1、素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-71排35#樁3.01.9713.91.970.98 2013-12-73排15#樁2.51.9312.91.710.972013-12-749排21#樁1.51.9413.51.710.972013-12-751排11#樁2.31.9514.01.710.972013-12-753排13#樁3.51.9614.61.710.972013-12-773排49#樁0.91.9715.21.710.97
2、2013-12-763排23#樁2.61.9815.81.710.972013-12-797排9#樁1.61.9916.41.710.972013-12-7101排87#樁1.02.0017.01.710.972013-12-7123排93#樁2.31.9513.41.720.982013-12-825排54#樁1.21.9614.01.720.982013-12-851排26#樁4.21.9714.51.720.982013-12-853排16#樁1.01.9815.11.720.982013-12-873排58#樁1.61.9915.71.720.982013-12-877排62#樁3.5
3、2.0016.31.720.982013-12-897排82#樁1.72.0116.71.720.982013-12-8101排96#樁0.61.9613.31.730.982013-12-8113排90#樁1.81.9713.91.730.982013-12-97排53#樁1.61.9814.51.730.982013-12-911排69#樁1.81.9915.01.730.982013-12-925排16#樁1.22.0015.61.730.98施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣
4、樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-929排34#樁4.01.9713.91.970.982013-12-961排12#樁3.82.0116.21.730.982013-12-965排18#樁0.82.0216.81.730.982013-12-950排63#樁1.71.9813.11.750.992013-12-954排91#樁1.51.9913.71.750.992013-12-978排15#樁2.62.0014.31.750.992013-12-9137排55#樁2.12.0114.91.750.992013-12-1039排99#樁1.
5、92.0215.41.750.992013-12-1026排55#樁1.32.0316.01.750.992013-12-1030排25#樁1.52.0416.61.750.992013-12-1050排26#樁1.92.0517.11.750.992013-12-1054排38#樁2.41.9913.11.760.992013-12-1074排92#樁2.82.0013.61.760.992013-12-1078排52#樁1.62.0114.21.760.992013-12-1098排12#樁1.42.0214.81.760.992013-12-10102排30#樁2.52.0315.31.
6、760.992013-12-10109排26#樁1.32.0415.91.760.992013-12-10111排10#樁2.42.0516.51.760.992013-12-10113排72#樁1.82.0617.01.760.992013-12-1030排53#樁4.31.94 13.21.710.972013-12-107排61#樁1.71.9413.61.710.97施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注201
7、3-12-10126排05#樁3.5m1.9713.91.970.982013-12-101排131#樁4.21.9413.91.710.972013-12-1025排149#樁1.91.9514.11.710.972013-12-1130排2#樁2.41.9614.71.710.972013-12-1141排18#樁3.61.9614.81.710.972013-12-1190排66#樁3.01.9715.31.710.972013-12-1198排32#樁1.81.9815.81.710.972013-12-11100排50#樁2.51.9815.91.710.972013-12-1143
8、排108#樁1.91.9816.11.710.972013-12-1268排89#樁2.51.9513.41.720.982013-12-1256排55#樁3.61.9413.11.720.982013-12-128排21#樁2.11.9613.71.720.982013-12-1231排59#樁2.41.9714.31.720.982013-12-1235排61#樁2.11.9814.91.720.982013-12-1247排23#樁3.61.9815.41.720.982013-12-12114排27#樁2.81.9916.61.720.982013-12-12124排36#樁 3.42
9、.0117.01.720.982013-12-1243排37#樁2.41.9513.61.720.982013-12-1260排77#樁1.61.9714.71.720.982013-12-1272排49#樁2.81.9815.01.720.982013-12-1242排109#樁1.31.9815.21.720.98施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-1279排106#樁4.11.9915.81.7
10、20.982013-12-1283排141#樁2.62.0016.31.720.982013-12-1310排26#樁3.41.9512.91.730.982013-12-1321排55#樁3.61.9613.51.730.982013-12-1386排58#樁2.41.9714.01.730.982013-12-1368排64#樁1.31.9814.61.730.982013-12-1372排78#樁1.51.9915.21.730.982013-12-1360排16#樁2.12.015.71.730.982013-12-1319排79#樁2.82.0116.31.730.982013-12
11、-1390排08#樁1.92.0216.91.730.982013-12-1356排28#樁2.02.0217.01.730.982013-12-13134排73#樁1.01.9713.91.730.982013-12-13108排25#樁0.91.9814.71.730.982013-12-1324排108#樁1.62.0015.61.730.982013-12-1360排135#樁1.52.0116.41.730.982013-12-136排123#樁1.22.0116.71.730.982013-12-1429排137#樁0.91.9713.11.740.992013-12-1449排1
12、45#樁2.31.9813.81.740.992013-12-1464排146#樁2.81.9914.41.740.992013-12-1482排45#樁2.22.0014.91.740.992013-12-1494排57#樁2.82.0015.51.740.99施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-1431排28#樁2.61.9413.5 1.710.97 2013-12-14116排57#樁2.32
13、.0116.2 1.730.98 2013-12-14120排29#樁1.51.9614.0 1.720.98 2013-12-1435排18#樁1.11.9815.8 1.710.97 2013-12-14132排19#樁2.92.0014.3 1.750.99 2013-12-1567排25#樁4.21.9413.5 1.710.97 2013-12-1571排13#樁1.92.0115.5 1.740.99 2013-12-1557排57#樁2.41.9915.7 1.720.98 2013-12-152排19#樁3.61.9814.5 1.730.98 2013-12-15104排18
14、#樁3.01.9713.2 1.740.99 2013-12-1547排115#樁1.82.0013.6 1.761.00 2013-12-1569排135#樁2.51.9813.1 1.750.99 2013-12-15140排48#樁1.91.9714.5 1.720.98 2013-12-1519排62#樁2.52.0115.5 1.740.99 2013-12-15144排45#樁3.61.9916.4 1.710.97 2013-12-1559排23#樁2.12.0116.9 1.720.98 2013-12-1551排109#樁2.42.0014.9 1.740.99 2013-1
15、2-1667排25#樁2.12.0114.2 1.761.00 2013-12-1671排95#樁3.61.9916.4 1.710.97 2013-12-1657排57#樁2.81.9613.3 1.730.98 2013-12-1621排42#樁 3.41.9815.1 1.720.98 施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-162排19#樁2.61.9914.4 1.740.99 2013-12-
16、166排29#樁2.31.9815.8 1.710.97 2013-12-16140排63#樁1.52.0114.9 1.750.99 2013-12-16144排65#樁1.11.9915.7 1.720.98 2013-12-16106排24#樁2.91.9713.9 1.730.98 2013-12-16108排20#樁3.31.9813.8 1.740.99 2013-12-1631排106#樁4.22.0114.2 1.761.00 2013-12-1649排150#樁1.91.9913.7 1.750.99 2013-12-166排146#樁2.41.9815.8 1.710.97
17、 2013-12-1734排29#樁3.61.9713.9 1.730.98 2013-12-1736排39#樁3.02.0016.3 1.720.98 2013-12-1748排45#樁1.81.9913.7 1.750.99 2013-12-1780排80#樁2.51.9413.5 1.710.97 2013-12-1784排54#樁1.91.9813.1 1.750.99 2013-12-1794排42#樁2.52.0016.3 1.720.98 2013-12-17116排52#樁3.62.0115.5 1.740.99 2013-12-17120排62#樁2.12.0015.6 1.
18、730.98 2013-12-17132排24#樁2.42.0115.5 1.740.99 2013-12-17128排86#樁2.11.9916.4 1.710.97 2013-12-1767排115#樁3.61.9913.7 1.750.99 2013-12-1783排137#樁2.81.9815.8 1.710.97 施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-1820排35#樁2.62.0114.2
19、1.761.00 2013-12-1824排49#樁2.31.9813.8 1.740.99 2013-12-181排88#樁1.52.0116.2 1.730.98 2013-12-185排98#樁1.11.9916.4 1.710.97 2013-12-1881排54#樁2.91.9813.1 1.750.99 2013-12-1885排59#樁1.51.9815.8 1.710.97 2013-12-1889排51#樁1.12.0114.2 1.761.00 2013-12-1849排150#樁2.91.9914.4 1.740.99 2013-12-18142排58#樁3.31.981
20、4.5 1.730.98 2013-12-18119排26#樁4.22.0014.3 1.750.99 2013-12-18107排20#樁1.92.0116.9 1.720.98 2013-12-1832排126#樁2.41.9914.4 1.740.99 2013-12-1850排146#樁3.62.0415.9 1.761.00 2013-12-1938排59#樁3.01.9813.1 1.750.99 2013-12-1942排68#樁1.82.0014.9 1.740.99 2013-12-1922排62#樁2.52.0116.2 1.730.98 2013-12-1955排48#樁
21、1.92.0016.3 1.720.98 2013-12-1959排52#樁2.52.0114.9 1.750.99 2013-12-1969排28#樁3.61.9914.4 1.740.99 2013-12-1991排48#樁2.11.9915.0 1.730.98 2013-12-1993排78#樁2.41.9815.8 1.710.97 施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-1959排96#樁2.
22、62.0116.9 1.720.98 2013-12-1995排52#樁2.31.9813.8 1.740.99 2013-12-197排124#樁1.52.0114.2 1.761.00 2013-12-1911排150#樁1.11.9915.0 1.730.98 2013-12-1937排149#樁2.91.9815.1 1.720.98 2013-12-19119排20#樁1.51.9813.1 1.750.99 2013-12-20145排77#樁1.12.0115.5 1.740.99 2013-12-20127排65#樁2.91.9915.7 1.720.98 2013-12-20
23、139排83#樁3.31.9813.8 1.740.99 2013-12-20143排21#樁4.22.0015.6 1.730.98 2013-12-2038排42#樁1.92.0117.5 1.710.97 2013-12-2013排56#樁2.41.9915.7 1.720.98 2013-12-2017排84#樁3.62.0416.6 1.750.99 2013-12-2187排88#樁1.21.9813.8 1.740.99 2013-12-21110排56#樁3.22.0013.6 1.761.00 2013-12-21145排48#樁1.62.0116.2 1.730.98 20
24、13-12-21146排96#樁3.52.0014.9 1.740.99 2013-12-2134排50#樁1.42.0116.9 1.720.98 2013-12-2114排33#樁1.81.9916.4 1.710.97 2013-12-2118排95#樁2.41.9913.1 1.761.00 2013-12-21146排49#樁1.31.9814.5 1.730.98 施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注20
25、13-12-2171排137#樁2.6216.3 1.720.98 2013-12-2177排105#樁2.31.9514.0 1.710.97 2013-12-2155排134#樁1.51.9813.1 1.750.99 2013-12-2246排84#樁1.12.0116.2 1.730.98 2013-12-2214排64#樁2.91.9713.2 1.740.99 2013-12-2243排18#樁1.5213.6 1.761.00 2013-12-2291排109#樁1.11.9815.1 1.720.98 2013-12-22103排129#樁2.91.9413.5 1.710.9
26、7 2013-12-22117排137#樁3.31.9914.4 1.740.99 2013-12-22119排136#樁4.21.9714.5 1.720.98 2013-12-22141排98#樁1.92.0116.2 1.730.98 2013-12-2254排127#樁2.41.9913.1 1.761.00 2013-12-2233排114#樁3.62.0316.7 1.740.99 2013-12-2284排122#樁2.32.0517.1 1.750.99 2013-12-2383排148#樁2.52.0116.2 1.730.98 2013-12-23105排126#樁1.21
27、.9813.8 1.740.99 2013-12-23118排115#樁1.81.9815.1 1.720.98 2013-12-2396排145#樁4.12.0114.9 1.750.99 2013-12-23104排143#樁1.32.0315.3 1.761.00 2013-12-23132排137#樁1.51.9713.2 1.740.99 2013-12-23136排127#樁1.41.9913.7 1.750.99 施工單位技術負責人:專業(yè)監(jiān)理員:素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g
28、/cm3含水量%干容重量g/cm3壓實系數備注2013-12-23144排136#樁2.62.0416.6 1.750.99 2013-12-23148排146#樁2.31.9815.1 1.720.98 2013-12-2416排128#樁1.52.0115.5 1.740.99 2013-12-2413排111#樁1.11.9915.0 1.730.98 2013-12-2419排105#樁2.91.9915.7 1.720.98 2013-12-2415排126#樁1.5214.9 1.740.99 2013-12-2492排142#樁1.12.0116.2 1.730.98 2013-
29、12-24104排150#樁2.91.9714.5 1.720.98 2013-12-24109排149#樁3.31.9914.4 1.740.99 2013-12-2497排109#樁4.21.9514.0 1.710.97 2013-12-24101排139#樁1.91.9913.1 1.761.00 2013-12-24143排143#樁2.41.9815.1 1.720.98 2013-12-2478排108#樁3.62.0115.5 1.740.99 2013-12-2587排141#樁2.1217.0 1.710.97 2013-12-25109排144#樁2.51.9713.9
30、1.730.98 2013-12-2597排136#樁4.11.9513.4 1.720.98 2013-12-25101排120#樁2.41.9913.1 1.761.00 2013-12-25102排123#樁1.32.0316.0 1.750.99 2013-12-2687排109#樁1.51.9915.7 1.720.98 2013-12-2699排128#樁2.71.9413.5 1.710.97 2013-12-26102排151#樁3.12.0115.5 1.740.99 施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)
31、化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2013-12-2687排136#樁1.21.9815.8 1.710.97 2013-12-26112排129#樁1.52.0114.2 1.761.00 2013-12-26102排108#樁1.71.9915.7 1.720.98 2013-12-26112排128#樁2.11.9514.0 1.710.97 2013-12-2790排148#樁2.62.0116.9 1.720.98 2013-12-27131排124#樁2.12.0316.7 1.740.99 2013-12-
32、27124排138#樁2.61.9913.7 1.750.99 2013-12-28123排149#樁1.31.9715.2 1.710.97 2013-12-28133排138#樁1.81.9916.4 1.710.97 2013-12-28123排110#樁1.41.9512.7 1.730.98 2013-12-28140排105#樁0.91.9916.4 1.710.97 2013-12-29128排151#樁1.21.9813.8 1.740.99 2013-12-29140排126#樁1.62.0114.9 1.750.99 2013-12-29139排141#樁2.1216.3
33、1.720.98 2013-12-30126排134#樁1.61.9711.9 1.761.00 2013-12-30129排125#樁1.81.9512.1 1.740.99 2013-12-30141排130#樁2.41.9915.7 1.720.98 2014-01-035排139#樁4.12.0318.0 1.720.98 2014-01-0353排167#樁2.51.9915.0 1.730.98 2014-01-0371排221#樁3.71.9413.5 1.710.97 2014-01-03130排130#樁2.92.0114.9 1.750.99 施工單位技術負責人:專業(yè)監(jiān)理員
34、: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2014-01-0423排201#樁1.22.62.0116.9 1.720.98 2014-01-0439排221#樁1.52.31.9813.8 1.740.99 2014-01-04118排167#樁1.71.52.0114.2 1.761.00 2014-01-0449排148#樁2.11.11.9915.0 1.730.98 2014-01-05104排168#樁2.62.91.9815.1 1.72
35、0.98 2014-01-05128排211#樁2.11.51.9813.1 1.750.99 2014-01-05140排155#樁2.61.12.0115.5 1.740.99 2014-01-0571排182#樁1.32.91.9915.7 1.720.98 2014-01-0587排206#樁1.83.31.9813.8 1.740.99 2014-01-06115排179#樁1.44.22.0015.6 1.730.98 2014-01-06106排159#樁0.91.92.0117.5 1.710.97 2014-01-06129排179#樁1.22.41.9915.7 1.720
36、.98 2014-01-0639排156#樁1.63.62.0416.6 1.750.99 2014-01-0650排210#樁2.11.21.9813.8 1.740.99 2014-01-0654排220#樁1.63.22.0013.6 1.761.00 2014-01-0688排156#樁1.81.62.0116.2 1.730.98 2014-01-0754排159#樁2.43.52.0014.9 1.740.99 2014-01-0770排189#樁4.11.42.0116.9 1.720.98 2014-01-0788排179#樁2.51.81.9916.4 1.710.97 20
37、14-01-07141排221#樁3.72.41.9913.1 1.761.00 2014-01-0720排155#樁2.91.31.9814.5 1.730.98 施工單位技術負責人:專業(yè)監(jiān)理員: 素土成樁干密度試驗自檢記錄表工程名稱:高導熱與高密度印制線路板用覆銅板產業(yè)化項目(一期)廠房1 工程取樣日期取樣樁位號取樣深度M濕容重g/cm3含水量%干容重量g/cm3壓實系數備注2014-01-084排197#樁1.21.9413.5 1.710.97 2014-01-0827排225#樁1.52.0116.2 1.730.98 2014-01-0842排205#樁1.71.9614.0 1.
38、720.98 2014-01-0859排215#樁2.11.9815.8 1.710.97 2014-01-08120排222#樁2.62.0014.3 1.750.99 2014-01-09120排215#樁2.11.9413.5 1.710.97 2014-01-099排157#樁2.62.0115.5 1.740.99 2014-01-0947排207#樁1.31.9915.7 1.720.98 2014-01-09105排148#樁1.81.9814.5 1.730.98 2014-01-09136排196#樁1.41.9713.2 1.740.99 2014-01-0929排200#樁0.92.0013.6 1.761.00 2014-01-1043排186#樁1.21.981
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 7-2數字系統設計方法和步驟
- 焦作新材料職業(yè)學院《服裝展示設計》2023-2024學年第二學期期末試卷
- 江西省上饒市廣信區(qū)2024-2025學年初三下學期半期聯考英語試題含答案
- 上海興偉學院《文案創(chuàng)作與活動策劃》2023-2024學年第二學期期末試卷
- 嘉興學院《現代化學實驗與技術》2023-2024學年第二學期期末試卷
- 昆明醫(yī)科大學海源學院《當代長篇小說研究》2023-2024學年第二學期期末試卷
- 蘭州工業(yè)學院《口才訓練》2023-2024學年第二學期期末試卷
- 濟南職業(yè)學院《偏微分方程》2023-2024學年第一學期期末試卷
- 山西省呂梁市文水縣市級名校2024-2025學年初三質量監(jiān)測(三)語文試題試卷含解析
- 錦州師范高等??茖W校《過程裝備與控制工程專業(yè)英語》2023-2024學年第一學期期末試卷
- 工廠5S檢查評分評價基準表(全)
- 江水源熱泵應用杭州奧體主體育場案例分析
- 天然氣制氫裝置拆遷施工安全技術方案
- 部編版三年級語文下冊期中檢測卷課件
- (完整版)供應商審核表
- 說專業(yè)(市場營銷專業(yè))課件
- 火電廠工藝流程圖
- 以“政府績效與公眾信任”為主題撰寫一篇小論文6篇
- 員工獎懲簽認單
- 水腫病患者的護理查房ppt
- 第18章生殖毒性研究
評論
0/150
提交評論