




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、中華人民共和國海事局2009年第5期海船船員適任統考試題(總第48期)科目:輪機英語 試卷代號:805適用對象:無限近洋航區3000kw及以上船舶二/三管輪(本試卷卷面總分100分,及格分為70分,考試時間100分鐘)答題說明:請選擇一個最合適的答案,并將該答案按答題卡要求。在其相應位置上用2B鉛筆涂黑。第1題至88題,每題1分,第89題至96題,每題分。一、單項選擇題1. Diesel engines classified as reciprocating internal combustion engines because they_A. use energy from fuel bur
2、ned outside their cylindersB. burn fuel in a combustion chamber that moves back and forthC. burn fuel in a chamber where its energy moves a piston up and downD. a continuous combustion process to impart rotary motion to the pistons2. The abbreviation “MIP” stands for _A. middle indication pressure B
3、. mean indicated pressure C. mean indicated pitch D. middle indicated power3. The term used to express the ignition quality of a particular fuel is _ A. cetane number B. octane number C. ignition index number D. volatility point4. The period when both inlet valves and exhaust valves are open is refe
4、rred to as_ A. valve loop B. valve uniflow C. valve overlap D. valve grinding5. Which of the following statements represents the function of the compression rings installed at the top of a diesel engine piston? A. Control the amount of lube oil burned in the combustion chamber B. Transmit heat from
5、the piston to the cylinder liner C. Prevent damage to ring groove inserts by action as a heat dam. D. Dissipate combustion chamber gas pressure by channeling it through the ring gap.6. The gas loads on the engine structure are constrained by means of hydraulically preloaded_ Which connect the bed pl
6、ate, frame sections and cylinder jackets into a single unit.A. connecting rods B. mean bearing C. column D. the rods7. _of different thickness are inserted between the shells to enable adjustment of the bearing clearness.A. Screws B. Films C. Dises D. Shims8. Compared to four-stroke/cycle engines, t
7、wo-stroke/cycle diesel engines have the disadvantages of _A. less even torque B. higher cylinder head temperaturesC. fewer power stroke per revolution D. greater weight/size requirements9. During the fuel imection period, fuel pressure must exceed cylinder gas pressure to _A. ensure penetration and
8、distribution of the fuel in the combustion chamberB. ensure the needle valve is flushed clean during each injectionC. prevent combustion gas blowback into the open needle valveD. prevent reflected pressure waves when the needle valve closes10. The upper piston rings in large, slow-speed, two-stroke
9、cycle diesel engines are most effectively lubricated by oil _ A. fed from mechanical lubricators B. thrown off from the main bearings C. supplied form wick fed drip lubricators D. flow from a centrifugal banjo oiler11. In a diesel engine closed freshwater cooling system, the amount of coolant flowin
10、g through the heat exchange is controlled by the _A. section pressure regulator B. thermostatic bypass valveC. sea water temperature D. water level in the expansion tank12. The purpose of an after-cooler is to _ A. reduce the turbocharger operation temperature B. increase the pressure of the inlet a
11、ir C. increase the density of the inlet air D. reduce the blower operation temperature13. Compressed air is supplied by air compressors to _ A. the air receivers B. the starting valves C. the cylinder covers D. the distributors14. _supplies pilot air to control the cylinder air start valves. A. An a
12、ir receivers B. An indicator cock C. An air distributor D. A safety valve15. Thermocouple pyrometers are used on large, main propulsion diesel engines to indicate the temperature of the _ A. cooling water leaving each cylinder B. fuel oil entering the injector C. exhaust gases at various locations D
13、. lube oil at the bearing suppliers16. After starting a diesel engine, which of the listed operating conditions should be checked first? A. Air box pressureB. Lube oil pressureC. Exhaust temperatures D. Raw water pressure17. A device which functions to bring a diesel engine to a full stop to protect
14、 it from damage is known as a/an _ A. torque limiter B. over-speed trip C. over-speed governor D. load limit governor18. Air cocks, usually positioned at the _in a circulating systems, is used to get rid of the air in the system. A. bending joint B. expansion tank C. weld D. the highest point19. Som
15、e medium and high-speed diesel engines require reduction gear units to provide a useful propeller speed. In most reduction gears, the bull gear_ A. must churn the oil in the sump B. is connected to the propeller shaft C. is driven at the highest RPM D. compensates for alignment variations between th
16、e engine and pinion gear20. Which of the following statements concerning fire-tube boilers is correct? A. combustion gases flow through the tubes B. flames impinge on the tubes C. combustion occurs in the tubes D. water flows through the tubes21. A bypass line provided around a waste heat auxiliary
17、boiler in a diesel engine exhaust system, may be used to avoid boiler_ A. corrosion at low engine loads B. erosion at high engine loads C. overload at high engine loads D. scaling at all exhaust temperature22. The amount of chlonde content in the water of an auxiliary boiler can be reduced by _ A. a
18、dding hydrazine B. blowing down the boiler C. adding phenolphthalein D. adding a sulfite chloride scavenger23. Failure of the burner flame in an automatic auxiliary boiler would probably be a result of _ A. water in the fuel oil B. broken high tension leads C. incorrect electrode setting D. full fue
19、l pressure at the nozzle24. Boiler water hardness is increased by _ A. zero alkalimty to the water B. scale forming salts in the feedwater C. dissolved gases in the water D. improper operation of the DS heater25. A screw pump belongs to _according to its working principle A. recipmcating pumps B. po
20、sitive displacement pumps C. dissolved gases in the water D. centripetal pumps26. A centrifugal pump operating against a closed discharge valve has a/an_ A. capacity of 100% B. efficiency of 0% C. internal slippage of 0% D. shut off horsepower rating of 100%27. Before disconnecting a joint in a pipe
21、line, you should_ A. determine the size of the gasket B. hang a bucket under the joint C. have a first aid kit on hand D. be sure no pressure exists in the line28. It is possible to mount a double suction centrifugal pump impeller with the vanes facing in the wrong direction. This would cause the pu
22、mp _ A. head capacity to improve B. discharge to be reversed C. efficiency to decrease D. slippage to decrease29. If a centrifugal pump is driven by a constant speed electric motor and produces a discharge pressure less than designed, the cause is probably_ A. excessive pump speed B. excessive sucti
23、on head C. worn wearing rings D. gross pump misalignment30. Properties of a good refrigeration oil include_ A. low wax content B. high pour point C. high viscosity D. low wax content, high pour point, high viscosity31. The _ only allows for adjustment of temperature in each room by the occupant manu
24、ally controlling the air volume admitted. A. central air conditioning system B. high velocity system C. low velocity system D. single duct system32. The process of adding moisture to air to increase the relative humidity is known as_ A. sublimation B desiccation C. humidification D. miniaturization3
25、3. Sludgy may form in the crankcase of an air conditioning compressor as a result of _ A. bubbling refrigerant B. overheating and oxidation C. lowered operating temperatures D. reducing the cloud or floc point34. Which of the equipment listed is most effective in processing bilge slops for overboard
26、 discharge A. a 100 PPM oily water separator B. assembling the lube oil purifier as a separator and aligning it to the bilge overboard C. a 15 PPM oily water separator D. a magnetic duplex strainer35. When started, a complete oily water separating unit is first filled _. The oily water mixture is th
27、en pumped through the inlet pipe into the coarse separating compartment. A. with dirty water B. with clean waterC. by oily water D. by mixed water36. Which is the pollution prevention equipment? A. booster pump B. evaporator C. incinerator D. cooler37. Concerning the incinerators operation, which of
28、 the following is not correct?A. scavenging time should be more than 30 seconds before ignitingB. the oil temperature of waste oil tank is 80-100C. first igniting the incinerator with diesel oil when the temperature of hearth is about 600, the waste oil is drawn in.D. the ash from incinerator can be
29、 dumped into sea no distance limitation38. Bacteria which live _are said to be aerobic A. in the presence of oxygen B. without oxygen C. in the presence of nutrition D. without nutrition39. For a purifier changing to a gravity disc with smaller hole diameter will move the interface towards the _ A.
30、bowl periphery B. bowl center C. upper surface D. lower surface40. To ensure lube oil purifier working in normal condition, the interval between two sludgy discharging should not exceed _ hours. A. 2 B. 4 C. 5 D. 641. Which of the following problems will occur if a disk-type centrifugal lube oil pur
31、ifier is not properly primed prior to admitting oil flow to the bowl? A. Contamination of the lube oil by emulsification will result B. The lube oil will not be subjected to the proper centrifugal force C. The lube oil will overheat and flash D. Oil will discharge from the heavy phase discharge port
32、 and be wasted42. A vacuum is initially created in a flash type distilling plant by _ A. the flashing of the feed water B. the condensation of the saltwater feed C. air ejectors, eductors, of a separate vacuum pump D. condensation of the distillate43. On which of the following heated surfaces of a f
33、lash type evaporator would you be more likely to find soft scale formation? A. Feed-water heater internal tube surfaces B. Internal distillate cooler tubes C. Flash chamber vertical surfaces D. pressure control valve44. What type of valve is used to direct the flow of hydraulic fluid? A. relief valv
34、e B. direction control valve C. stop valve D. pressure control valve45. Another name for the “swash plate” in the variable delivery pump is _ A. tiltable disc B. gravity disc C. distributing disc D. catch plate46. The drive motor will have a brake arranged to fail-safe, i.e. it will _the load if pow
35、er fails or machine is stopped. A. lift B. put C. take D. hold47. If the pump for a hydraulic anchor windlass is over heating, the cause may be_ A. increased pump speed B. excessive pump discharge pressure C. too low of a tilting box angle D. low pump speed48. When the power is shut off, the wire_ A
36、. becomes slack B. can not be paid out unless the brake is overhauled or recover wire unless manually operated C. will be let out because the brake is out of work D. may be pay out due to no power49. An additive used to improve the ability of a lube oil to reduce friction is known as a/an _ A. suppr
37、essant additive B. dispersant additive C. extreme pressure additive D. viscosity improver additive50. Strainers are commonly used in hydraulic systems to _ A. protect the pump from fine soluble contaminants B. prevent solid particles from entering the pump C. prevent solid particles from entering th
38、e filter D. protect the directional control valves51. Current changing in direction and rising and falling in value is _ A. A.C. B. D.C. C. generator D. fresh water generator52. The magnetic field is provided by electromagnet, so arranged that adjacent poles have_ A. opposite polarity B. the same po
39、larity C. negative polarity D. positive polarity53. Prior to closing the breaker when paralleling two AC. generators, the recommended practice is to have the frequency of the incoming machine_ A. slightly less than the line frequency B. the same as the line frequency C. slightly greater than the lin
40、e frequency D. have nothing to do with the lien frequency54. The power factor at which a paralleled A.C. generator operates is usually adjusted by the _ A. connected load B. prime mover speed C. field excitation D. generators rated voltage54. When you are making a high potential test on a piece of r
41、epaired electrical machinery, a rise in leakage current indicates _A. good insulation B. bad insulationC. high insulation power factor D. a high slot discharge factor56. _is not a part of the main switchboard on board.A. Busbar B. Load panel of main generatorC. Paralleling panel D. Shore connection
42、box57. Usually, emergency electricity supplies to _on board A. cargo winch B. windlass C. steering gear D. main air compressor58. The ground terminal of a starter should be connected to _ A. the common ground point B. the starters frame C. the communicator D. the starters mounting bolts59. The separ
43、ate supplies are connected in either star or delta formation. The star formation is most commonly used and requires _ slip-rings on the alternator. A. two B. three C. four D. five60. As a general rule, the first troubleshooting action to be taken in checking faulty electric control devices is to _ A
44、. draw a one line diagram of the circuitry B. test all fuses and measure the line voltage C. take megger readings D. insulate the apparatus from ground61. When measuring AC current flow, you must always connect the meter _ A. in series with the power source and load B. in parallel with the power sou
45、rce and load C. insuring correct polarity D. using the lowest range possible to prevent instrument damage62. If a small electric motor is immersed in salt water it should be. . washed with free water; .dried in an oven A. only B. only C. both and D. neither nor 63. “AMIDSHIPS”refers to _ A. back of
46、vessel B. the middle portion of a ship C. a backward movement of a vessel D. across the ship, at right angles to the fore-and-aft centerline64._is the main cause to the damage of engine parts and excess wearing A. overload B. the odds of the load C. the default of engine parts D. overload and the od
47、ds of the load65. After “finished with engine”, which of the following cannot be shut off by the duty engineer? A. fuel oil booster pump B. the main starting valve C. the sea chest D. the main cooling sea water pump66. Which of the following is NOT a recommended safe practice? A. Securing equipment
48、against slipping or drifting B. Operating machinery at its recommended speed C. Repairing loose handles on tools before using D. Using tools for purposes for which they are not designed67. A class “C” fire would occur in _ A. bedding B. pipe insulation C. paint D. a generator68. If a fire occurs in
49、the boiler room as a result of a leaking fuel line, you should FIRST_ A. notify the engineer on watch B. isolate and secure the piping C. throw sand on the fire D. extinguish the fire using a combination nozzle with applicator69. Which of the following statements is true concerning carbon dioxide wh
50、en used as a fire extinguishing agent? A. Carbon dioxide is corrosive when exposed to fireB. Carbon dioxide should be applied slowly to a large engine room fireC. Its total cooling effect is far greater than waterD. Its smothering effect is excellent for class B fires70. As a duty engineer, as soon
51、as you hear the fire emergency signal, you should ensure that the _.A. ring buoys are thrown overboard B. engines are stoppedC. fire pumps are started D. life preserves have been issued to everyone71. When administering artificial respiration, it is of the utmost importance to _ A. use the mouth-to-
52、mouth method B. clear airways C. use rhythmic pressure method D. check the injured persons hearbeat72. What is the harmful effect of sulfur in a fuel? A. It causes excessive smoking and soot at low firing rates B. It doesnt readily burn when combined with oxygen C. It clogs fuel oil strainers more o
53、ften D. It forms a corrosive acid when mixed water or water vapor73. _, where minor repairs are carried out with a ship in service, often during a stay in port. This may be remote from a ship repair site. A. Voyage repairs B. Routine docking C. Damager repairs D. Conversion74. When ship in the dock rep
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 基礎專干面試真題及答案
- 《魚的循環系統》課件
- 《兒童早教推拿》課件
- 《構建高效財務管理體系》課件
- 《店鋪運營培訓課件》教案
- 2025年春季小學下冊二年級語文(統編版)-1.古詩二首(第1課時)教案
- 委托代建協議合法嗎
- 破產債權代理委托協議
- 《環境科學》課件2
- 《數據分析與統計:方差分析方法》課件
- 客車防雨密封性要求及試驗方法
- 農貿市場經營管理方案
- 新生兒胸腔穿刺術
- 液氣胸病人護理-查房
- 錯頜畸形預防課件
- 培訓行業用戶思維分析
- 23秋國家開放大學《小學語文教學研究》形考任務1-5參考答案
- 高中數學知識點全總結PPT
- 許昌職業技術學院教師招聘考試歷年真題
- 六年級下冊第四單元復習教學設計
- 臨床微生物學檢驗技術-蘇州大學中國大學mooc課后章節答案期末考試題庫2023年
評論
0/150
提交評論