




下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、IV Construction Method, Technical Measurement of Road Works道路工程施工方法及技術(shù)措施1、Road Structure道路構(gòu)造:Heavy load road重型道路:Soil compacting150 mm thick 12% lime soil220mm thick fly-ash200mm thick C30 concrete素土壓實(shí)-150厚碎石基層。-300mm厚二灰結(jié)石-150mm厚C 20砼(內(nèi)配鋼筋 C15予制砼平石、側(cè)石安放-60mm厚粗粒式瀝青砼-30mm厚細(xì)粒式瀝青砼-Light load road輕型道路:So
2、il compacting200mm thick 12% lime soil220mm thick fly-ash200mm thick C30 concrete素土壓實(shí)-150厚碎基層。-50mm粗砂找平層-150mm厚C30砼面層。Pavement人行道:Soil compacting200mm thick fly-ash bedding30mm thicksandprecast cement tile C30素土壓實(shí),100厚碎石基層-50MM厚粗砂上鋪彩色予制人行道磚。2、Road working procedure道路施工流程2.1 Plain soil compacting-soi
3、l density teat-pipe embedding under the road-150*2mm thick 12% lime soil bedding-lime soil test-220mm thick fly-ash beddng-220mm thick C30 concrete finish-concrete curing-curbs paving 素土壓實(shí)-土密實(shí)度側(cè)試-路基下管線埋設(shè)-150*2厚12%石灰土基層。-灰土試驗(yàn)-220mm厚二灰結(jié)石-220mm厚C30砼面層。-砼養(yǎng)護(hù)-路沿石施工2.2、Main Construction Method主要施工方法施工放線:根據(jù)
4、平面坐標(biāo)控制點(diǎn)及設(shè)計(jì)施工圖,測(cè)放出道路中心線樁及邊線樁。管線標(biāo)志:在道路工程開工前,安排專人認(rèn)真復(fù)核地下管線和地下隱蔽設(shè)施的位置和標(biāo)高,對(duì)外露的各種井口設(shè)置標(biāo)志桿牌,以免埋沒或堵塞。路基壓實(shí)2.2.3.1、When compacting road base, to abide the rules as follows: first light second heavy, first table second vibrate, first slow second quick, first edge second center, first high second low. And compact
5、ion roller should exceed construction joints.路基碾壓時(shí),應(yīng)遵循先輕后重、先穩(wěn)后振、先慢后快、先邊后中、先高后低以及輪跡要重疊等原則,且碾壓輪應(yīng)超過分段施工的接縫。2.2.3.2、When compacting road, to first compact stably then 45 times of vibrating compaction last stably compact again.路基壓實(shí)時(shí)先穩(wěn)壓一遍,再振動(dòng)碾壓四五遍,最后再穩(wěn)壓一遍(碾壓遍數(shù)現(xiàn)場(chǎng)試驗(yàn)后再作調(diào)整。2.2.3.3、To compact longitudinally, a
6、nd first edge side them central part.碾壓順道路縱方向進(jìn)行,且先邊后中;輪跡重疊>30cm。2.2.3.4、After compaction, to test compaction coef., through frequency &quantity for quality control.碾壓速度均勻,輪跡重疊,壓路機(jī)碾壓不到的部位,應(yīng)采用小型機(jī)夯實(shí)或人力夯認(rèn)真夯實(shí),夯擊面在縱橫方向均應(yīng)相互重疊一半,防止漏夯。路基壓實(shí)后不得有松散、彈簧、翻漿及表面不平整現(xiàn)象,若下層未達(dá)到壓實(shí)度要求,不得鋪筑上層。2.2.3.5、Take the soil d
7、ensity test after compaction to judge the quality of the compacted soils.土路基碾壓后,按規(guī)定頻率,數(shù)量進(jìn)行土的密實(shí)度試驗(yàn),以判斷碾壓質(zhì)量。進(jìn)行環(huán)刀試驗(yàn)2.3Construction of fly-ash bedding二灰結(jié)石的施工:1、The fly-ash will be supplied by as the finished product and delivered on site for paving二灰結(jié)石的材料由供貨商成品生產(chǎn)后及時(shí)運(yùn)往工地,鋪設(shè)施工。2、The material mixing scale
8、is strictly comply with the national standard (JTJ034-2000, producing after approval by testing ,材料級(jí)配嚴(yán)格按照設(shè)計(jì)要求進(jìn)行配合比設(shè)計(jì),試驗(yàn)確定后生產(chǎn)執(zhí)行。配比為:熟石灰:粉煤灰:碎石=1:2:33、Lime: cinder: aggregate= 5:15:18三灰碎石混合料配比為:石灰;粉煤灰;集料=5:15:184、The fly-ash paving after road compaction, use machine for construction, leveling, compact
9、ing and sloping, we will strictly fulfill the regulation and code during construction.在道路基土壓實(shí),測(cè)試合格進(jìn)行二灰結(jié)石的施工,施工用機(jī)械化施工,鋪設(shè)平整(適當(dāng)放坡壓實(shí)密實(shí),嚴(yán)格按規(guī)范要求進(jìn)行。5、Must care for the curing after fly-ash paving, no vehicles pass through during curing period, set barricade for separation.施工完成后的二灰結(jié)石,必須確保養(yǎng)期,在保養(yǎng)期內(nèi)禁止車輛通行,采取道路隔離措施。6、The material inspection w
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 九年級(jí)物理下冊(cè) 11.4 核能教學(xué)設(shè)計(jì) (新版)教科版
- 二年級(jí)品德與生活上冊(cè) 變來變?nèi)サ乃虒W(xué)設(shè)計(jì)2 北師大版
- 專題三第2課《閱讀材料 3D打印技術(shù)的應(yīng)用與發(fā)展》教學(xué)設(shè)計(jì) 2023-2024學(xué)年青島版(2018)初中信息技術(shù)八年級(jí)上冊(cè)
- 2024四川大決策證券投資顧問有限公司招聘筆試參考題庫附帶答案詳解
- 復(fù)工消防安全培訓(xùn)
- 2024華山國(guó)際工程有限公司總部招聘6人筆試參考題庫附帶答案詳解
- 人教版四年級(jí)音樂上冊(cè)(五線譜)第5單元《唱歌 那達(dá)慕之歌》教學(xué)設(shè)計(jì)
- 對(duì)公客戶經(jīng)理綜合能力提升培訓(xùn)大綱
- 三年級(jí)下數(shù)學(xué)教案小數(shù)的認(rèn)識(shí)-人教版
- 鉑金珠寶知識(shí)培訓(xùn)
- 2024年土地流轉(zhuǎn)的合同模板
- 2024年第三屆浙江技能大賽(電工賽項(xiàng))理論考試題庫(含答案)
- 2024年度-工程造價(jià)培訓(xùn)課件全新
- 高標(biāo)準(zhǔn)農(nóng)田跟蹤審計(jì)、工程中間計(jì)量、變更價(jià)格調(diào)整及竣工結(jié)算審核項(xiàng)目投標(biāo)方案(技術(shù)方案)
- 行政事務(wù)試題庫及答案
- 教師備課教案模板
- 2023中央空調(diào)智能化控制技術(shù)規(guī)范
- 第八章+機(jī)械能守恒定律+單元教學(xué)設(shè)計(jì)及案例分析+課件-+物理人教版(2019)必修第二冊(cè)
- 7《中華民族一家親》第一課時(shí)《中華民族大家庭》(說課教學(xué)設(shè)計(jì))部編版道德與法治五年上冊(cè)
- 五年級(jí)科學(xué)實(shí)驗(yàn)?zāi)M訓(xùn)練(4)附有答案
- 施工企業(yè)生產(chǎn)安全事故應(yīng)急資源調(diào)查報(bào)告
評(píng)論
0/150
提交評(píng)論