1、Keystone Shipping Co.M/V CAPE VICTORYOPERATIONAL PLANM/V CAPE VICTORYOPERATIONS PLANContract No. DTMA98-98-C-00016Prepared By:Keystone Shipping CompanyOne Bala Plaza EastSuite 600Bala Cynwyd, PA 19004-1496Keystone Shipping CompanyPort of Beaumont, Berth No. 1Beaumont, TX 77704Ship ManagersForU.S. De
2、partment of TransportationMaritime Administration Central RegionDISTRIBUTION LISTNo.Location/OrganizationIssue DateCode1Keystone/Vice President OperationsKSC00012OP12Keystone/Vice President FinanceKSC00012OP23Keystone/Fleet AdministratorKSC00012OP34Keystone/Manager of AccountingKSC00012OP45Keystone/
3、Contracting OfficerKSC00012OP56Keystone/ Superintendant EngineerKSC00012OP67Keystone/Superv. Port EngineerKSC00012OP78Keystone/Port EngineerKSC00012OP89Keystone/Purchasing AgentKSC00012OP910Keystone/Contract AdministratorKSC00012OP1011Keystone/Manning ManagerKSC00012OP1112MARAD/MAR-740KSC00012OP1213
4、MARAD CR/SOMOKSC00012OP1314MARAD CR/ACOKSC00012OP1415MARAD CR/COTRKSC00012OP1516MARAD CR/ACOTRKSC00012OP1617Cape Kennedy/MasterKSC00012OP1718Cape Kennedy/Chief EngineerKSC00012OP18TABLE OF CONTENTSI.OPERATIONAL OVERVIEW1A.General1B.Management Responsibilities1C.Naval Operational Control - COMSC INST
5、RUCTIONS3D.Responding to Directives4E.Navy Recommendations During OPCON4F.ROS During Phase 05G.Cost Reimbursement and Liability5II.SHOREBASED MANAGEMENT PROCEDURES - PHASE 0, (OPERATIONS)6A.Keystone Shipping Company RRF Ship Management Organization6B.Ship Management Organization Functions11C.Ship Hu
6、sbanding14III.SHIPBOARD ORGANIZATION DURING PHASE 0, (OPERATIONS)17A.Principal Job Responsibility by Crew Position17B.Personnel Working Hours32IV.NAVIGATION POLICY33A.General Requirements33B.Vessel Bridge to Bridge Radio Telephone Act33C.Use of Radar Plotting33D.Maintaining Schedules34E.Pilotage34F.
7、Masters Presence on the Bridge35G.Chief Engineers Underway Station35H.Persons Allowed in Pilot House and on Bridge35I.Lookouts36J.Anchors36K.Change of Watch36Rev 1viiTable of ContentsV.DECK OPERATIONS37A.General Requirements37B.Cargo Handling Procedures40C.Cargo Handling Safety Procedures43VI.ENGINE
8、ERING OPERATIONS46A.General Requirements46B.Testing46C.Lifeboats, Life Rafts, Associated Equipment and Support Systems47D.Records, Logs and Publications47E.Submit Required Reports47VII.VOYAGE MAINTENANCE AND REPAIR51A.Definitions51B.General52C.Preventative Maintenance53D.Perform Minor Repairs53E.Voy
9、age Repairs54F.Emergency Repairs54G.Vessel Foreign Repair Duty55H.Delegation of Responsibility for Foreign Repair56I.Drydocking56J.Requesting Laytime56VIII.STEWARDS DEPARTMENT OPERATIONS57A.Crew Food Service Operation57B.Crew Hotel Services57IX.COMMUNICATIONS, REPORTING AND RECORD KEEPING PROCEDURES
10、58A.Communications Procedures58B.Record Keeping and Reporting62X.PERSONNEL AND PAYROLL66A.General66B.Ships Accounts Administration68C.Personnel Administration72D.Personnel Procedures, Documents and Forms81XI.PURCHASING88A.General88B.Purchasing Authority88C. Procedure for Signature Control of Control
11、led Equipage90XII.MEDICAL SERVICES (SHIPBOARD)91A.Medical Requirements for Embarked Personnel91XIII.CONTROL OF PROHIBITED SUBSTANCES94A.Control of Alcoholic Beverages94B.Narcotics, Controlled Substances and Marijuana94C.Gambling95D.Narcotics Disposal95XIV.SHIPBOARD SERVICES96A.Slop Chest96B.Self Ser
12、vice Laundry97C.Recreational97XV.SAFETY AND LOSS PREVENTION98A.General98B.Shipboard Safety98C.Accident Investigation100D.Accident Reporting100E.Typical Accident Producing Hazards101F.Emergency Drills103G.Integrity of Safety Devices and Watertight Openings103XVI.CASUALTY AND EMERGENCY RESPONSE PLANS1
13、04A.General104B.Notification104C.Shipboard Casualty Response105D.Oil/Hazardous Materials106E.Grounding109F.Collision111G.Flooding113H.Fire114I.Salvage and towing115J.Hurricanes and Extreme Weather Conditions115K.Solid Waste Disposal116XVII.PHYSICAL SECURITY118A.General Considerations118B.Responsibil
14、ities and Shipboard Security Organization120C.Inport Personnel Security Requirements122D.General Procedures - Terrorism, Bomb Threats and Stowaways123XVIII. HANDLING AND TRANSPORTATION OF AMMUNITION AND OTHER HAZARDOUS CARGO128XIX.PROCEDURES TO BE FOLLOWED TO PREPARE FOR LAY-UP129A.Phase Down of Ope
15、rations129B.Preparations of Systems132C.Schedule of Crew Phaseout138D.Updating Lay-Up Specifications138XX.UPDATING OF OPERATIONAL PLAN140Keystone Shipping Co.M/V CAPE VICTORYOPERATIONAL PLANAPPENDICES141APPENDIX A - Casualty Report Check Lists, Lloyds Open Formand Insurance FormsAPPENDIX B - Port In
16、formationAPPENDIX C - Emergency Response Plan for Oil/Hazardous MaterialAPPENDIX D - MarAd Solid Waste Management PlanAPPENDIX E - List of FormsAPPENDIX F - Fire and Safety PlansAPPENDIX G - Circular LettersAPPENDIX H - Purchasing ProceduresAPPENDIX I -Personnel AdministrationAPPENDIX J - Duties on
17、Vessel Repairs in Foreign PortsI.OPERATIONAL OVERVIEWA.GeneralThis phase involves the operation of the M/V CAPE VICTORY for either a MarAd or Navy mission, shakedown voyage, sea trial or otherwise prescribed ocean borne activity. Keystone is responsible for all aspects of this phase and is expected
18、to manage and operate the vessel in accordance with good commercial practice, the RRF Operations Management Guidelines and the RRF Logistics Management Manual. The RRF Operations Manual and the RRF Logistics Manual are hereby incorporated into Keystones RRF Operation Instructions by Reference. A cop
19、y of the RRF Operations Management Guidelines and the RRF Logistic Management Manual shall be put onboard the MV/CAPE VICTORY at the time of activation.Once Phase 0, (Operations) is achieved, Keystone shall maintain the M/V CAPE VICTORYs readiness at such a level so that the ship can comply fully wi
20、th immediate sailing orders. At the completions of the operational period, the M/V CAPE VICTORYs OPCON will be redelivered to MarAd, and the vessel subsequently laid up by Keystone.B.Management ResponsibilitiesKeystone is responsible for providing management expertise, personnel, operational and tec
21、hnical support, and supplies to maintain and operate the M/V CAPE VICTORY on behalf of MarAd. MarAds Central Region is assigned responsibilities for administering Keystones Ship Management contract. Keystones Contracting Officer interfaces with the designated ACO and COTR at the Central Region. MarA
22、d Marine Surveyors are engineering management representatives assigned to each RRF ship. They serve as ACOTRs for assigned ships to monitor Ship Manager performance, approve payment for contract deliverables, and determine performance acceptability in addition to providing technical oversight and gu
23、idance. They recommend to the Central Region ACO payment or non payment of fees as outlined in the contract for deliverables and services.During Phase 0, (Operations) Keystone also interfaces with the MSC Area Commands, to coordinate ship operations, repairs and other operational support requirement
24、s. During all program phases, Keystone maintains a direct relationship with its contractors, such as repair facilities, and their various ship suppliers and vendors. Keystone must notify the COTR of any visit of a staff member or vendor to the M/V CAPE VICTORY unless prior blanket agreement has been
25、 reached with the cognizant MarAd COTR. Relationships during Phase 0, (Operations) is shown graphically in Figure 1-1.Rev 1Page 4 of 143PHASE 0, (OPERATIONS) RELATIONSHIPSFigure 1-1C.Naval Operational Control - COMSC InstructionsRRF vessels are public vessels owned by the United States in the custod
26、y of MarAd. During Phase 0, (Operations) control passes to the Commander, Military Sealift Command (COMSC). Instructions received from COMSC for operations of RRF vessels will include ship operating schedules, schedule changes, designation of certain routes and employment plans for cargo operations.
27、 Operational control will be exercised by MSC subordinate Commanders over the stowing, routing, sailing and diversion of RRF vessels. Keystone will maintain each ships material readiness for all operational requirements within the M/V CAPE VICTORYs design capability. Contractual control of Keystones
28、 contract remains with the Maritime Administration at all times.During Phase 0, the M/V CAPE VICTORY will be under the operational control of one of the MSC Area Commands:COMSCLANT, BAYONNE, NJCOMSCPAC, OAKLAND, CACOMSCEUR, LONDON, UKOR COMSCFE, YOKOHAMA, JAPANDepending of where the vessel is locate
29、d. Keystone will keep the Area Commanders and MarAd fully aware of the material condition and readiness status of the M/V CAPE VICTORY.Keystone may be required to operate the M/V CAPE VICTORY during Phase 0 either at or near its outport. The movement of the M/V CAPE VICTORY while in Phase 0 will be
30、directed by MSC. During Phase 0, the Area Commander of another Operational Commander may provide the ship with specific courses/speeds, restricted course routings or similar information for the safety of the ships based on intelligence reports or other information not readily available to the ships.
31、If Keystone is unable to comply with these orders because the M/V CAPE VICTORYs Master determines it jeopardizes the safety of the ship, the M/V CAPE VICTORYs Master must ensure the Operation Commander within one hour, by immediate precedence message, of Keystones intended actions and reasons for no
32、t accepting the direction.M/V CAPE VICTORYOPERATIONAL PLANPage 16D.Responding to DirectivesWhen the M/V CAPE VICTORY is under MSC operational control (OPCON), Keystone is expected to respond to all directives and instructions received from MSC. A representative sample of these directives and instruc
33、tions is contained in the Military Sealift Command (MSC) Standard Operations Manual (SOM). The MSC SOM is hereby incorporated into Keystones RRF Operation Instructions by reference. A copy of the MSC SOM shall be put onboard each Keystone managed RRF vessel at the time of activation by MSC.Any Navy
34、directives or instructions, in excess of routine operating costs already authorized by MarAd Work Orders shall be referred to the MarAd COTR with a cost estimate and funding request.E.Navy Recommendations During OPCONThe MSC SOM frequently addresses reimbursable actions, for example the bunkering of
35、 a vessel. Although COMSC can provide endorsement for a reimbursable action, under the terms and conditions of Keystones contract, COMSC cannot direct or ensure the authorization of reimbursable action, only the designated MarAd ACO can do this. Keystone shall use its judgement during an operational
36、 period with respect to Naval recommendations. For example, Keystone may choose to follow orders to bunker the vessel because of mission dictates. Keystone should notify the MarAd COTR as soon as possible and provide a copy of MSCs written direction or endorsement for reimbursement which ordered the
37、 bunkering. As a rule in contingency, MarAd will not take exception to any directive issued by COMSC. In a peacetime exercise, MarAd may wish to ensure the availability of funding before concurring with the recommendation. If Keystone has any questions with respect to a COMSC directed action/and whe
38、ther he will be reimbursed for it, he should advise the MarAd COTR and/or the ACO and request clarification BEFORE committing himself.Similarly COMSC may recommend a vessel be placed off hire, however COMSC cannot place a vessel off-hire, only the MarAd ACO can authorize a penalty for failure of per
39、formance.F.ROS During Phase 0During some missions it is necessary to place the M/V CAPE VICTORY back into a ROS status for a specified period of time. During this time the size of the crew may be temporarily reduced. Keystones per diem will not be effected by the reduction in crew size. This ROS con
40、dition should not be confused with the ROS crew which is aboard vessels during Phase IV. All Phase 0 responsibilities continue while the vessel is in ROS.G.Cost Reimbursement and LiabilityDuring Phase 0 vessel operating costs are, in general, reimbursable by MarAd. Many reimbursable items, however,
41、require prior approval by the ACO/COTR. If the Master is unclear whether prior approval is required, he should contact the Keystone Contracting Officer, immediately for clarification. Failure to do so could result in significant costs to Keystone which may not be reimbursed by MarAd. Keystone is ful
42、ly liable for operational costs incurred or contracts put in place in excess of the amount authorized in writing by the Contracting Officer or the designated COTR.II.SHOREBASED MANAGEMENT PROCEDURES - PHASE 0, (OPERATIONS)A.Keystone Shipping Company RRF Ship Management OrganizationKeystone Shippings
43、 RRF ship management organization is shown in Figure 2-1. Descriptions of each of the job functions and their relationships within the organization are as follows:Vice President, OperationsReports to:PresidentResponsibilities:Overall responsibility for the RRF ship management contract. Responsible f
44、or the operation, maintenance, manning, safety, regulatory compliance, and operating cost control of RRF ships. Determines and sets company standards for vessel operating procedures and insures that all existing government regulations are complied with. Monitors new regulations that may effect the v
45、essels and plans for their implementation. Responsible for the negotiation of all sea going labor contracts and the manning of the ships. Sets policy concerning safety and insures that the policy is complied with. Insures that all Keystone ships and ships managed by Keystone are properly maintained
46、and that maintenance is done in a timely manner. Responsible for controlling the operating costs of the ships including labor costs, maintenance costs and other operating costs. Responsible for the supervision of all Port Engineers, Manning Manager, Clerical and other staff as required to carry out
47、the activities described above.Contracting OfficerReports to:Vice President, Operations with functional relationships with the Superintendent Engineer, Purchasing Manager, Contract Administrator, Manning Manager and Accounts Manager.Responsibilities:Responsible for overall contract administration of
48、 RRF ship management contracts including liaison with the MarAd ACO/COTR, MSC and the Keystone RRF Port Engineer. Serves as chief point of contact for MarAd and the Navy for all RRF contract matters.Rev 1Keystone Shipping CompanyFigure 2-1The Contracting Officer will administer all contract matters
49、related to Phase 0, (Operations). He will assist in coordinating the activities of the Keystone RRF Port Engineer, the Superintendent Engineer, the Purchasing Manager and Manning Manager. He will be responsible for ensuring that all FAR are complied with and that Navy orders are complied with in acc
50、ordance with the contract. Following contract awards for industrial assistance, the Contracting Officer will be responsible for contract administration, including the preparation of invoices and reporting in coordination with the Accounting Manager.Clerical AssistantReports to:Contracting OfficerRes
51、ponsibilities:Responsible for supporting the Contracting Officer in administering the ship management contract including assisting in reporting and invoicing functions.Superintendent EngineerReports to:Vice President, OperationsResponsibilities:Supervises and directs the RRF Port Engineers. Responsi
52、ble for the maintenance of Keystone owned and managed ships and for the selection and supervision of all engineering officers including the Chief Engineer. Acts as the companys principal technical expert. Responsible for all vessel preventative maintenance and repairs and in general for the overall
53、physical condition of the fleet. Prepares and manages the maintenance program and budget. Responsible for ensuring that the requirements of the MLSRA are complied with as applicable during repair periods. Insures that adequate spare parts are available for the ships. Prepares all custom documentatio
54、n and submittals for foreign repairs. Oversees the design and implementation of all vessel modifications.Port EngineerReports to:Superintendent Engineer and Contracting OfficerResponsibilities:Responsible foe all inspections, monitoring and maintenance in coordination with the Superintendent Enginee
55、r and the MarAd Region COTR/ACO during Phase 0, (Operations). Maintains all MarAd software systems including MARTS. Coordinates with the ACO/COTR as directed by the Contracting Officer. Performs all Phase IV, maintenance on the RRF ship when not activated.Contract AdministratorReports to:Vice President, OperationsResponsibilities:As dire
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權(quán)或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 今年高三語文作文
- 石油化工產(chǎn)品加工工藝考核試卷
- 紙質(zhì)寵物用品市場推廣與營銷策略案例分析考核試卷
- 搶救車的管理和使用
- 5-3同步計數(shù)器的分析1-公式法
- 河南省漯河市2023~2024學(xué)年高一數(shù)學(xué)下學(xué)期5月月考試題含答案
- 河北省石家莊市2024-2025學(xué)年高一下學(xué)期第一次段考數(shù)學(xué)試題【含答案】
- 統(tǒng)編版語文五年級下冊第3課《月是故鄉(xiāng)明》精美課件
- 山東省鄒城市2025年初三3月月考化學(xué)試題文試題含解析
- 蘭州財經(jīng)大學(xué)《影視創(chuàng)意寫作》2023-2024學(xué)年第一學(xué)期期末試卷
- 航天禁(限)用工藝目錄(2021版)-發(fā)文稿(公開)
- 湖北省武漢市2024屆高中畢業(yè)生四月調(diào)研考試數(shù)學(xué)試卷
- MOOC 機械設(shè)計基礎(chǔ)-西安交通大學(xué) 中國大學(xué)慕課答案
- 2024年極兔速遞有限公司招聘筆試參考題庫附帶答案詳解
- 2024年度年福建省考評員考試題庫附答案(基礎(chǔ)題)
- GB/T 4937.34-2024半導(dǎo)體器件機械和氣候試驗方法第34部分:功率循環(huán)
- GB/T 21372-2024硅酸鹽水泥熟料
- 教學(xué)方法導(dǎo)論教師培訓(xùn)課件
- TCALC 003-2023 手術(shù)室患者人文關(guān)懷管理規(guī)范
- 小學(xué)低年級心理健康
- 網(wǎng)絡(luò)傳播概論(第5版) 課件 第4-6章 網(wǎng)絡(luò)傳播形式之短視頻傳播、網(wǎng)絡(luò)傳播中的群體互動、網(wǎng)絡(luò)傳播與“議程設(shè)置”
評論
0/150
提交評論