1、工程施工合同 Con tract 合同編號(Contract NO.): 簽訂日期(Date ): 發包方(簡稱甲方) Party A: 承包方(簡稱乙方): Party B: 根據中華人民共和國合同法以及其他有關法律法規規定的原則,結合本工程的具體情況, 甲、乙雙方在平等、自愿、協商一致的基礎上達成如下協議,共同遵守。 Accord ing to P.C Con tract Law”,and other releva nt laws and regulati ons to the specific circumsta nces of this project, parties A and B
2、 have hereby equally and volun tarily en tered into the followi ng agreeme nt executed on the basis of mutual respect. 1.工程概況 Project overview 1.1 工程名稱: Project n ame: 1.2 工程地點: Project locatio n: 1.3 工程范圍: A. 新研發中心和新廠房的網絡綜合布線系統的施工; B. 數據中心的建設,主要包含:數據中心的裝飾工程、電氣系統、空調系統、機房閉 路監控系統、機房門禁系統、消防系統改造、機柜系統等。
3、Project conten ts: A. The new R B. Data Center, mainly includes: data center decoration and electrical systems, air-conditioning systems, CCTV systems, access con trol systems, firefight ing system reform, server rack systems. 1.4 開工條件:合同生效后,甲方預付款到位和現場具備開工條件。 Start con diti ons: After the comme ncem
4、e nt of the con tract, Party A has started adva nee and on-site con diti ons in place. 1.5 工程造價:合同工程總造價為Y 元(CNY ),人民幣大寫 Project cost: Total project cost is yuan ( CNY ). 詳細合同價格表見附件報價清單。 Detailed con tract price list see attached quotatio n list. 在詳細設計和施工過程中,若工程量發生變化,按合同單價相應調整工程造價;若材質發生 變化,按雙方商定的補充協議
5、調整工程造價。 In the detailed desig n and con struct ion process, if the project qua ntity cha nges, accord ing to the con tract price adjustme nt project cost; if the material is cha nged, the suppleme ntal agreeme nt agreed by both parties for adjustme nt of engin eeri ng cost. 2. 付款方式 Terms of payme nt
6、 2.1由乙方向甲方提供指定帳戶、甲方以支票方式或銀行轉賬方式向乙方結算合同款; Party B shall provide the desig nated acco unt to party A, Party A by check or bank tran sfer to pay the con tract payme nt to Party B. 2.2 本合同生效后,甲方付給乙方合同總價的40%作為工程預付款,即Y 元; After the sig ning of this con tract, Party A shall pay to Party B 40% of the total
7、con tract price as the project adva nee payme nt; 2.3 數據中心及網絡布線系統工程完工并且雙方簽訂工程驗收報告后7天以內,甲方付給 乙方合同總價的 55%,即Y 元; Data center project and network cabling systems engineering completed and signed a project accepta nee report by both parties with in 7 days after, Party A shall pay to Party B 55% of the co
8、n tract price. 2.4 工程竣工后3個月內,甲方支付給乙方剩余的合同款,即Y 元; After the completi on of the project within 3 mon ths, Party A shall pay to Party B the remai ning con tract price. 3. 雙方職責 Resp on sibilities of the parties 3.1甲方職責: Resp on sibilities of party A: a. 及時以書面形式通知乙方本工程具備開工條件的時間; Timely written notice to
9、Party B the conditions of this project have the time to start; b. 協助乙方辦理進駐施工現場所需人員證件、批件等有關手續; To assist Party B to enter the construction site personnel required documents, approval documents and other relevant procedures; c. 為乙方提供現場工程辦公室和足夠的現場倉庫; To provide on-site engineering office and sufficient
10、 field warehouse; d. 積極協助乙方施工,協調施工時與各部門的配合,并負責提供工程所需的現場平面圖及 建筑結構圖。 Actively assist Party B construction, coordination with various departments, and responsible for providing the needed for the project site plans and architectural drawings. e. 及時按合同規定之付款進度向乙方支付工程款項。 Timely according to the terms of t
11、he contract payment schedule to pay Party B project funds. 3.2 乙方職責: Responsibilities of party B: a. 乙方在工程開始前應組織有關人員研究和熟悉圖紙,參與設計交底,安排施工總進度計 劃并提交給甲方; Party B before the project begins shall organize relevant personnel to study and be familiar with drawings, involved in the design work, arrangement of
12、 construction general schedule plan and submit to Party A; b. 向甲方或項目監理提供所購各種產品、設備的技術資料,接受進場檢驗; To the party A or project supervision to provide the purchase a variety of products, equipment, technical information, accept entry inspection; c. 遵守甲方或監理方對施工現場的有關規定; Abide by the party or the supervision
13、on construction site of the relevant provisions; d. 按時完成乙方所承擔的施工任務,保證工程施工質量。 Timely completion of construction tasks undertaken by Party B, to ensure construction quality. 4. 施工與工程設計變更 Construction and engineering design change 4.1 乙方在施工中要根據國家頒發的施工驗收規范和質量檢驗標準,以及設計要求進行, 要求全部工程達到合格標準。 On the construct
14、ion of Party B according to the country issued construction acceptance norms and quality inspection standards, as well as the design requirements, all project achieve the qualified standard. 4.2 在施工中,要堅持按照設計文件和施工圖紙施工,任何一方不得隨意變更設計,如出 現窩工、返工和材料損失,以及增加勞動力成本等,由于甲方的原因造成的,損失由甲方承 擔,由于乙方的原因造成的,損失由乙方承擔。 Duri
15、ng construction, to adhere to the design documents and construction drawings of the construction, any party shall not be arbitrarily changed design, such as the emergence of idleness, rework and loss of material, as well as an increase in labor cost, as the party A s cause, loss borne by the party A
16、, the Party B causes, losses shall be borne by Party B. 4.3 在施工中,若甲方 A 有變更設計文件的要求,應書面通知乙方;若乙方發現設計文件 有錯誤或嚴重不合理的地方, 也應書面通知甲方, 雙方商定并修改設計文件和圖紙后方可繼 續施工。 During the construction, if the party A to change the design document, shall give a written notice to Party B; if Party B is found the design documents
17、are wrong or serious unreasonable place, should also be written notice to Party A, both sides agreed and modify design drawings and documents before it can continue to construction. 4.4 在施工過程中,如遇下列情況,需順延工期,雙方應及時進行協商,并通過書面形式 確定順延期限: In the process of construction, in case of the following circumstanc
18、es, be extended period, both parties shall timely consultations, and through the written form to determine the extension of the time limit: a. 因天災或人力不能抗拒的原因被迫停工的; Because of natural disaster or the manpower irresistible reasons forced shutdown; b. 因甲方提出變更計劃或變更施工圖而不能繼續施工的; Because party A proposed ch
19、anges to the plan or change the construction graph therefore cannot continue construction; c. 乙方不能按期供設備或所供材料或者設備不合規格要求,被迫停工或不能順利施工的; Party B fails to supply equipment or for the materials or equipment of different specifications, was forced to shut down or not smooth construction; 5. 竣工驗收與售后服務 Final
20、 acceptance and after-sales service 5.1 乙方必須嚴格執行隱蔽工程驗收制度, 凡隱蔽工程完成后, 必須經過驗收并作好記錄 (隱 蔽工程指墻內、吊頂內的管線施工等) 。 Party B must strictly enforce the hidden work system, where the hidden work has been completed, must pass inspection and make records (hidden works refers to the wall, the ceiling inside the pipeli
21、ne construction, etc.). 5.2 整體工程竣工后,乙方向甲方提交竣工文檔并提交書面驗收申請。甲方接到申請后 日內組織有關人員按照合同內容和事先約定的驗收條款進行項目驗收, 并出具雙方簽字的驗 收報告。如甲方不能按期組織驗收, 須提前通知乙方,并與乙方另行商定驗收日期,但甲方 必須承認乙方的竣工時間。甲方推遲驗收,其間所發生的管理費和各項損失均由甲方負擔。 如果提交驗收申請后一個月仍未能完成驗收,則以竣工之日作為系統的保修開始日期。 When the whole project is completed, Party B shall submit to party A co
22、mplete documentation and submit a written acceptance application. Party A shall within 7 days after receiving the application organize relevant personnel in accordance with the contract contents and the prescribed inspection clause of project acceptance, and issue the report signed by both parties.
23、If Party A fails to organize acceptance, shall inform Party B in advance, and Party B to be agreed date of acceptance, but party A must acknowledge party B completion time. party A delayed acceptance, during which occurred in the management fees and all losses shall be borne by Party A. If the submi
24、ssion of acceptance application one month after failed to complete acceptance, the completion date as the system warranty start date. 5.3 工程驗收合格后進入質保期。質保期為驗收合格之日起 12 個月。在質保期內,乙方應 對系統除人為因素外的所有故障負責免費維修或更換。 Project after acceptance into the warranty period. Warranty period from the date of acceptance o
25、f 12 months. During the warranty period, Party B shall system in addition to human factors all fault is responsible for free repair or replacement. 5.4 在質保期內, 乙方做到對甲方求援電話 2 小時內響應, 8 小時內抵達現場并著手解決問 題。質保期結束后,乙方對系統進行有償維護。有償維護的費用由雙方協商。 During the warranty period, Party B shall do to help telephone respon
26、se within 2 hours, 8 hours to arrive at the scene and set about solving the problem. After the end of the warranty period, Party B on the system paid maintenance. Paid maintenance costs through consultation by the two parties. 6. 技術服務和培訓 Technical service and training 6.1 由乙方按技術培訓大綱負責對甲方的有關操作人員和維修人員
27、進行使用級培訓。通過 培訓,使甲方的受訓人員能掌握系統設備的配置, 能進行正確操作和日常維護及一般常見故 障排查。接受培訓的人員由甲方確定,日期由甲乙雙方共同商定。 Party B according to the technical training program for Party A s operators and repair personnel to use class training. Through training, the trainees can grasp the party system equipment configuration, can correct op
28、eration and routine maintenance and common trouble shooting.Trained personnel were identified by the party A, the date mutually agreed by both parties. 6.2 在保修期內,乙方提供兩次上門巡檢服務,包括各系統運行狀況的查看、記錄,以及 必要的設備維護。 During the warranty period, Party B shall provide two on-site inspection services, including the
29、status of system view, recording, and the necessary equipment maintenance. 6.3 乙方為甲方免費提供網絡綜合布線系統和數據中心的技術咨詢服務。 Party B shall provide free network cabling system and data center technical advisory services. 7. 違約責任 The liability for breach of contract 7.1 乙方提供貨物的質量或規格不符合合同約定,行業規格或政府的法令法規的要求的, 甲方可以根據貨物
30、的性質以及損失大小, 要求乙方承擔修理, 更換,退貨,減少價款等責任。 Party B shall provide the quality or specifications of the goods does not conform to the contract specifications, industry or government regulatory requirements, Party A may according to the nature of the goods and the loss of size, B should bear the repair, repla
31、cement, return, reduce cost. 7.2 乙方除因受中華人民共和國合同法規定的不可抗力因素影響外,如果未能按計劃 施工,則乙方在竣工之日前,每日應按甲方所支付合同款的1 %。(大寫:千分之一)賠償甲 方損失。 Party B except due to P.R.C Contract Law provisions of force majeure factors, if the construction not on schedule, then Party B in the completion date, daily should be paid by Party A
32、 contract to 1 % (in words: 1/1000) compensation for the loss of Party A. 7.3 在履行合同過程中,如果乙方提前獲知有不能按時交貨或提供服務的情況,應及時以 書面形式將不能按時交貨的理由、 預期延誤時間通知甲方。 甲方收到乙方通知后, 認為其理 由正當的,可酌情延長交貨時間。 During performance of the contract, if Party B know ahead of time has not delivered on time or to provide service, should be
33、 promptly in writing of the reasons for not delivered on time, anticipated delay time notify party. Party A received notification, think its reason, could be appropriate to extend the time of delivery. 7.4 若由于甲方更改設計需求、未確認材料或設備型號、未確認施工方案而導致設備訂貨 周期推遲,因此導致的延遲交貨,乙方不負擔任何責任。 If due to Party A to change th
34、e design demand, did not confirm material or equipment models, unrecognised construction scheme caused by equipment order cycle time delay, thus causing the delay of delivery, Party B does not bear any responsibility. 7.5 甲方在合同規定的付款期限內未能及時付款,視為甲方違約。甲方每日按合同款項的 千分之一賠償乙方損失。 Party A in the contract paym
35、ent period failed to timely payment, regarded as a breach of contract. Party A according to the contract sum 1/1000 daily compensation for any loss of Party B. 7.6 甲乙任意方因第三者的原因造成違約的,應向對方承擔違約責任。 Any party for the third party reasons for default, shall be liable to the other party for breach. 8. 合同的變更
36、 The modification of Contract 合同需在甲乙雙方公平協商, 達成一致的條件下進行變更, 變更的內容需以文字正本形式經 雙方授權人簽字并蓋章后生效。 一切變更內容作為附件存在與合同正本具有相同的法律效力。 Any modification must on the basis of fair negotiation and be accepted by both sides. The formal file of modified contract should be validating after signed and stamped by authorized person of both sides. All change to the content as an attachment with the original contract have the same legal effe
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 山東省臨沂市蘭陵縣第一中學2025屆高三第三次適物理試題含解析
- 湘潭醫衛職業技術學院《分子生物學韓》2023-2024學年第二學期期末試卷
- 山東省菏澤市第一中學2024-2025學年高三“零診”考試物理試題含解析
- 山西水利職業技術學院《鋼琴即興伴奏(2)》2023-2024學年第二學期期末試卷
- 四川省成都市青羊區石室教育集團2025年初三期末物理試題含解析
- 四川師范大學《智能信息處理》2023-2024學年第二學期期末試卷
- 井陘礦區2025屆數學三下期末質量檢測試題含解析
- 四川鐵道職業學院《大學體育(4)》2023-2024學年第二學期期末試卷
- 江西信息應用職業技術學院《電機學》2023-2024學年第二學期期末試卷
- 山西警官職業學院《小學數學課程標準與教材研究》2023-2024學年第二學期期末試卷
- 2024至2030年中國車用氮氧傳感器行業市場發展調研及投資前景分析報告
- 人工肩關節置換(反肩)
- 離婚協議書范本2個孩子可打印
- 人教版 水平四 《一百米跑》說課稿
- 藏族民間舞-熱巴舞智慧樹知到期末考試答案章節答案2024年西藏大學
- 浙江省中小學心理健康教育課程標準
- 《何西阿書一概要》課件
- 超市經銷商轉場協議書
- 中華全國律師協會律師知識產權盡職調查操作指引
- 人教版高一下學期期中考試數學試卷及答案(共兩套)
- 產科診療指南及技術操作規范
評論
0/150
提交評論