




版權說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權,請進行舉報或認領
文檔簡介
SECTION10270PART1--WORKThisSectionspecifiestherequirementsnecessarytofurnishandPedestalfloorsupportforstringerframingRemovablefloorpanels,notedas‘CAF’ontheRELATEDUsethisSectiononjunctionwiththefollowingotherspecificationsandrelated stoestablishthetotalrequirementsforaccessflooring:TheDivision1sectionsludedintheprojectDrawings:ExtentandinstallationCAUTION:UseofthisSectionwithoutludingtheabove-listeditemsresultsinomissionofbasicrequirements.SYSTEMElevatedpedestalandstringerframegridwithrigidfloorCISCA(CeilingandInteriorSystemsConstructionAssociation): TestProceduresforAccessFloors.DESIGNFloorsystemcomponentcapacitiesshallbeverifiedbyengineeringcalculationsbearingthesealofaprofessionalengineerrecognizedbytheAuthorityHavingJurisdictionorbyproject-specifictestingperformedunderthedirectionofaprofessionalengineerrecognizedbytheAuthorityHavingJurisdiction.Testsshallaccountforvariationsinmaterialpropertiesbetweenactualcomponentstestedandminimumpermittedmaterialproperties.DesignLoadsasdefined mendedTestProceduresforAccessCompletedsystemofpanelsonstringerandpedestalsystemtosupport,withoutpermanentdeformation:DesignLoad:1361kilograms(3000pounds)appliedto645squaremillimeters(1squareh).Rollingload,10passes:1225kilograms(2700Rollingload,10,000passes:189kilograms(2400Impactload:91kilograms(200UltimateStrengthofAll2timesthedesignloadwithoutfailureforpedestals,panels,and2.5timesthedesignloadwithoutfailureforfloorsystemSeismicLoad:asnotedinSection01001,ProjectSiteDesignWarrantyshallbeforaminimumperiodof5yearsdefectsinmaterialand/orworkmanship.Completedinstallationshallbewarrantedjointlyandseverallyona bythematerialsmanufacturerandinstallerdefectsofmaterialsandworkmanshipasdefinedonthewarranty.QUALITYInstallerQualifications:EngageaninstallerIsacceptabletoaccessflooringHassuccessfullycompletedwithinthelast3yearsatleastthreeaccessflooringinstallationssimilarintypeandsizetothatofthisproject.Willassignmechanicsfromtheseearlierinstallationstothisproject,ofwhichonewillserveasleadmechanic.CoordinateworkwithsubfloorworkandutilitiesasScheduleworktocommenceaftersubfloorfinishhasPreinstallationConference:PriortoinstallationofaccessflooringandatContractor'sdirection,meetattheprojectsitetoreviewmaterialselections,applicationprocedures,andcoordinationofworkwithothertrades.MeetingshallludeOwner,Engineer,Contractor,installer,componentmanufacturingrepresentative,andotherswhoseworkrequirescoordinationwithaccessfloorMarkpedestallocationsonsubfloorsothatmechanicalandelectricalworkcantakecewithoutinterferingwithinstallationofpedestals.Donotproceedwithinstallationofaccessflooringuntilsubstantialcompletionofotherworkwithinareastoreceiveaccessflooring.ENVIRONMENTALDonotproceedwithinstallationofaccessflooringuntilinstallationareaisenclosedandhasanambienttemperatureofbetween4.4degreesCand32.2degreesCandarelativehumidityofnotmorethan70percent.DELIVERY,STORAGE,ANDDelivermaterialsintheiroriginalunopenedExercisecareinhandlingcomponentstopreventStorematerialsinsuchamannerastopreventdamageorintrusionofforeignmatter.Conspicuouslymark"rejected"onmaterialsthataredamagedandremovefromAnyunitsarrivingatjobsitethathavenotbeenadequa yprotectedwillberejectedbytheOwner'srepresentativeandshallbereturnedtothemanufactureratnoadditionalcosttotheOwner.Providethefollowingwithin2weeksofContractShopdrawingsindicatingfloorlayout,interruptionstogrid,special-sizedpanels,panelsrequiringdrillingorcutoutforservices,appurtenancesorinterruptions,edgedetails,elevationdifferences,stairs,rampsandregisters.Productdataforgridsystem,panels,andSamplesoffloorgridandpanelillustratingfinishesandManufacturer'sthatproductsmeetorexceedspecifieddesignstrengthandelectricalrequirements.Warranty:Priortostartingwork,submitasamplecopyofwarranty.UponcompletionandacceptanceoftheworkrequiredbythisSection,submitanexecutedcopyofthewarranty.EXTRAProvide20floorpanelsofeachtypeinstalled,packagedwithprotectivecoveringforstorageandidentifiedwithappropriaabels.Furnishextrastockfloorpanelscompletewithfloorcoveringfromsameproductionrunastheinstalledsystem.PART2--ACCEPTABLETateAccessFloors,BasisofDesign:Concore3000panel,60cmsize,supportedby50.8millimeter(2h)boltedstringersystemunderstructureandwithcornerlockedpanels.ShanghaiHuiliGroupChangzhouAccessFloorCo,ApprovedPedestals:Steelwithflatbottombasete,threadedsupportingrod,vibration-prooflocknuttopermit150mmadjustment,manufacturer'sstandardfinish.PedestaltoachievefinishedfloorelevationheightabovesubfloorasindicatedonFrameGridStringers:continuoustype,consistingofgalvanizedsteelchannelPANELFloorPanels:formedepoxypaintedsteel,filledwithcementitiouscorematerialandweldededges.FloorPanelSize:600by600FloorPanelFinish:manufacturer’sstandardepoxyRailings:seePanelLiftingDevices:Two,manufacturer'sstandardtype; mendedforpanelExposedMetalSurfaces:epoxypaintfinish;colorasselectedfrommanufacturer’sstandardrange.FABRICATIONFloorPanelFlatness:plusorminus0.5mminanyFloorPanelWidthorLengthfromSpecifiedSize:plusorminus0.5FloorPanelSquareness:plusorminus0.75mmdifferenc weenoppositediagonaldimensions.PART3--VerifythatsurfacesandopeningsarereadytoreceiveVerifyfieldmeasurementsareasshownonshopVerifythatrequiredsubfloorutilitiesareavailable,inproperlocation,andreadyforBeginningofinstallationmeansinstaller istingFIELDCleansubstrateProtecementssurroundingtheworkofthisSectionfromdamageorLayoutaccordingtoapprovedshopInstallcomponentsinaccordancewithmanufacturer'sCompletedfloorsystemshallberigid,ofvibrationandrockingpanels,andshallprovidesmoothanduniformfloorsurface.Overallfloorshallbelevelwithinplusorminus0.5mmin1m.SecurepedestalbasetetosubfloorwithmetalInstalladditionalpedestalswheregridpatternisinterruptedbyroomappurtenancesandatcutouts.InstallstringersandfloorpanelssolidlyonERECTIONumOut-of-LevelTolerance:0.5mminAdjustpedestalstoachieveasmooth,levelrigidfloorandtoensureadjacentfloorpanelsurfacesareflush,ofvibrationandrocking.Uponcompletionoftheinstallationofaccessflooring,vacuumcleantheentirefloorsystemandcoverwithcontinuoussheetsofreindpaperorstic.Receanyaccessfloorpanelsthatareclipped,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
- 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 【正版授權】 IEC TS 62453-43:2024 EN Field device tool (FDT) interface specification – Part 43: Object model integration profile – CLI and HTML
- 【正版授權】 IEC 62047-45:2025 EN Semiconductor devices - Micro-electromechanical devices - Part 45: Silicon based MEMS fabrication technology - Measurement method of impact resistance o
- 【正版授權】 IEC 60947-4-2:2020+AMD1:2024 CSV EN Low-voltage switchgear and controlgear - Part 4-2: Contactors and motor-starters - Semiconductor motor controllers,starters and soft-sta
- 【正版授權】 IEC 60601-1:1988/AMD1:1991 FR-D Amendment 1 - Medical electrical equipment - Part 1: General requirements for safety
- 小班水班本課程
- 醬料生產(chǎn)知識培訓課件
- 大數(shù)據(jù)在石油行業(yè)的應用
- 2025年幼兒園小班國慶節(jié)活動方案
- 2025年社區(qū)迎新春活動方案
- 上肢骨折護理診斷及措施
- 化學入門-給小學生講化學
- 綿竹事業(yè)單位招聘2022年考試《職業(yè)能力傾向測驗》真題及答案解析【完整word版】
- GB/T 9166-2009四柱液壓機精度
- GB/T 39711-2020海洋工程用硫鋁酸鹽水泥修補膠結(jié)料
- GB/T 34685-2017丙烯腈-丁二烯橡膠(NBR)評價方法
- GB/T 34120-2017電化學儲能系統(tǒng)儲能變流器技術規(guī)范
- GB/T 31216-2014全價寵物食品犬糧
- GB/T 17376-2008動植物油脂脂肪酸甲酯制備
- GB/T 14846-2008鋁及鋁合金擠壓型材尺寸偏差
- GB/T 11026.1-2016電氣絕緣材料耐熱性第1部分:老化程序和試驗結(jié)果的評定
- 院內(nèi)ACS救治流程圖
評論
0/150
提交評論