1、Geotechnical Engineering Design in MiningTao Li PhDPrincipal & DirectorTL Geotechnics & MiningTLgmTLgmTL Geotechnics and Mining OutlineGeotechnical Engineering in MiningGeotechnical Engineering in MiningDesign Methodology and CriteriaDesign Methodology and CriteriaMine ExampleMine ExampleCon
2、clusion and SuggestionConclusion and SuggestionTLgmTLgmTL Geotechnics and Mining Comparison between Civil Engineering and Mining Mining Engineering has evolved together with Civil Mining Engineering has evolved together with Civil Engineering (1800 to 1900), although early mining Engineering (1800 t
3、o 1900), although early mining activity was found in Swaziland dated back 4100BC activity was found in Swaziland dated back 4100BC and civil between 4000-2000BCand civil between 4000-2000BCThere are many similarities between civil There are many similarities between civil excavations and mining exca
4、vationsexcavations and mining excavationsMining, in particular bulk mining, has been Mining, in particular bulk mining, has been increasingly larger, deeper and fasterincreasingly larger, deeper and fasterMining environment and materials are more variable Mining environment and materials are more va
5、riable spatially and temporally and often uncertainspatially and temporally and often uncertainCivil Engineering is often a major part in large Civil Engineering is often a major part in large mining project construction, hence civil engineers mining project construction, hence civil engineers emplo
6、yedemployedTLgmTLgmTL Geotechnics and Mining Geotechnical Engineering in MiningIt was established through necessity at mine It was established through necessity at mine sites/projects Mt Isa Mines established sites/projects Mt Isa Mines established first rock mechanics group in 1962-1965first rock m
7、echanics group in 1962-1965The focus has always been on the practical The focus has always been on the practical outcomes: safety, efficiency and innovation outcomes: safety, efficiency and innovation (such as backfill developed at Mt Isa Mines, (such as backfill developed at Mt Isa Mines, most rece
8、ntly Block and Panel Caving by the most recently Block and Panel Caving by the International Caving Study Group)International Caving Study Group)Now, just about all Australian mines, large Now, just about all Australian mines, large or small, pits or underground, have full time or small, pits or und
9、erground, have full time geotechnical engineers and on most project geotechnical engineers and on most project staffstaffTL Geotechnics and Mining TLgmTLgmGeotechnical Engineering in MiningTL Geotechnics and Mining TLgmTLgmGeotechnical Engineering in MiningConcurrently mining SLC above and BC below6
10、mtpa BC1100m below surface and high stress with variable rock mass strengthsExperienced major failures at undercut and partial high hang-ups5100 HF Drive5040 Southern Perimeter drive Open Hole & DHSE LocationsTLgmTLgmTL Geotechnics and Mining Design Methodology and CriteriaTL Geotechnics and Min
11、ing TLgmTLgmCriteriaCriteriaFeasibility (technical and financial)Feasibility (technical and financial)Constructability Constructability OperabilityOperability A design that works in real world - A design that works in real world - minemineUnderground Excavation DesignTL Geotechnics and Mining TLgmTL
12、gmExcavation methods:Excavation methods:Block caving, Panel caving, Sub-Level caving, Block caving, Panel caving, Sub-Level caving, benching, open stoping, Cut&fillbenching, open stoping, Cut&fillExcavation method selection and design Excavation method selection and design objectiveobjective
13、all about getting the mineral/ore out of ground all about getting the mineral/ore out of ground quicker, cheaper and most importantly safelyquicker, cheaper and most importantly safelyExcavation design approachesExcavation design approachesPrecedence, numerical modelling; empirical; Precedence, nume
14、rical modelling; empirical; trial&errortrial&errorObservation Based Design MethodsThe empirical methodsThe empirical methodssuch as Mathews Stability Graphsuch as Mathews Stability GraphThe trial-and-error methods with monitoring and The trial-and-error methods with monitoring and numerical
15、modellingnumerical modellingsuch as trial slope for stater pit in large open such as trial slope for stater pit in large open pits and pits and more recently BC and PC hydro-fracturing more recently BC and PC hydro-fracturing The back-analysis methodsThe back-analysis methodssuch as the “calibrated”
16、 modelling approachsuch as the “calibrated” modelling approach TL Geotechnics and Mining TLgmTLgmRisk and Return Design ApproachThe Risk and Return Approach (Lai 2012) The Risk and Return Approach (Lai 2012) emphasises on both geotechnical engineering emphasises on both geotechnical engineering aspe
17、cts and financial aspects to reach an aspects and financial aspects to reach an optimum deisgn.optimum deisgn.The impacts of most key design parameters and The impacts of most key design parameters and recommendations, such as mining method recommendations, such as mining method selection, sequence
18、and stope dimensions, selection, sequence and stope dimensions, cannot be accurately quantified. cannot be accurately quantified. A risk-based assessment approach is A risk-based assessment approach is increasingly being adopted to examine the increasingly being adopted to examine the designs feasib
19、ility, constructability, and designs feasibility, constructability, and operability operability TL Geotechnics and Mining TLgmTLgmSimultaneousOpen Pit - UG MiningCrown Pillar Failure Mining Induced SeismicityGWLGWL Inrushes Lift 1 Lift 2Abutment Stress Zones Depth 1100 mCave PropagationMajor SlopeIn
20、stabilitiesSubsidence31High In-Situ Stress FieldRock MassCharacterizationBh = 350 mFlRisk Management Considerations: Pit ? Block Cave?A fully integrated geotechnical design process for open pitsTL Geotechnics and Mining TLgmTLgmFrom CSIRO Large From CSIRO Large Pit Design ManualPit Design ManualCadi
21、a Hill Open Pit Steeper SlopesTL Geotechnics and Mining TLgmTLgmGeotechnical Domains, Design Sectors and Slope AnglesInter-ramp angle Inter-ramp angle 56-60 degrees 56-60 degrees and up to 200m and up to 200m height in more height in more competent and competent and less structured less structured d
22、omainsdomainsOther sectors Other sectors inter-ramp angle inter-ramp angle 35-46 degrees up 35-46 degrees up to150m heightto150m heightNorth wall 720m420Northwest wall 560m430West wall 550m520South wall 560m520East wall 580m460TLgmTLgmOptimum Design Must be Supported by Operation Excellence and Tech
23、nologyTL Geotechnics and Mining TLgmTLgmCadia Extended Pit Failure, Designed, Monitored and Video Taped when Occurred TL Geotechnics and Mining TLgmTLgmSimple monitoring and equation can do the trick just as wellTL Geotechnics and Mining TLgmTLgmCompleted mining 625 bench 15/7/04Tf = (T2-T1)2 +T1(2T
24、2 T1-T3)Conclusion and SuggestionGeotechnical engineering design in mining is a Geotechnical engineering design in mining is a “living” process that requires the considerations of “living” process that requires the considerations of the life cycle of a mine in order to deal with the the life cycle of a mine in order to deal with the many variables and uncertaintiesmany variables an
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 液壓與液力技術在健身器材中的應用考核試卷
- 社交心理學在決策制定中的應用考核試卷
- 電池充放電特性與循環壽命考核試卷
- 紡織原料與絹紡質量控制考核試卷
- 漁業機械人機工程學應用考核試卷
- 纖維素纖維在鞋類產品抗滑性與耐磨性改進考核試卷
- 礦山機械故障案例分析與預防考核試卷
- 天津藝術職業學院《細胞與組織工程》2023-2024學年第二學期期末試卷
- 山東省泰安市第一中學2025年高中畢業班第二次統測物理試題含解析
- 山東省棗莊樹人中學2024-2025學年初三化學試題5月模擬試題含解析
- 基于全生命周期的綠色建筑成本影響因素研究
- 2025年普法知識競賽題庫及答案(共80題)
- 碎石外包合同協議
- 心力衰竭護理查房 課件
- 【課時練基礎作業】人教版四年級數學下冊第四單元《期中計算能力測試》(含答案)
- 2025年第三屆天揚杯建筑業財稅知識競賽題庫附答案(1001-1536題)
- 2025科技輔導員培訓
- 樹木修剪合同協議
- 新疆維吾爾自治區2024年普通高校招生普通類國家及地方專項、南疆單列、對口援疆計劃 本科一批次投檔情況 (理工)
- 智研咨詢發布:2025年紙漿模塑餐飲具行業市場規模及主要企業市占率分析報告
- 2025年CCAA《管理體系認證基礎》考前必練題庫500題(含真題、重點題)
評論
0/150
提交評論