文檔簡介
目錄
第一章編制說明及依據................................................................6
§1編制依據.........................................................................6
§2編制原則.........................................................................6
§3編制說明.........................................................................7
第二堂工??魂................................................................8
§1工程環境..........................................................................8
§1.1工程概述....................................................................8
§1.2周邊環境條件................................................................8
§1.3氣象條件....................................................................9
§2工程范圍.........................................................................9
§3工程設計概況.....................................................................9
§3.1基坑支護方案設計依據.........................................................9
§3.2基坑支護設計方案的選取.......................................................10
§3.3鉆(沖)孔樁...................................................................10
§3.4攪拌樁施工...................................................................11
§3.5錨索.........................................................................11
§3.6錨桿及噴層施工...............................................................12
§3.7超前微型樁施工...............................................................12
§4工程地質與水文地質..............................................................12
§4.1工程地質....................................................................12
§4.2水文地質....................................................................13
§5.1施工工程量大、工期緊,資源投入大.............................................14
§5.2基坑地質狀況復雜............................................................14
§5.3基坑攪拌樁止水為一重點.......................................................14
§5.4基坑變形監測為一重點。.......................................................14
§5.5基坑四周管網多,保護及遷移為一重點。.........................................14
第三聿BI,海體鬃劃...........................................................14
§1施工總體策劃目標................................................................14
§2施工總體安排....................................................................15
§2.1工程總體部署................................................................15
§2.1.1施工場地布置考慮...............................................................15
§2.1.2圍護結構施工分區考慮...........................................................16
§2.1.3機械設備選擇考慮...............................................................16
§2.1.5預應力錨索張拉時機考慮.........................................................16
§2.1.6施工臨時水電布置考慮...........................................................16
§2.2工程總體施工流程..........................................................17
§3施工準備及施工總平面布置........................................................18
§3.1施工準備..................................................................18
§3.2管線拆遷及保護............................................................19
§3.3施工總平面布置.............................................................19
§3.4交通疏解..................................................................21
§3.5施工總平面布置圖...........................................................21
§4現場管理與組織..................................................................21
§4.1現場項目法管理組織機構....................................................21
§4.2項目管理機構配置情況表.....................................................22
§4.3主要人員及部門管理職責劃分.................................................22
§4.4項目管理機構配備情況輔助說明資料............................................23
§5相關單位協調配合措施............................................................23
§5.1與各承包商之間的接口界面協調................................................23
§5.2與監理工程師的協調..........................................................24
§5.3與相鄰工程的協調............................................................24
§5.XX市政相關部門之間的協調.....................................................24
§5.5與當地政府及居民之間的協調..................................................24
第園量25
§1主要工程項目施工計劃進度指標.....................................................25
§2工程施工計劃橫道圖...............................................................25
§3主要工期目標....................................................................25
§3.1總工期......................................................................25
§3.2主要階段工期目標............................................................25
繁5章資講劃.................................................................26
§1機械設備的投入計劃..............................................................26
§1.1主要施工機械設備、主要施工機械進場計劃.....................................26
§1.2機械設備保證措施...........................................................27
§2勞動力的投入計劃及人員保證措施..................................................28
§2.1勞動力安排計劃..............................................................28
§2.2人員保證措施................................................................28
§3主要材料供應計劃及材料保證措施..................................................29
§3.1主要材料進場計劃表..........................................................29
§3.2材料保證措施................................................................29
§3工程項目資金計劃與合同用款估算計劃..............................................32
第六章美貌施工揍泰、工琶和解決為褰.................................................33
§1施工測量........................................................................33
§1.1原始數據驗算...............................................................33
§1.2平面控制布設...............................................................33
§1.3高程控制網布設.............................................................33
§1.4測量儀器配備...............................................................33
§2深層攪拌樁施工..................................................................34
§2.1概述........................................................................34
§2.2施工工藝流程................................................................34
§2.3施工方法及技術措施..........................................................35
§2.4施工質量控制...............................................................36
§2.5質量檢驗...................................................................37
§2.6施工中常見問題和處理.......................................................37
§3超前微型樁施工..................................................................38
§3.1概述.........................................................................38
§3.2施工工藝流程...............................................................38
§3.3施工方法及技術措施..........................................................39
§3.4工程質量保證措施............................................................42
§4鉆(沖)孔樁工程.................................................................43
§4.1概述.......................................................................43
§4.2施工工藝流程...............................................................43
§4.3施工方法及技術措施.........................................................44
§4.4常見問題處理方案...........................................................50
§4.4.1施工法中孔壁坍塌及對策...................................................50
§4.4.2縮頸.....................................................................51
§4.4.3卡鉆.....................................................................51
§4.4.4導管脫落.................................................................52
§4.4.5斜孔.....................................................................52
§4.4.6掉錘.....................................................................52
§4.4.7鋼筋籠上浮...............................................................52
§4.4.8樁底沉渣量過多...........................................................53
§4.4.9導管進水.................................................................53
§4.4.10斷樁....................................................................54
§5錨索施工工藝...................................................................54
§5.1概述........................................................................54
§5.2施工工藝流程...............................................................55
§5.3施工方法及技術措施.........................................................55
§5.4質量控制...................................................................58
§5.5施工中常遇問題及處理.......................................................58
§6錨桿及噴層施工................................................................59
§6.1概述........................................................................59
§6.2施工工藝流程...............................................................60
§6.3施工方法及技術措施.........................................................60
§6.4質量控制...................................................................62
§7基坑土石方挖運..................................................................64
§7.1施工部署....................................................................64
§7.1.1施工準備..................................................................64
§7.2土方開挖施工方法..........................................................66
§7.2367
§7.3基坑內降排水...............................................................68
§7.4垂直運輸工程...............................................................68
§7.4.1施工準備........................................................................68
§7.4.2垂直運輸安全管理措施............................................................68
§7.4.3技術安全規程....................................................................69
篥上章BI嬲閽asm測...........................................................71
§1施工監測目的及意義..............................................................71
§2監測人員架構....................................................................71
§3監測內容及技術措施..............................................................71
§3.1監測內容....................................................................71
§3.2監測技術措施................................................................72
第八章BIWWS...................................................................................................77
§1工期保證措施....................................................................77
§1.1工期保證總體措施...........................................................77
§1.2主要分部工程的工期保證措施.................................................78
§1.3確保關鍵工期的保證措施.....................................................78
§2技術保證措施....................................................................79
§2.1技術管理體系................................................................79
§2.2測量管理....................................................................79
§2.3試驗管理....................................................................80
§2.4施工管理....................................................................80
§3質量保證措施....................................................................80
§3.1工程質量的管理目標及保證體系...............................................81
§3.2工程質量目標的保證體系.....................................................86
§3.3施工質量流程控制...........................................................87
§4安全保證措施....................................................................92
§4.1安全目標....................................................................92
§4.2安全保證體系................................................................93
§4.3安全施工保證措施............................................................93
§4.4安全施工技術性措施..........................................................94
§4.5安全施工過程控制...........................................................101
§4.6安全應急流程控制...........................................................102
§4.7危險源辨識..................................................................105
§4.8管線保護...................................................................106
§5文明施工保證體系及措施..........................................................107
§5.1文明施工目標...............................................................107
§5.2施工現場文明管理...........................................................107
§5.2.1場容場貌管理....................................................................107
§5.2.2環境綠化管理....................................................................108
§5.2.3臨時道路管理....................................................................108
§5.2.4材料堆放管理....................................................................108
§5.2.5辦公生活區管理..................................................................109
§5.3環境保護措施...............................................................109
§5.3.1衛生管理措施....................................................................109
§5.3.2污染控制措施.............................................................109
§5.4突發事件處理方案...........................................................110
§5.4.1安全事故措施.............................................................110
§5.4.2治安管理措施.............................................................110
§5.4.3消防措施.................................................................111
§5.5周圍環境協調...............................................................113
§5.5.1防止擾民措施.............................................................113
§5.5.2糾紛應急措施.............................................................113
§5.6節假日施工的保障措施......................................................114
§6成品保護保證措施...............................................................115
§6.1主要管理措施.............................................................115
§6.2技術措施...................................................................115
戮0應急馥塞.............................................................116
§1應急救援組織...................................................................116
§2應急救援職責...................................................................116
§3安全應急流程...................................................................116
§4應急救援工作和報告程序.........................................................118
§5事故應急救援電話...............................................................118
§6事故應急救援材料物資...........................................................118
§7突發事故發生應急處理方法.......................................................119
§8急救技術及常備藥品.............................................................119
§8.1急救技術..................................................................119
§8.2常備藥品..................................................................120
§9基坑坍塌事故的應急措施.........................................................121
§10機械傷害事故的應急措施........................................................122
§11高處墜落事故的應急措施........................................................122
§12物體打擊事故的應急措施........................................................123
§13觸電事故的應急措施............................................................124
§14火災事故的應急措施............................................................125
§15附件...........................................................................126
§15.1附件一:施工總平面布置圖....................................................126
§15.2附件二:施工進度計劃橫道圖..................................................126
§15.3附件三:土方分層開挖示意圖..................................................126
§15.4附件四:坡道口收口示意圖....................................................126
第一章編制說明及依據
§1編制依據
I.《碧桂園XX市花園中地塊基坑支護工程》招標文件。
2.《碧桂園XX市花園中地塊基坑支護工程》招標設計圖。
3.碧桂園XX市花園中地塊基坑支護工程招標答疑紀要。
4.碧桂園XX市花園中地塊基坑支護工程現場調查資料。
5.國XXXX市現行有關法規、標準、技術規范、定額,以及特別是環境保護、水
土保持方面的政策和法規。
《混凝土結構設計規范》(GB50010-2002)
《建筑結構荷載規范》(GB50009-2001)
《巖土錨桿(索)技術規程》(CECS22:2005)
《地下工程防水技術規范》(GB50108-2001)
《建筑地基基礎設計規范》(GB50007-2002)
《建筑地基處理技術規范》(JCJ79-2002)
XX省《建筑地基基礎施工規范》(DBJ15)
《建筑基坑支護技術規程》(JGJ120-99)
《錨桿噴射混凝土支護技術規范》(GB50056-2001)
《鋼筋焊接及驗收規程》(JGJ18-2003)
6.我單位施工隊伍、技術裝備能力以及以往施工同類工程的實踐經驗。
§2編制原則
1.遵循招標文件條款,響應招標文件要求,確保實現業主要求的質量、工期、安
全、環境保護、文明施工和造價等各方面的工程目標。
2.指導思想是:施工方案可行、施工技術先進、施工組織科學、重信譽、守合同,
優質、安全、按期完成。
3.嚴格執行施工過程中涉及的相關規范、規程和技術標準。
4.貫徹執行國家和XX市有關方面的方針政策、遵守法律法規、尊重當地的民風
民俗。
5.重視生態環境,在施工期間及竣工后不發生水土流失,確保工程范圍外的原地
形、地貌不被破壞,道路恢復原狀。
6.重視工程范圍的工程地質、水文地質調查工作,建立以地質資料為先導、以量
測為依據的信息化施工管理體系。
7.施組編制做到施工總體部署和分項工程施工組織相結合、重點工程和一般工
程相結合、特殊技術和普通技術相結合,總體上使施組具有重點突出、內容全面、思
路清晰的特點。
8.充分發揮我單位專業優勢,做到依靠科技,精心組織,合理安排,突破難點。確
保優質、安全、快速建成碧桂園XX市花園中地塊基坑支護工程。
§3編制說明
本施工組織設計根據既有施工條件進行編制,主要說明如下:
1、必須保證業主按期提供場地。
2、施工場地布置及施工部署、具體施工工藝基本按投標施工組織設計考慮實施。
3、根據施工招標要求,本工程工期為75日歷天,施工組織計劃按此“關門工期”
考慮,對投標時的施組安排、進度指標作了適當調整。
4、根XX公司對本工程施工的項目組建的實際到位人員,調整現場管理組織機構
及有關責任人,并根XX公司在進一步研究后優化施組進行機械設備配備。
第二》工棚K況
§1工程環境
§1.1工程概述
工程名稱:碧桂園XX市花園中地塊基坑支護工程
建設地點:XX市禪城區嶺南大道東側
建設單位:XX市禪城區碧桂園房地產開發XX公司
設計單位:XX市泰基工程技術XX公司
擬建場地位于XX市禪城區嶺南大道東側,交通便利。場地較大,基坑總體呈長方
型,長邊長約154.2m,短邊長約130m,周長約542.8m;現場地較平坦,經現場實測,坑
頂絕對標高為3.40m,相對標高約為-L30m),基坑挖深考慮到底板墊層底(底板面相
對標高為-9.30m,底板600厚、墊層100厚),基坑底相對標高為TO.00m,基坑開挖深
約8.70mo
本基坑設計側壁安全等級:西側靠近嶺南大道的基坑安全等級為一級,其它區段
為二級,基坑支護結構使用年限自支護結構完工之日起計為1年;±0.00相當于絕對
標高4.700mo
§1.2周邊環境條件
基坑北側:該側地下室邊線距地塊用地紅線為6.距北地塊地下室邊線約
56m,紅線外為規劃瀾石二路;
基坑東側:該側地下室邊線距地塊用地紅線為6.6m,距圍墻約9.4m,紅線外為規
劃路;
基坑南側:該側地下室邊線距地塊用地紅線為5.3m,距南地塊地下室邊線約
32.8m,紅線外為規劃新民一路。該側空地擬作鋼筋堆場使用(要求距基坑邊不小于2m,
堆載小于50kPa)o
基坑西側:該側地下室邊線距地塊用地紅線為6.3~9.3m,距圍墻約4.4m,圍墻外
為嶺南大道人行道。
基坑周邊管線分布詳見《周邊地下管網圖》。
§1.3氣象條件
根據我司查詢xx市相關氣象資料顯示,本區位于南亞熱帶季風氣候區,春秋風和
日麗,夏炎冬暖,降水豐沛,日照充足,在季風環流控制下,4?8月,受海洋氣流影響,
氣候炎熱,降水量大,多偏南風;每年9月至翌年3月,受大陸冷高壓影響,氣候干燥,
降水較少,多偏北風。每年5?10月,多熱帶氣旋,中心最大風力處達12級,甚至以上。
據XX市歷年統計資料,年平均氣溫21.9℃極端最高氣溫38.7℃,最低氣溫0.0℃;年
平均降水量1696.5mm,最大降水量2864.7mm,最小降水量1113.2mm,日最大降水量
284.9mm;年平均風速1.9m/s,極大風速35.4m/s;年平均影響佛山的熱帶氣旋3.2
個;年平均相對濕度77%。
§2工程范圍
本項目為碧桂園XX市花園中地塊基坑支護工程,基坑周長約542.8m,深度約
8.70m的基坑支護工程;
包括基坑支護(鉆(沖)孔樁、水泥攪拌樁、錨索、錨桿、腰梁、腰梁、壓頂梁、
噴錨網等)和土方開挖等;
施工場地布置。包括發包人提供的施工平面圖紙指定的施工臨設場地地面硬化、
臨時施工道路、施工場地排水、施工用水、施工用電;本工程所需的臨時設施搭設、
施工道路及臨時用水用電、施工排水、安全文明施工措施等;
后續施工單位進行的施工場地及工程竣工資料交接和配合。
§3工程設計概況
§3.1基坑支護方案設計依據
1、《建筑基坑支護技術規范》(JGJ120-99);
2、《XX省建筑基坑支護工程技術規范》(DBJ/T15-20-97);
3、《混凝土結構設計規范》(GB50010-2002);
4、《巖土錨桿〈索〉技術規程》(CECS22:2005);
5、《建筑樁基技術規范》(JGJ94-2008);
6、《建筑基坑工程監測技術規范》(GB50497-2009);
7、《XX市禪城區東平大橋北側項目中地塊地下室巖土工程勘察報告》;
8、業主提供的相關建筑結構圖紙以及周邊環境平面圖。
§3.2基坑支護設計方案的選取
1、基坑挖深8.70m,且基坑西側緊臨已有嶺南大道,南側現為南地塊施工場地,北
側為施工用地,東側地下室邊線距工地圍墻約9.4m,距紅線6.6m。
2、場地較大,地質條件起伏較大,部分區域含較厚的淤泥質土及砂層,部分巖層埋
深較淺。基坑底大部分落于強風化巖層。
根據上述場地周邊環境及地質狀況特點,將本基坑安全等級西側靠近嶺南大道一
側定為一級,其它段定為二級。基坑支護根據各區段周邊環境、地質條件不同及施工
工期等要求分別采用〃灌注樁+攪拌樁+一道(兩道)預應力錨索”和〃攪拌樁+噴錨網〃的
支護方案。
§3.3鉆(沖)孔樁
支護樁施工說明:具體采用鉆孔、沖孔或旋挖成孔最終由甲方具體確定。
(一)、灌注樁成孔
1、灌注樁的機具選擇、護筒埋設、泥漿護壁、施工要領及清孔等要求應按現行
規范和規程處理;
2、樁成型后必須清除孔底沉渣,清孔后沉渣厚度不得大于300,并應立即灌注水
下碎。
(二)、灌注樁鋼筋籠制作及安裝
1、縱向受力鋼筋采用HRB400鋼筋,配筋按均勻配筋設計,配筋詳見大樣圖。保
護層厚50mm;
2、螺旋箍筋采用HPB235鋼筋,橫向加勁筋采用HRB335,縱橫鋼筋交接處焊接牢
固;
3、鋼筋籠外側需設混凝土墊塊或采用其他有效措施,以保障鋼筋保護層厚度的
準確性。
(三)、灌注樁水下混凝土澆灌
1、本工程的擋土樁混凝土強度等級C25o水下砂的用料及配合比按現行規范和
規程處理;
2、本工程采用導管灌注水下混凝土,導管的構造和使用以及灌注水下碎的施工
要領按現行規范和規程處理;
3、為確保水下混凝土的質量,向導管灌注水下彼時建議采用碎輸送泵或采用其
它有效措施;
4、施工時應按樁頂的設計標高掌握好混凝土的灌注量。建議灌注於完成面之標
高比樁頂的設計標高高出0.8米;
5、灌注樁強度達到設計強度的70%(7天)后,方可進行土方開挖。
§3.4攪拌樁施工
1、攪拌樁直徑為500,間距見大樣圖,樁的垂直偏差不得超過1%,樁位偏差不得
大于50mm;
2、攪拌樁施工中采用四噴四攪的施工方法,施工中參數如下:樁身強度2
1.OMPa;采用P.C.32.5R復合硅酸鹽水泥,每米水泥用量不少于50kg;水灰比0.45~
0.55;攪拌提升速度W0.5~0.8m/min。必須保證攪拌樁的搭接質量,搭接時間不大于
24小時,如間歇時間過長,應采用局部補樁或注漿措施;
3、基坑開挖時攪拌樁的齡期不少于15天。
§3.5錨索
1、錨索施工按《巖土錨桿(索)技術規范CECS22:2005》進行;
2、成孔采用泥漿護壁成孔,若淤泥質砂層較厚,泥漿護壁成孔困難時,須加套管
跟進;
3、錨索采用3~5x765鋼絞線,鋼絞線強度標準值為1860MPa。成孔直徑為150mm;
4、錨索長度需以入巖控制,采用一次注漿,注漿材料選用水灰比為0.5~0.55的
純水泥漿,并加入適量的早強劑、及膨脹劑,水泥標號為P.C.32.5R復合硅酸鹽水泥,
注漿壓力為0.5^1.OMPa;
5、鋼絞線錨固段架線環與緊箍環每隔1m間隔設置,緊箍環系16號鐵絲繞制,不
少于兩圈,自由段每隔2m設置一道架線環,以保證鋼絞線順直;
6、待砂漿注漿體、壓頂梁或腰梁達到設計強度的70%后(齡期約5天)方可進行
錨索張拉;
7、錨索鎖定前先張拉至設計抗拔力的1.1倍,保持15min,然后卸荷至零,再重新
張拉至鎖定荷載預應力進行鎖定作業。錨索張拉荷載分級及觀測時間應遵守規范進
行。
8、錨索施工過程中為盡可能減少成孔對地層產生的影響,應進行跳打。
§3.6錨桿及噴層施工
1、錨桿施工按《巖土錨桿〈索〉技術規程CECS22:2005》進行;
2、錨桿采用HRB400鋼筋,錨桿采用鉆機成孔,成孔直徑為*130mm;
3、錨桿注漿采用M20水泥砂漿,注漿壓力為0.5~1.OMPa,水泥標號為P.C.32.5R
復合硅酸鹽水泥;
4、掛網噴射碎:鋼筋網采用66@200X200,加強筋采用]16,鋼筋網[6鋼筋采用綁
扎連接,加強筋及加強筋與土釘的連接采用焊接。噴射砂強度等級為C20,噴層厚度為
100mm,分兩次噴射。碎面層向上翻過基坑頂1.0m,以形成護坡,大樣圖見設計圖所示。
5、若錨桿全在雜填土或砂層中,可采用嬲C48的鋼花管代替,壁厚3.5mm。鋼花
管采用打入式,要求壓力灌注純水泥漿,水灰比為0.5飛.55,水泥標號為P.C.32.5R復
合硅酸鹽水泥,注漿壓力為0.5~1.OMPa,注漿體強度為15MPa,要求每m水泥摻入量不
少于40kg。
§3.7超前微型樁施工
1、超前微型樁用鉆機成6150的孔,成孔間距如圖,成孔垂直偏差不大于現,用
清水清孔,直到孔口返出清水后灌注純水泥漿,水灰比為0.5~0.55o
2、灌漿后在孔內置入鋼管,然后進行二次補漿,將水泥漿收縮部分填滿。
3、鋼管采用6114X3的焊管。
§4工程地質與水文地質
§4.1工程地質
場地位于珠江三角洲地區,屬沖積平原地貌,場地地勢較為平整,場地內未發現
有影響場區穩定性的構造形跡等不良地質作用,場地的區域穩定性較好。
場地鉆孔揭露深度范圍內第四系土層為填土、沖積土,基巖為第三系地層,巖性
為泥質粉砂巖,自上而下敘述如下:
1、第四系人工填土層:
素填土<1〉:灰黃色,松散,主要由粘性土組成,局部夾碎磚、石塊或中細砂,欠壓
實,為新近堆填,局部孔段頂部為碎地面,局部孔段為雜填土。
2、第四系沖積層:
a.粉砂灰色,飽和,松散,分選性較好,成分以石英砂為主,含少量淤泥質
±o平均標貫7擊。
b.淤泥<2-2〉:深灰色,飽和,流塑,有腐殖臭味,含腐殖質,夾薄層粉細砂,局部孔
段夾腐木。平均標貫1.3擊。
c.粉質粘土<2-3>:灰色,灰黃色,棕紅色,可塑,局部軟塑,以粉、粘粒組成為主,
含少量砂,粘性較好,稍有光澤,韌性中等,強度中等,局部孔段含砂。平均標貫7.8擊。
d.細砂<2-4>:灰黃色,飽和,稍密~中密,分選性較差,成分以石英砂為主,呈次棱
角狀,局部孔段含粘性土。平均標貫12擊。
3、第四系殘積層:本場區缺失。
4、第三系地層,巖性為泥質粉砂巖。
a.全風化泥質粉砂巖本場區缺失。
b.強風化泥質粉砂巖<4-2>:棕紅色,局部灰黃色,具原巖結構,成份、強度已顯著
改變,巖芯呈硬土狀、半巖半土狀、巖狀,局部孔段為強風化砂巖。其巖石堅硬程度為
極軟巖,巖體完整程度為極破碎。
c.中風化泥質粉砂巖<4-3>:棕紅色,砂質結構,層狀構造,裂隙稍發育,礦物成份
以石英為主,粘土礦物次之,巖芯呈塊狀、短柱狀、局部長柱狀,敲擊聲脆。其巖石堅
硬程度為軟巖,巖體完整程度為較破碎。
d.微風化泥質粉砂巖<4-4〉:棕紅色,砂質結構,層狀構造,礦物成份以石英為主,
粘土礦物次之,巖芯呈長柱狀,局部短柱狀,敲擊聲脆。其巖石堅硬程度為較軟巖,巖體
完整程度為較破碎。
§4.2水文地質
擬建場地地下水類型主要為孔隙水,賦存于沖積層中的潛水,其富水性和透水性
較好,受大氣降水入滲或側向補給,以蒸發或滲流方式進行排泄;另一類為裂隙水,主
要賦存于風化巖的裂隙中。地下水對碎具微腐蝕性,對鋼筋混凝土結構中的鋼筋具微
腐蝕性,對鋼結構有弱腐蝕性。
§5工程重點和難點分析
§5.1施工工程量大、工期緊,資源投入大
本工程基坑開挖深度達8.70m,攪拌樁15051m,鉆(沖)孔樁共290根,預應力錨索施
工長度約10295m,錨桿施工長度4424m,具有施工深度大,資源投入多的特點,工程施工
過程中,制約因素相當多,如施工工序間的約束、資源的組織調配、施工隊伍的協調等,
對總工期有相當大的影響等,都可能制約施工進度,而工程總工期要求為135天,施工工
期非常緊。
§5.2基坑地質狀況復雜
整個場地工程地質情況比較復雜,對土方開挖、鉆(沖)孔樁及錨索施工均帶來不
利影響。
§5.3基坑攪拌樁止水為一重點
基坑地下水位高,為保證止水效果,攪拌樁施工質量是關鍵,在攪拌樁施工過程
中安排施工經驗豐富的施工人員進行全程跟蹤管理,對攪拌樁垂直度、水泥用量、搭
接質量進行嚴格控制。
§5.4基坑變形監測為一重點。
本基坑開挖較深加之基坑四周環境比較復雜,為控制基坑位移,加強適時監測并
將監測數據及時反饋給監理及設計。
§5.5基坑四周管網多,保護及遷移為一重點。
根據設計文件可知,基坑四周管網很多,尤其是基坑西側及東側,部分管線及配電
房在開工前要完成遷移工作,本基坑開挖前將協調xx市政部門摸清管網的具體走及
埋深,對受開挖移影響的管網進行遷移或做好保護措施,在管網位置處設置明顯的標
/士匕、O
第三章虹總體策劃
§1施工總體策劃目標
1、總工期與關鍵工期:嚴格按項目法進行工程管理,抓住關鍵工期合理組織施工。
在合同工期內完成工程的施工、驗收并清理退場完畢。
2、工程質量:建立“TQC”全面質量管理小組XX公司將嚴格按照國家頒發的建
筑工程各專業施工質量驗收規范和《建筑工程施工質量驗收統一標準》(GB50300-2001)
和GB/T19001-IS09001:2008質量管理體系建立完整的工程質量保證體系,以先進的工
法、工藝和嚴格的管理確保工程質量。并做到:工程質量合格率100%。
3、安全生產:嚴格按XX省和XX市及我集團的有關法規、規定進行安全生產管
理。杜絕重大安全事故,年輕傷率控制在1在以下。
4、文明施工:嚴格按《XX市建設工程文明施工標準》的規定執行實施。確保文
明施工達到XX省雙優工地標準。
§2施工總體安排
§2.1工程總體部署
針對本工程項目施工特點及重難點,我部擬從以下方面進行控制。以保證高效、
保質、保量、按期完成施工任務。
§2.1.1施工場地布置考慮
基坑北側:該側地下室邊線距地塊用地紅線為6.
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 2024年農藝師考試的知識應用試題及答案
- 城鄉農業聯動的試題及答案
- 2025年玻璃鏡片合作協議書
- 突破統計學重要考點的難度分析試題及答案
- 考前心理調適福建事業單位考試試題及答案
- 結構師面試題目及答案
- 2025年轉基因耐貯藏番茄項目合作計劃書
- 福建事業單位考試風險評估試題及答案
- 福建事業單位考試工作效率提升方法試題及答案
- 競爭意識在農業職業經理人考試中的體現試題及答案
- GB/T 20424-2025重有色金屬精礦產品中有害元素的限量規范
- 輸油管道安全培訓
- 2025年海南重點項目-300萬只蛋雞全產業鏈項目可行性研究報告
- 小說環境描寫的深度剖析:解鎖文學世界的另一把鑰匙(高中教材全冊)
- 2025年河南省高校畢業生“三支一扶”招募1100人高頻重點模擬試卷提升(共500題附帶答案詳解)
- 關于“地舒單抗”治療骨質疏松的認識
- 2025年國家林業局西北林業調查規劃設計院招聘4人歷年高頻重點模擬試卷提升(共500題附帶答案詳解)
- 現代護理管理新理念
- 新生兒高膽紅素血癥診斷和治療專家共識
- 使用錯誤評估報告(可用性工程)模版
- TSG 23-2021 氣瓶安全技術規程 含2024年第1號修改單
評論
0/150
提交評論