圓型堆取料機電氣中英文說明書_圖文_第1頁
圓型堆取料機電氣中英文說明書_圖文_第2頁
圓型堆取料機電氣中英文說明書_圖文_第3頁
圓型堆取料機電氣中英文說明書_圖文_第4頁
圓型堆取料機電氣中英文說明書_圖文_第5頁
已閱讀5頁,還剩8頁未讀 繼續免費閱讀

下載本文檔

版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領

文檔簡介

1、 高新技術企業力 科 電 氣 圓型側式懸臂堆料機電控系統使用說明書大連力科技術工程有限公司(本企業通過ISO9001認證) 高新技術企業力 科 電 氣 圓型橋式刮板取料機電控系統使用說明書大連力科技術工程有限公司 High & New Technological Enterprise Electric Control System For Round Size-SideCantilever Material Piling MachineOPERATION MANUALDalian Like Technology Co., Ltd(This enterprise has passed I

2、SO9001authentication) High & New Technological Enterprise Electric Control System For the RoundSize-Bridge Scraper FeederOPERATION MANUALDalian Like Technology Co.,Ltd Electrical Operation Manual For Bridge Scraper Feeder Protection&Faults Total 7 Pages No.6 The whole machine is installed pe

3、rfect protection program, warning and display system. 6.1 Heat Protection for Motor All motor are provided with heat protection. If the motor is overload, the sound annunciator will send out sound and light alarm. 6.2 Other Faults PLC determines the following cases as machine faults: 1. The 299 degr

4、ee stroke limit switch activate. 2. The rake has been exceed front or back limit. 3. Emergency stops. 4. The lubricate oil level is lower than the limit. 5. The inverter faults occur. 6. Middle control machine stops. 7. Rake or scraper coupling over-load. 8. Scraper chain broken. Note:The PLC stops

5、the machine when the faults in this chapter or chapter 6.1 appears. 6.3 Alarm There is also alarm display in the program,and the PLC does not stop the machine. Note:The operator can examine the faults or alarm point by enterring into the message picture when the cases in chapter 6.1 or 6.2 appears.

6、Electrical operation manual For the Bridge type Scraper Feeder Maintenance&Inspection Total 7 Pages No.7 During the daily and periodic maintenance or inspection,Besides the above mentioned points of safety, requirements, regulations, functions etc.,The following must also be included: 1. Inspect

7、 motor frequently. Carry out maintenance according to relative specifications. Before starting motor, manually inspect the loading conditions. 2. Check the cabinets, cases and electrical elements regularly. Pay attention at any moment that dust and foreign material shall not enter into the cabinets

8、and cases. Blow and clean once every shift. 3. The thermal-overload relays have been calibrated before leaving factor or during debugging. customer shall not adjust 4. Pay attention to the temperature, humidity and environment in console. Cabinets shall be dry because the touch screen and PLC, etc. are

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
  • 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
  • 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

最新文檔

評論

0/150

提交評論