t o th ec onten t withinthe o rigina ls co pe ofthe d es ign ac c or dingt o the ins pe ctionc on clus

44、io n. TheD es igne r sha ll st ar t thec ons truc tion w ithi n one year up on delive ryo fthe designdocu mentswithi nth esp ec ifiedt i melimi tan ds hallb er esp on siblefo rt hete ch no logic aldisclos ur et ot heEmploy erandc on s truc tionu nit,han dlin gwi thr e leva ntmatter s o n d es igna n

45、d pa rticip atio n in the acce ptance uponc ompletionoft he e ng inee ringc on struc tion.I nca s et heengine er ing con str uc tion has not star te d with ino n e yea r,t he D es ig ne r shall still be r es pon s ible for the abov e w or kand may c ollectre aso na ble s er vicef ee f orco ns ul tan

46、cyfromt he Em ploy erac co r di ng to the needed w or kl oa d.Th e a moun tof thes er vice fee sh all bed is cu ss ed an d de termined bytheParties.第十條保密。Ar ticl e10Conf i de nt ia lity雙方均應保護對方的知識產(chǎn)權(quán),未經(jīng)對方同意,任何一方均不得對對方的資料及文件擅自修改、復制或向第三人轉(zhuǎn)讓或用于本合同項目外的項目。如發(fā)生以上情況,泄密方承擔一切由此引起的后果并承擔賠償責任。BothPartie ssha l lpro te ctea

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論