CQI-23Molding Process Assessment 模塑系統(tǒng)評估審核表-中英文(空)_第1頁
CQI-23Molding Process Assessment 模塑系統(tǒng)評估審核表-中英文(空)_第2頁
CQI-23Molding Process Assessment 模塑系統(tǒng)評估審核表-中英文(空)_第3頁
CQI-23Molding Process Assessment 模塑系統(tǒng)評估審核表-中英文(空)_第4頁
CQI-23Molding Process Assessment 模塑系統(tǒng)評估審核表-中英文(空)_第5頁
已閱讀5頁,還剩60頁未讀 繼續(xù)免費閱讀

下載本文檔

版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報或認(rèn)領(lǐng)

文檔簡介

PROCESSTABLEA-InjectionMolding制程表A-注射成型,,,,,,,

"Allrequirementsgivenbelowaresubordinatetocustomerspecificrequirements.

表中給出的所有要求都要服從于顧客特殊要求。

Thecustomermayhaveadditionalrequirements,e.g.,inspectiontesting,greaterfrequencies,etc.Whenperformingthejobaudit,theauditorshallverifymolderisconformingtocustomerrequirements.

顧客可以增加其它要求,如檢查試驗,增加檢測頻率,評審時審核員應(yīng)確認(rèn)注塑企業(yè)是否滿足了顧客的要求。

Ifminimumrequirementsarenotmet,providesupportingrecordstojustifyactualconditions.

*如果不能滿足最低要求,應(yīng)提供支持記錄以證明實際情況。",,,,,,,

,,,,,,,,

"Item#

序號","Related

MoldingSystemAssessmentQuestion#

相關(guān)的成型系統(tǒng)評估問題序號","Category/ProcessSteps

類別/制程步驟","TypeofControl

控制類型",,"MonitoringFrequency

監(jiān)控頻率",,"Observation/Comments

觀察/評論"

,,,"MinimumRequirement

最低要求","ActualCondition

實際情況",MinimumRequirement最低要求,ActualCondition實際情況,"(Pass/Fail/N/A)

(通過/未通過/不適用)"

1.0,,ReceivingInspection進(jìn)料檢驗,,,,,

A1.1,"1.4

2.1

2.13","Incomingmaterialassessmentprocedure,coveringonsitetestingoracceptanceofsuppliertesting,withcriteria(i.e.,meltflow,specificgravity).

進(jìn)料評審程序,包括現(xiàn)場測試或接受供應(yīng)商的測試,并附帶評估標(biāo)準(zhǔn)(即:熔融指數(shù),比重)",Manual手動,,"Onceperlot

每批一次",,

A1.2,"1.4

2.1

2.13","Incomingcomponentsassessmentprocedure,coveringonsitetestingoracceptanceofsuppliertesting,withcriteria(ifapplicable).

進(jìn)料組件評估程序,包括現(xiàn)場測試和接受供應(yīng)商測試,并附帶評估標(biāo)準(zhǔn)(如適用)",Manual手動,,"Onceperlot

每批一次",,

2.0,,Storage&Handling(IfApplicable)存儲和處理(如適用),,,,,

A2.1,"1.4

2.3

2.11

2.12","StockrotationsysteminplaceforFirstin/Firstout(FIFO)andshelf-life

有庫存周轉(zhuǎn)系統(tǒng)以實現(xiàn)先進(jìn)先出(FIFO)和保質(zhì)期控制要求",Automatic/Manual自動/手動,,"FIFO-perLot按批次

Shelflife-pullforuse

貨架使用壽命—拉動使用",,

A2.2,"1.4

2.11

2.12","Environmenttemperaturecontrolled

環(huán)境溫度控制",Automatic自動,,"Continuousmonitoringbycontrollerormanualverificationdaily

每日由控制器持續(xù)監(jiān)控或人工驗證",,

A2.3,"1.4

1.6

2.7

2.11

2.12","Handlingofpartialcontainerstoensurenocontamination(closedcontainer,cleanenvironment)

周轉(zhuǎn)物料容器時確保不受污染(密閉容器,清潔環(huán)境)",Automatic/Manual自動/手動,,"Continuous

持續(xù)",,

A2.4,"1.4

1.6

2.7

2.11

2.12","Partialcontainerquantity

周轉(zhuǎn)物料容器盛裝數(shù)量",Automatic/Manual自動/手動,,"PerContainer

每容器",,

3.0,,MaterialDrying材料干燥,,,,,

A3.1,"1.4

2.11

2.12","Dryertemperatureperresinmanufacturerguidelines(permaterial)

按樹脂制造商的烘干機(jī)溫度指南(每個材料)",Automatic自動,,"Continuousmonitoringbycontroller

控制器連續(xù)監(jiān)控",,

A3.2,"1.4

2.11

2.12","Dryertimeperresinmanufacturerguidelines(permaterial)

按樹脂制造商的烘干機(jī)時間指南(每個材料)",Manual手動,,"PerResinManufacturerGuidelines

按樹脂制造商指南",,

A3.3,"1.4

2.11

2.12","Dryingequipment(dryerdedicatedorcleanprocedureinplace)

干燥設(shè)備(專用烘干機(jī)或清潔程序到位)",Manual手動,,"Materialchange

材料更換",,

A3.4,"1.4

2.11

2.12","Dewpoint

露點",Automatic自動,,"Continuousmonitoringbycontroller

控制器連續(xù)監(jiān)控",,

A3.5,"1.4

2.11

2.12","Moistureanalysis,ifapplicable,perResinManufacturerGuidelines

濕度分析,如果適用,根據(jù)樹脂制造商指南",Manual手動,,Atstart-upandoncepershift*開始時和每班一次*,,

4.0,,Recycle(regrind)Material(IfApplicable)回收(粉碎)原料(如適用),,,,,

A4.1,"1.4

1.11

2.11

2.13","Recycleratio(perprint,inspectionstandardormanufacturerguidelines).Verifiedbyfeedpressure,weightorvolume

回收比率(按圖紙、檢驗標(biāo)準(zhǔn)或制造商指南)。由進(jìn)料壓力、重量或體積驗證",Automatic自動,,"Onceevery8hoursandateverypartchangeover

每8小時一次,換產(chǎn)品生產(chǎn)",,

A4.2,"1.4

1.11

2.11

2.12","Dedicatedregrindequipmentorcleaningprocedureinplace

專用回收料設(shè)備或清潔程序到位",Manual手動,,"Materialchange

原材料改變",,

A4.3,"1.4

1.11

2.11

2.12","Finesmanagement(de-dusting)

料末管理(除塵)",Automatic/Manual自動/手動,,"Materialchange

原材料改變",,

A4.4,"1.4

1.11

2.11

2.12","MoveregrindtoIMM(contamination)

回收料田間至注塑機(jī)(預(yù)防污染)",Automatic/Manual自動/手動,,"Start-upandcontinuous

啟動時和持續(xù)過程中",,

5.0,,ColorManagement顏色管理,,,,,

A5.1,"1.4

2.11

2.12","Pigmentblending-percentloading,ifapplicable

著色劑混合-添加百分比(如適用)",Automatic/Manual自動/手動,,"Start-upandcontinuous

啟動時和持續(xù)過程中",,

A5.2,"1.4

2.11

2.12","Colorchangeprocedure

顏色切換程序",Manual手動,,"Continuous

持續(xù)",,

6.0,,MoldingProcess成型過程,,,,,

A6.1,"1.4

1.15

2.11

2.12","Thereshallbeastandardizedstartupprocedure/checklistthatdefinesthingstodoatstart-up

應(yīng)有一個標(biāo)準(zhǔn)化的開機(jī)程序/查檢表,以明確開機(jī)時要做的工作",Manual手動,,"Start-upandrestartafterlongdowntimeevent

啟動或因故長時間停機(jī)后重啟",,

A6.2,"1.4

1.15

2.11

2.12","Productionplan(machine,mold,materials,partstyle)

生產(chǎn)計劃表(機(jī)臺,模具,材料,零件類型)",Manual手動,,"Start-upandrestartafterlongdowntimeevent

啟動或因故長時間停機(jī)后重啟",,

A6.3,"1.4

1.15

2.11

2.12","Startupcheck(verifyprocesssettingsagainstsetupsheet)

開機(jī)檢查(根據(jù)設(shè)置表驗證制程設(shè)置(如成型參數(shù)表))",Manual手動,,"Atstart-up,andafterlongdowntimeevent

在啟動或因故長時間停機(jī)",,

A6.4,"1.4

1.15

2.11

2.12","Startupcheck-SecondaryEquipment(De-gate,assemblyequipment,welders,etc.)

開機(jī)檢查-輔助設(shè)備(澆口切除設(shè)備,裝配設(shè)備,焊接機(jī))",Manual手動,,"Atstart-up,andafterlongdowntimeevent

在啟動或因故長時間停機(jī)",,

A6.5,"1.4

1.15

2.11

2.12","Moldsurfacetemperature

模具表面溫度",Automatic/Manual自動/手動,,"Atstart-up,andafterlongdowntimeevent

在啟動或因故長時間停機(jī)",,

A6.6,"1.4

1.15

2.11

2.12","Plastication-Temperature(barrel,nozzle,hotmanifoldifapplicable),screwRPM,andbackpressure

塑化—溫度(如適用例如:料筒,噴嘴,熱流道(如果適用),螺桿轉(zhuǎn)速,背壓",Automatic自動,,"Continuous

持續(xù)",,

A6.7,"1.4

1.15

2.11

2.12","Plastication-Melttemperature

塑化-熔化溫度",N/A不適用,,"Start-up

啟動時",,

A6.8,"1.4

1.15

2.11

2.12","Plastication-Screwrecoverytime

塑化-螺桿恢復(fù)時間",N/A不適用,,"Continuous

持續(xù)",,

A6.9,"1.4

1.15

2.11

2.12","Fill-Screwvelocityorvelocityprofile

填充-螺桿速度或速度曲線",Automatic自動,,"Continuous

持續(xù)",,

A6.10,"1.4

1.15

2.11

2.12","Fill-Filltimeandpeakpressure

填充-充填時間和峰值壓力",N/A不適用,,"Continuous

持續(xù)",,

A6.11,"1.4

1.15

2.11

2.12","Hold-Holdpressureandholdtime

保壓-保壓壓力和保壓時間",Automatic自動,,"Continuous

持續(xù)",,

A6.12,"1.4

1.15

2.11

2.12","Hold-Cushion

保壓-緩沖",N/A不適用,,"Continuous

持續(xù)",,

A6.13,"1.4

1.15

2.11

2.12","Hold-Cavitypressure(ifapplicable)

保壓-型腔壓力(如適用)",N/A不適用,,"Continuous

持續(xù)",,

A6.14,"1.4

1.15

2.11

2.12","TemperatureControlCooling-Coolantinlettemperatureandcoolingtime

溫度控制冷卻-冷卻劑入口溫度和冷卻時間",Automatic自動,,"Continuous

持續(xù)",,

A6.15,"1.4

1.15

2.11

2.12","Partweight(ifapplicable)

零件重量(如適用)",Manual手動,,"Onceevery8hours

每8小時一次",,

A6.16,"1.4

1.15

2.11

2.12","Firstpieceapproval

首件批準(zhǔn)",Manual手動,,"Start-up,andrestartafterdowntimeevent

啟動或因故長時間停機(jī)后重啟",,

A6.17,"1.4

1.15

2.11

2.12","Materialpurge/evacuationofbarrel-includedinunplannedanddowntimeprocedures

清膠/排出料桶-包括計劃外和停機(jī)程序",Manual手動,,"Endofrunorlongdowntime

運行結(jié)束或長時間停機(jī)",,

A6.18,"1.4

1.15

2.11

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論