1、AL ChinaSPECIFICATIONReference: ALC-SP-IM-003Revision: 0Date: 2012-1-21Page: 12/12Owner: ALC IM氫氣魚(yú)雷管車氣站緊急切斷系統(tǒng)H2 TUBE TRAILER GAS STATION EMERGENCY SHUT OFF SYSTEM DISCLAIMER The information contained in this document has been prepared exclusively for internal use by AIR LIQUIDE (CHINA) HOLDING CO.,
2、LTD. and its affiliates ("AIR LIQUIDE CHINA"). Since this document is confidential and proprietary to AIR LIQUIDE CHINA, third parties are not entitled to rely on it in any way. With regard to third parties, AIR LIQUIDE CHINA does not hold itself out as recommending the use of the informat
3、ion contained herein or reliance thereon in any way without its prior approval and AIR LIQUIDE CHINA does not give any warranties on the information contained in this document and assumes no liability or responsibility in connection with the information or suggestions herein contained. AIR LIQUIDE C
4、HINA makes no representations or warranties as to the completeness of this document and disclaims all warranties, express or implied including, but not limited to, the warranty of merchantability and the warranty of fitness for a particular use or purpose. The present document has been issued in Chi
5、nese and in English.This document supersedes the following document(s): RevisionDatePrepared byChecked byApproved byChanges02012-02-28Zhu DanHe Feng; An Xiaofeng; Han XuequnBian Chunlong; Leng Renqiang; He ZhisongLiu LubingNew document1234Template : Nov 2 2011This document is proprietary to the AIR
6、LIQUIDE GROUP and must not be communicated to third parties.This is an uncontrolled copy The only controlled copy is kept in the Alexandria database.目錄TABLE OF CONTENTS1.目的PURPOSE22.適用范圍FIELD OF APPLICATION23.參考文件REFERENCE DOCUMENTS24.設(shè)計(jì)要求DESIGN REQUIREMENT24.1.現(xiàn)場(chǎng)氮?dú)庹竟庠?ON SITE N2 GAS STATION FOR IN
7、STUMANT AIR SOURCE24.2.現(xiàn)場(chǎng)氮?dú)怃撈抗庠?ON SITE N2 CYLINDER FOR INSTRUMENT AIR SOURCE24.3.設(shè)備、閥門(mén)、管道及配件材料 EQUIPMENT, VALVE, PIPELINE AND FITTING MERERIAL25.系統(tǒng)操作SYSTEM OPREATION2APPENDIX 0 修訂記錄REVISION TABLE2APPENDIX 1 主要設(shè)備清單MAIN EQUIPMENT LIST2APPENDIX 2 主要設(shè)備資料MAIN EQUIPMENT INFORMATION21. 目的PURPOSE按照液空集團(tuán)的要求
8、,所有氫氣tube trailer上必須安裝緊急切斷閥,此切斷閥在失效情況下將關(guān)閉(Fail Close,下文以FC表示)。由于該緊急切斷閥是氣動(dòng)閥門(mén),所以需要配置儀表氣源,為了保證儀表氣源的可靠性,除了在Tube Trailer車上配置切斷閥儀表氣源外,在氣站現(xiàn)場(chǎng)還需安裝后備氣源。According to AL group requirement, all H2 tube trailer should install emergency shut off valve, which will be shut off when in failure status (Fail Close, FC
9、in following text). Because this valve is pneumatic type, so instrument air is needed to drive actuator of it, considering reliability of this instrument air source, besides Instrument source for emergency shut off valve is available on tube trailer; back up instrument air source should also be inst
10、alled on site.2. 適用范圍FIELD OF APPLICATION此文件適用于液空中國(guó)IM所有客戶現(xiàn)場(chǎng)氣站和充灌中心。This document applies to all AL IM customer gas stations and Filling centers.3. 參考文件REFERENCE DOCUMENTS此文件參考以下液空內(nèi)部文件最新有效內(nèi)容,除非另有規(guī)定。The documents quoted below are to be used according to the latest issue in valid, unless otherwise stat
11、ed.1GT-SP-CYL-124SPECIFICATIONS FOR HYDROGEN TUBE AND CYLINDER TRAILERS2GT-PR-COM-021SAFETY RULES FOR HYDROGEN INSTALLATIONS AND EQUIPMENT4. 設(shè)計(jì)要求DESIGN REQUIREMENT氫氣tube trailer上配置的切斷閥為FC閥門(mén),安裝在氫氣tube trailer出口手動(dòng)總閥的上游,所需氣源正常工作壓力為7barg,最高工作壓力為9barg。若氣源被切斷且壓力泄放后,緊急切斷閥門(mén)將關(guān)閉,從而切斷氫氣供應(yīng)。因此,當(dāng)現(xiàn)場(chǎng)發(fā)生火災(zāi)等緊急情況時(shí),可能的情
12、況下,操作人員可主動(dòng)將氣源切斷并泄放,停止氫氣輸出。若無(wú)法靠近氫氣站,氣源供氣軟管被燒斷后,也會(huì)切斷氫氣輸出。現(xiàn)場(chǎng)配置的氣源系統(tǒng)有兩種形式:現(xiàn)場(chǎng)氮?dú)庹竟庠春同F(xiàn)場(chǎng)氮?dú)怃撈抗庠础he emergency shut off valve installed on H2 tube trailer is FC type valve, which is installed on the upstream of tube trailer master outlet manual valve. Needed working pressure for instrument air source is 7ba
13、rg, while the highest working pressure is 9barg. If the instrument air source is cut down and pressure is released, the emergent shut off valve will be closed and then stop H2 gas supply. So when fire or other emergency occurs, if possible, operator will cut off instrument air source manually to sto
14、p H2 supply. If operator cannot get close to H2 station, H2 supply will also be stopped while instrument air supply hose is burned out. There are two kinds of instrument air source systems on gas station sites: on site N2 gas station and N2 cylinders.4.1. 現(xiàn)場(chǎng)氮?dú)庹竟庠?ON SITE N2 GAS STATION FOR INSTUMAN
15、T AIR SOURCE如果在氫氣站附近有液空氮?dú)夤庹荆椰F(xiàn)場(chǎng)儲(chǔ)罐或管道氣的壓力可以維持在9barg或更高,推薦使用此氣源作為緊急切斷閥氣源,流程如圖LIN station supply gas-V0:It is suggested to take N2 gas station as emergency shut off instrument air source while two conditions are satisfied: there is a LIN station or N2 pipeline station nearby; the pressure of tank or N
16、2 pipeline is 9barg of higher. P&ID is attached asLIN station supply gas-V0:請(qǐng)注意以下幾點(diǎn):Please pay attention to the following points:l 圖紙以三車位Tube Trailer為例Taking three positions tube trailer station as an example in the drawingsl 若氫氣tube trailer氣站附近為液氮供氣站,氣源從汽化器與氮?dú)庹菊{(diào)壓閥之間直接取出 If there is a LIN statio
17、n nearby, instrument air source is coming from the pipeline between vaporizer and pressure regulator.l 若氫氣tube trailer氣站附近為管道氮?dú)饣蚱渌麣庠矗筛鶕?jù)具體情況從合適的地方取出.If there is a N2 pipeline station or other N2 source nearby, the instrument air source can be taken from the appropriate place according to specific ci
18、rcumstance.l 現(xiàn)場(chǎng)氮?dú)庹練庠矗璞WC能夠提供9barg或者大于9barg的壓力,且能夠持續(xù)為T(mén)ube Trailer提供儀表氣源.For LIN station, the source pressure should be 9barg or higher, and continuously.l 若取出的氮?dú)庠磯毫Ω哂谇袛嚅y所需壓力,需配置雙路調(diào)壓閥,保證供氣的可靠性.If the pressure is higher than which the valve needs, two-way pressure regulator valves should be deployed to
19、 guarantee the reliability of instrument air supply.l 氣源需有壓力變送器監(jiān)控,且監(jiān)控信號(hào)接入teleflo系統(tǒng)或其他監(jiān)控系統(tǒng).The instrument air source should be monitored by pressure transmitter, and the pilot signal is transferred to teleflo system or other monitoring system.l VNG1304三通閥(見(jiàn)圖LIN station supply gas-V0)安裝在氫氣站入口處,便于緊急情況下
20、操作人員操作.VNG1304 three way valve (shown in LIN station supply gas-V0) is installed at the entrance of H2 station in order that operator can handle it conveniently under emergency condition.l 整個(gè)閥門(mén)組可集成在一個(gè)面板上All the valves can be integrated in a same panel.4.2. 現(xiàn)場(chǎng)氮?dú)怃撈抗庠?ON SITE N2 CYLINDER FOR INSTRUMEN
21、T AIR SOURCE氫氣站周圍無(wú)法提供氮?dú)庹竟庠磿r(shí),需在現(xiàn)場(chǎng)配備氮?dú)怃撈考芭涮坠苈穪?lái)為緊急切斷閥提供氣源,流程如圖Cylinder station supply gas-V0:If there is no N2 gas station around the H2 station, it is necessary to configure N2 cylinders and its relevant pipeline to offer instrument air source for emergency shut off valve, P&ID is attached inCyli
22、nder station supply gas-V0請(qǐng)注意以下幾點(diǎn):Please pay attention to the following points:l 圖紙以三車位tube trailer為例Taking three tube trailer positions station as an example in the drawingsl 為了提高氣源的可靠性,系統(tǒng)配置兩用兩備氮?dú)怃撈抗猓遗渲肁utoswitch裝置To improve the reliability of instrument air supply, instrument air source system i
23、s equipped with 4 N2 cylinders (two in use and two as backup), and 1 Autoswitch.l Autoswitch兩側(cè)及下游分別安裝壓力變送器,且壓力信號(hào)接入teleflo系統(tǒng)或其他監(jiān)控系統(tǒng) .Pressure transmitters are installed at both sides and downstream position of Autoswitch, and pressure signals are transferred to teleflo system or other monitoring syst
24、em.l VNG1302三通閥(見(jiàn)圖Cylinder station supply gas-V0)安裝在氫氣站入口處,便于緊急情況下操作人員操作.VNG1304 three way valve (shown in LIN station supply gas-V0) is installed at the entrance of H2 station in order that operator can handle it conveniently under emergency condition.l Autoswitch下游的閥門(mén)組可集成在一個(gè)面板上.All the valves afte
25、r Autoswich can be integrated in a same panel.4.3. 設(shè)備、閥門(mén)、管道及配件材料EQUIPMENT, VALVE, PIPELINE AND FITTING MERERIAL主要設(shè)備清單及資料請(qǐng)見(jiàn)附件。Main equipment list are shown in the attachment請(qǐng)注意以下幾點(diǎn):Please pay attention to the following issues:l 設(shè)備清單以三車位Tube Trailer為例Taking three tube trailer positions station as an e
26、xample in the drawingsl 設(shè)備清單中已詳細(xì)列出了主要材料的型號(hào)及供應(yīng)商,另外還附有主要設(shè)備的資料。接頭數(shù)量需根據(jù)情況配備Model and supplier of main materials are listed in the equipment list in detail, the same with catalog of main equipment. The number of joints is based on specific circumstance.l 為了保證供氣裝置運(yùn)行的穩(wěn)定性和可靠性,需嚴(yán)格按照規(guī)定要求來(lái)選擇材料It should be stri
27、ctly in accordance with requirements in selecting materials to guarantee the stability and reliability of instrument air supply.5. 系統(tǒng)操作SYSTEM OPREATION以三車位Tube Trailer氣站為例,假設(shè)現(xiàn)場(chǎng)車位為車位A,車位B和車位C。車位A和B上分別停放一輛Tube Trailer,車位C為空。A車位上 Tube Trailer出口手動(dòng)總閥打開(kāi),正在使用,B車位上Tube Trailer作為備用。以下以現(xiàn)場(chǎng)氮?dú)庹竟庠礊槔榻B其操作:Taking
28、 three tube trailer positions station as an example, assuming on-site parking positions for vehicle A, B and C. Both parking positions A and B are parked with tube trailers, parking space C is empty. The outlet manual valve of tube trailer on tube trailer A is open and in using, tube trailer B is fo
29、r backup. The following is, taking LIN station N2 as instrument air source as an example, to introduce the operation.(1) A車位和B車位上都停放了Tube Trailer,如流程圖LIN station supply gas-V0中,connection hose分別與兩輛Tube Trailer連接,且調(diào)整三通閥VNG1304A和VNG1304B閥柄,使三通閥a-c向暢通,b-c向關(guān)閉;Two tube trailers are parked in position A a
30、nd B, as inLIN station supply gas-V0, two connection hoses are connected to each tube trailer separately, adjusting valve handle of three-way valve VNG1304A and VNG1304B to a-c way open, and b-c way closed;(2) C車位為空,對(duì)應(yīng)的connection hose未與Tube Trailer連接,調(diào)整三通閥VNG1304C閥柄,保持三通閥b-c向暢通,a-c向關(guān)閉;Parking space
31、C is empty, corresponding connection hose is not connected to tube trailer, adjust handle of three way valve VNG1304C to keep b-c way open, a-c closed;(3) A車用完,B車使用時(shí),現(xiàn)場(chǎng)的緊急切斷氣源系統(tǒng)無(wú)需任何操作,按照原有操作流程即可;When tube trailer A is used up, and B is in use, the on-site emergency shut off instrument air supply sys
32、tem doesnt need any operation, just in accordance with the former operation process.(4) 當(dāng)新來(lái)一輛Tube Trailer停放在C車位上后,將對(duì)應(yīng)的connection hose與車上的氣源連接點(diǎn)相連。When a new tube trailer is parked on position C, connect the corresponding connection hose to tube trailer C.(5) 檢查車載鋼瓶,確認(rèn)鋼瓶出口閥門(mén)已關(guān)閉;Check the truck cylinde
33、r, ensure cylinder outlet valve is closed.(6) 調(diào)整三通閥VNG1304C閥柄,使其a-c向暢通,b-c向關(guān)閉;Adjust the handle of three way valve VNG1304C to keep a-c way open, and b-c closed;(7) 檢查三通閥與Tube Trailer之間的所有連接處,確保無(wú)泄漏;Check all the connections between three way valve and tube trailer to ensure no leakage;(8) 檢查緊急切斷閥,確認(rèn)
34、閥門(mén)已經(jīng)處于打開(kāi)狀態(tài);Check emergency shut off valve, ensure the valve is already open;(9) A車位上的Tube Trailer需要拖走,先調(diào)整VNG1304A閥柄,使b-c向暢通,a-c向關(guān)閉,此時(shí)不但關(guān)閉了現(xiàn)場(chǎng)儀表氣對(duì)A車位Tube Trailer的供氣,而且將VNG1304A的與Tube Trailer緊急切斷閥之間的儀表氣放空;The tube trailer on position A needs to be towed away, firstly adjusting handle of VNG1304A to mak
35、e b-c way open, a-c closed. This action will close the instrument air supply of on-site instrument air to tube trailer, at the same time the instrument air between VNG1304 and Tube Trailer emergency shut off valve is vented;(10) 斷開(kāi)A車位的connection hose;Disconnection the hose of vehicle A(11) 檢查A車位Tube
36、 Trailer緊急切斷閥,確認(rèn)此閥門(mén)已經(jīng)關(guān)閉;Check the emergency shut off valve of tube trailer A to ensure the valve is closed;(12) 按照流程將A車位的Tube Trailer拖走。Tow away the tube trailer on position A in accordance with existing process.請(qǐng)注意以下幾點(diǎn):Please pay attention to the following points:l 操作流程以三車位Tube Trailer為例Taking thre
37、e tube trailer positions station as an example in the operational processl 操作流程以現(xiàn)場(chǎng)氮?dú)庹竟庠礊槔齇perational process is based on LIN gas station for instrument air source.正常情況下,現(xiàn)場(chǎng)氮?dú)庹净蛘攥F(xiàn)場(chǎng)氮?dú)怃撈孔鳛榍袛嚅y氣源主供氣系統(tǒng),而Tube Trailer車上自帶的鋼瓶氣源作為備用,車載鋼瓶出口閥關(guān)閉。當(dāng)現(xiàn)場(chǎng)氣源無(wú)法供氣時(shí),操作人員需手動(dòng)打開(kāi)車載鋼瓶出口閥門(mén),提供備用氣源Normally, on site N2 station or
38、N2 cylinders is the main gas supply system of instrument air source for emergency shut off valve, and the tube trailers own truck cylinder is as reserve, which is always closed. When the on site instrument air source can not work, the operator should open the outlet valve of truck cylinder, supplyin
39、g instrument air as backup source. 新增加了現(xiàn)場(chǎng)儀表氣供氣系統(tǒng),不影響原有氣站的操作。操作上的基本原則是:車輛到達(dá)現(xiàn)場(chǎng)后,先連接儀表氣源,確保現(xiàn)場(chǎng)的車輛無(wú)論是否使用,氣源都在為緊急切斷閥供氣,Tube Trailer上的緊急切斷閥都處于開(kāi)啟狀態(tài)。將Tube Trailer拖離現(xiàn)場(chǎng)時(shí),先切氣源,確保緊急切斷閥關(guān)閉后,再進(jìn)行氣站操作The instrument air source new added in the site does not influence the former operation of H2 gas station. The basic operational principle: After the tube trailer arrives, connecting the instrument
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 純水設(shè)備維修保養(yǎng)合同樣板
- 工程設(shè)計(jì)制式合同協(xié)議
- 馬匹養(yǎng)殖出售合同協(xié)議
- 店面出租正規(guī)合同協(xié)議
- 合同外工程委托協(xié)議格式
- 店面探店出租合同協(xié)議
- 4人合伙人合同協(xié)議
- 合建公司合同協(xié)議
- 合同增加部分補(bǔ)充協(xié)議
- 工程玻璃買(mǎi)賣合同協(xié)議
- 樁基及基坑支護(hù)工程技術(shù)施工方案(三篇)
- 司法考試2024年知識(shí)點(diǎn)背誦版-民法
- 2024年耐磨鑄件項(xiàng)目規(guī)劃申請(qǐng)報(bào)告樣文
- 凝中國(guó)心鑄中華魂鑄牢中華民族共同體意識(shí)-小學(xué)民族團(tuán)結(jié)愛(ài)國(guó)主題班會(huì)課件
- 重度哮喘診斷與處理中國(guó)專家共識(shí)(2024)解讀
- 新能源汽車電控系統(tǒng)的新型傳感器應(yīng)用考核試卷
- 蘇教版數(shù)學(xué)一年級(jí)下學(xué)期期中測(cè)試卷10套及但
- 2024年全國(guó)職業(yè)院校技能大賽高職組(法律實(shí)務(wù)賽項(xiàng))考試題庫(kù)(含答案)
- 全過(guò)程工程咨詢管理服務(wù)方案投標(biāo)方案(技術(shù)方案)
- 中鐵十五局集團(tuán)安全質(zhì)量部管理制度大全
- 2024老年燒創(chuàng)傷創(chuàng)面MEEK植皮技術(shù)規(guī)范
評(píng)論
0/150
提交評(píng)論