1、上海浦東威立雅自來水有限公司Shanghai Pudong Veolia Water Corporation Limited2019年5月19日07/08/2022演示內容Contents of the presentation 公司簡介General presentation of the company 2019-2009年間改進2019 2009: Improvements07/08/20222合同概況Contract關鍵數據Key Facts1公司簡介General presentation of the company07/08/2022合同概況Contract股權比例(50:50)
2、 Partner (50% vs. 50%)關鍵數據Key events:中國首次引進外國企業負責制水、輸配及服務 First time in China invited foreign investor in charge of water production, distribution and customer service企業性質從國有企業改為中法合資企業 Legal status from State Owned Enterprises to Sino French Joint Venture上海唯一一家股權比例為50/50合資企業 50:50 Joint Venture, onl
3、y 1 in Shanghai上海水務資產經營發展公司Shanghai Water Assets Operation and Development Co., Ltd07/08/20224合同概況Contract服務區域:672 km2Service Area: 672 km25家自來水廠9個泵站 5 Water Treatment Plants, 9 Pumping Stations 管網長度: 3,793 km (diameter 75mm1,800 mm) Network: 3,793 km(管徑75mm1,800 mm)服務人口:4百萬Population served: 4 mill
4、ion水表數量達1,067,000塊 1,067,000 water meters 4 個營業中心4 Agencies 員工總數達12251,225 employees 平均日處理能力達145立方米/天Average daily capacity:1.45 million m3/day07/08/20225生產Production水質Water quality管網管理、無收益水(NRW)、控制中心Network management, NRW, Control Center客戶服務Customer Service人力資源、健康與安全及培訓HR, H&S and Training技術創新與首創I
5、nnovation and initiatives22019 2009年間改進2019 2009: Improvements07/08/20222019-2009: 增長與改進Growth and Improvements20192009服務區域(km2)Service Area (km2)319672+110%管網長度(km)Network Length (km)1,9753,793+92%水表數量(塊)No. of Water Meters573,000 1,067,000+86%售水量(Mm3)Sales Volume (Mm3)277393+42%07/08/20227生產Produc
6、tion5家自來水廠總處理能力達145萬立方米/天:5 water plants with daily capacity of 1.45 Mm3/d:臨江水廠Linjiang WP: 600,000 m3/d凌橋水廠Lingqiao WP: 400,000 m3/d楊思水廠Yangsi WP: 250,000 m3/d 居家橋水廠Jujiaqiao WP: 100,000 m3/d陸家嘴水廠Lujiazhui WP: 100,000 m3/d 2019-2009年間處理能力上升了25%。25% of additional productioncapacity from 2019 to 2009
7、07/08/20228生產Production臨江水廠擴建工程:采用 ACTIFLO 加 TGV濾池緊湊設計增加20萬立方米/天處理能力 Linjiang WTP extension : 200,000 m3/d of additional capacity with compact technology ACTIFLO and TGV filters凌橋水廠進水口:進水口延長360米,確保了取水量并優化了水質。進水泵站改造 Linqiao WTP intake : Extension of the water intake by about 360m. Guaranteed water qu
8、antity and improved water quality. Reconstruction of intake pump station 居家橋水廠更新改造:水質控制、加藥系統、加氯系統、自動化控制、電力系統、水泵 Jujiaqiao Renewal : Water quality control, dosing system, chlorination system, automation and control, power system, pumps錳處理:凌橋水廠、居家橋水廠、楊思水廠、陸家嘴水廠(臨江水廠實施中)Mn Treatment : Linqiao WTP, Juji
9、aqiao WTP, Yangsi WTP, Lujiazui WTP (Linjiang WTP in progress)07/08/20229水質Water Quality2019-2019年間全面滿足國標GB5749-1985要求 Comprehensive compliance with GB5749-1985 regulation during 2019 2019 period為新國標GB5749-2019實施準備中In preparation for compliance with new GB5749-2019 regulation 平均濁度改善Improved average
10、turbidity 出廠水濁度從2019年0.20NTU下降到2009年0.10NTUWater Plant - 0.20 NTU in 2019 to 0.10 NTU in 2009 管網水濁度從2019年0.41NTU下降到2009年的0.26NTU Network - 0.41 NTU in 2019 to 0.26 NTU in 2009 錳達標率從2019年61%上升至2009年97.83%。Manganese compliance Improved from 61% in 2019 to 97.83% in 2009改善水廠水質在線監測 Improved online contr
11、ol in water plants07/08/202210水質Water Quality創建一流化驗室,能開展新國標GB5749-2019 全指標分析Creation of a first-class Central Laboratory capable of analyzing all parameters of GB5749-2019 regulation自2019年起制定自控計劃調查水質情況。Self-control plan to survey water quality since 20192009年采集水樣數達4500個;檢測結果達9萬份。2009: 4,500 samples
12、taken; 90,000 test results per year共設有100個管網水采樣點及25個水質在線監測點100 sampling points and 25 online water quality points in the network跟蹤涉及水質問題客戶來電,有關水質投訴比例大幅度下降低至0.47%。Follow-up of customers calls concerning water quality. Sharp reduction of complains to less than 0.47% of the total07/08/202211管網管理Network
13、 Management管網大規模擴展Significant expansion of the network 從2019年1975km增加至2009年的3793km。1,975 km in 2019 to 3,793 km in 2009管理軟件開發Development of management tools降低無收益水量Reduction of Non-Revenue Water2019年10月整合浦江鎮業務Integration of Pujiang Town in October 20192019年4月整合浦東新區業務Integration of Pudong New District
14、 in April 2019管網長度增加92%。+ 92% network length07/08/20221207/08/202213管網管理Network Management建立水力模型,用于管網診斷、規劃及設計;建立水質模型Implementation of Hydraulic Model of the Network for diagnostic, planning and design; development of water quality model07/08/20221307/08/202214管網管理Network Management建立地理信息系統(GIS),作為地下
15、資產及事件數據庫,為施工作業提供支援: Implementation of Geographic Information System (GIS) as database of underground assets, events and support for operations:管線、閥門、消防栓、水表、壓力點、流量計、水質采樣點、滲漏點修復、停水管理、客戶投訴等Pipes, valves, fire hydrants, all meters, pressure points, flow meters, water quality sampling points, leakage rep
16、aration, water cut-offs, customer complaints07/08/20221407/08/202215管網管理Network Management分區管理:安裝了430個電磁流量計,將管網分成34個水力區域。Zoning project, creation 34 hydraulic zones through the installation of 430 electromagnetic flow-meters07/08/20221507/08/202216管網管理Network Management管網改造新方法- MOSARE(管網分析統計模塊) Impl
17、ementation of new pipe network renewal method - MOSARE2019年起用的新維修工單New reparation sheet in 201907/08/20221607/08/202217管網管理Network ManagementGPS技術應用Implementation of accurate GPS technology便攜GPS Portable GPS實時動態定位RTK07/08/20221707/08/202218無收益水Non-Revenue Water管網中無收益水分布NRW distribution over the netw
18、ork產生無收益水主要原因Main reasons of NRW讀表管理Meter reading management非法用水Illegal connections消防栓管理Fire hydrant management漏損Leakage有效控制措施Measures effective水表GPS定位Meter locating by GPS 向非法用戶寄發律師信Lawyers letter to illegal user員工激勵機制Employee motivation policies07/08/20221807/08/202219控制中心Control Center通過SCADA系統實現
19、水廠、泵站及430個管網網點與控制中心間連接。Water Plant, Pumping Station and 430 network points connected to Control Center via SCADA systemGIS系統,水力模型 GIS, Hydraulic Model統一調度Centralized coordination of operations 優化運行指令(響應,聯系) Optimization of operation instructions (reactivity, communication)系統于2019年12月投入使用System opera
20、ting since December 2019集成信息系統(EXPO) Integrated information system (EXPO)07/08/20221907/08/202220客戶服務Customer Service客戶水表:由4個營業中心負責管理。營業中心同時還負責小型地下水表(約占總售水量37%)管理。Tap meter: Managed by 4 agencies, agencies also managed small underground meter. (around 37% of total consumption)大客戶水表: 指由大客戶部管理管徑大于40mm
21、地下水表(占總售水量50%) Big customer meter: Diameter 40mm underground meter managed by big customer department (around 50% of total consumption)07/08/20222007/08/202221客戶服務Customer Service不同用水性質銷售情況 Water Sales in Categories用水性質水表售水量%住宅95.01%35.02%商業/服務業/行政4.14%23.63%工業0.84%17.83%轉供水0.01%6.05%其他0.00%17.47%總計
22、100.00%100.00%07/08/20222107/08/202222客戶服務Customer Service 呼叫中心Call centerA new call center of 16 positions with 30 employees (7d/7 and 24h/24) opened on 31th December 2019.Customers will be allowed to manage more and more operations without coming to our agencies. 新建呼叫中心設有16個席位,共30名員工,于2019年12月31日投
23、入使用,為客戶提供每周7天,每天24小時全天候服務,讓客戶不必前往營業廳即可辦理各類型業務。新聯系方式:短信、電子郵件、傳真、信函等New means of contacts:SMS, Email, Fax, Letters從5條模擬線路增加到60條數字線路(2條E1線, 每條支持30路電話線) More lines from 5 Analogical lines to 60 Digital lines (2E1/3trunks each)網上繳費系統 (彈出窗口) On line access to the billing system (pop-up screen)網上申訴On line
24、registration of the Claims自動向技術團隊派送工單(新網絡) Automatic transfer of the Service Order to the technical team(using new Network)在營業中心設置遠程呼叫中心Remotes Call Centers in the Agencies采用新統計方法及尖端工具實現呼叫中心監控。New statistics and sophisticated tools to monitor the new Call Center07/08/20222207/08/202223客戶服務Customer S
25、erviceVIP 客戶VIP Customers創建大客戶部Create Big Customer Unit8047 個大客戶( DN 40 mm )約占總售水量50%。 8 047 Biggest Customers (DN 40 mm) represent around 50% of the total volume of our sales.組建專門團隊以新的專業軟件( VIP 系統)負責大客戶水表管理,We have created a special team to manage those meters using a special new Software (VIP Syst
26、em). 為大客戶安裝無線遠傳水表和GSM水表Radio and GSM meters for Big Customers為保障大客戶水表讀表質量,著手安裝GPRS無線遠傳水表。To guarantee the quality of reading of our Big Customers, have started to implement Radio Meters with GPRS transmission. 收集GPS信息,準確定位大客戶地下水表GPS Information is being collected in order to position underground met
27、ers accurately for Big Customers. 07/08/20222307/08/202224人力資源 健康與安全 Human Resources - Health & Safety2019年11月組織健康與安全審查,查出近200個安全風險。已實施強化行動計劃。General Health and Safety audit carried out in November 2019. Near 200 safety risks detected. An intensive action plan has been implemented. 每年檢查健康與安全條件及行動計劃實
28、施情況,制定修正措施Every year, review of conditions and action plan with corrective measures. 健康與安全管理系統:臨江水廠于2019年通過健康與安全國際標準認證( OSHAS18001) Health and Safety Management System: Linjiang WP was certified with the international standard for Health and Safety (OSHAS18001) in 2019. 凌橋水廠及泵站于2019年通過OSHAS18001認證In
29、 2019: Linqiao WTP and Pump Stations OSHAS18001 Certification管網部,客服,浦茂公司于2019年通過OSHAS18001認證 In 2019: Network Department, Customer Service and Pumao Co., OSHAS18001 Certification. 2009年員工總數達1225名 1225 Employees in 200907/08/20222407/08/202225人力資源 培訓Human Resources Training啟動技能本位培訓項目Launching CBT大力推廣
30、各類培訓:技術、財務、健康與安全、英語、管理、IT等。Strong impulse to all trainings: technical, financial, H&S, English, management, IT目標是受訓員工比例達100%。Target of 100% of the employees being trained。人均培訓時數45-50時/年/人, 2019年總培訓時數為655,441小時。45-50 hours training /year/employee. 655,441 hours of training in 2019培訓由本單位在當地組織,或由威立雅水務亞太培訓中心統一安排Trainings organized locally or through VW Asia Pacific受訓員工比例Percentage of trained employees07/08/20222507/08/202226技術創新Innovation過去四年所開展提升技術水平與技術創
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 《人類的起源和發展》人的由來課件-
- 2025年教師招聘考試公共基礎知識心理學試題200題及答案
- 小升初-差倍問題
- 辦公軟件培訓宣傳
- 品牌代理協議范例二零二五年
- 二零二五聯合辦學協議書范例
- 委托他人代簽房屋買賣合同二零二五年
- 激光超聲激勵共熔池slm成形al-zn-mg-cu合金的微觀組織演變與調控機制
- 化妝品改模協議書
- 離婚法律離婚協議變更流程
- EHS部月度管理工作總結
- 2024年廣東省高考化學試題(含答案解析)
- 第12講 國家出路的探索和挽救民族危亡的斗爭 課件-高三統編版(2019)必修中外歷史綱要上一輪復習
- 《外科學》教案:運動系統畸形
- 甘肅省白銀市2024年中考英語真題
- 音樂的美及其鑒賞智慧樹知到答案2024年湖南師范大學
- 2024小語新教材培訓:小學語文教材里的“變”與“不變”
- 防雷與接地裝置安裝方案
- 員工勞動合同模板
- 2024統編新版小學三年級語文上冊第八單元 大單元整體教學設計
- 金屬非金屬露天礦山及尾礦庫重大事故隱患判定標準解讀
評論
0/150
提交評論