1、On civil engineering Road and Bridgeconstruction quality management1. IntroductionCivil engineering building project success lies in the quality of quality,separate,othereverythingis out of thequestion.Therefore,to takecivilengin eeri ng con structi on qualitymanagementin the construction project im
2、plementation plan and impleme ntati onprocess.In practice, no more than the use of engineeringquality ofcare. But to ensure the constructionquality, using the partythere is a need for the organizationexperieneed professionalqualitymanagement team, design of the whole constructionprocess,in cludi nge
3、ngin eeri ng desig n, con structi on un its,building material, constructionprocess and supervision and otheraspects of the management, but also guide the construction unit of thecon structi onpers onnelto timely and effectivelyencourages training.This article from the above several aspectsto discuss
4、.2. Construction of the effective surveillanee on the use of unit,design unit as a design once, is the work of supervisors, why should I organize the qualitysurveillanee team? Because ourcountryconstructionthere are still many unsatisfactoryobjective or objective aspects, the unit is necessary to hi
5、re have the sense of responsibility,have managemenbxperienee, familiarwith the policies and regulati ons, have good com muni cati on ability quality management, set up qualitymanagementteam, theconstructiondesign and construction process for effectivemanagementmonitoring.The managementteam, can acco
6、rding to theengineering build pause status stop adjustment,implementationof compulsory system. On ordinary civil construction, quality managementis relatively easy, with the possible exception of new in formatio n on the use of new tech no logy, the whole quality managementmore rule-based. On specia
7、l request of civil building engineering,qualitymanagementwillbe arranged to stop.First of all, on the quality of project design management.This stage, mainly for the design units in strict accordanee with the un it can the fun dame ntal request stop desig n, to check whether reas on able desig n pla
8、 n, desig n intent can and the surro unding geographical environment as well as local humaneenvironment of harm ony, in the tech no logy and the budget is feasible, can be adva need tech no logy, reliable structure can safely, whether the un it in charge of con structi on appropriatetech no logy req
9、uest etc.These aspects of the managementand inspection,in relationto the whole building after project completion,in the use offunction, quality,humanphysical performanee and other aspectswhether can reach certain degree of satisfactionof the big issue.At this stage,management personnelmore to listen
10、 todesigners to design the idea, a lot of advisory applicationunitin macroscopical and microcosmic staff views on initiative,makedesign to perfection.In addition,to check the design drawings can correctlyreflect the desig npla n,calculated correctly,draw ingdimensioning can have mistakenly,selection
11、of materials andcon structi on request whether reas on able,the overall desig n ofvarious departments such as can harmonious design. Because our country is in the design and supervision work still is lacked very much, in the aspects of man ageme nt and exam in ati on must be careful, in order toprev
12、e ntsubseque ntqualitydisputes.Secondly,to the constructionsupervision supervision.Con structi onsupervisi onis the key toguara nteetheconstruction quality. Qualitymanagement departments shouldpromptly to supervisiondepartments to key local constructionquality monitoring report,implement supervision
13、duty. At thesame time, but also in a timely manner, sampling test,certaincon structi ontech no logy can fit desig n request. On con structi onsupervision departments, to check its supervision can improve the supervision work procedure, to check whether supervision report specificati on,not incon for
14、mitywith the requests ofconstruction operation can be corrected in a timely manner.Aga in, on the con structi onequipme nt and con structi onpersonnel basic qualitysupervisionand inspection constructioncan stop, with safe and reliable, can satisfy the design request and to complete construction;cons
15、tructionteam consisting ofwhether reas on able, the con structi on of the tech ni calstaff towhether accord with basic request, especially on special request link, can have the equivale nt level tech ni cal pers onnel in charge of participatingin the construction process. Pay attention tothe quality
16、 of constructionunit, it progresses to the legal view.On raw materials procurement and construction of test procedures are detailed records.In addition,to stop the construction effect of sampling,discover a problem, timely and in spect man agepers onnel con tact, stop the rectification, to prevent t
17、he engineering dispute, avoid engineeringqualityformationof waste.3. Con structi on of the various com muni cati on qualityman ageme ntwork is not a design and construction method for cubic, but theentire project important constituent, it is designed with all releva nt un its of the diverge nt in te
18、rests of. Prese nt quality problems, the parties involved have the duty, have loss. At this point, the qualityman ageme nt must com muni cate with releva ntparties, won the understanding and support. In addition,in theprocess of construction, also often encounter the construction side of the design
19、request of doubt problem. The generation of these problems, sometimes due to the use of units of detailed request, some are the result of the design concept and design thoughts of the reasons, somedue to the constructionprocess therequest of differentcaused. These problems cannot be ignored,should b
20、e promptly to com muni cate, un dersta nd the request, the timely adjustment.Not conscious construction,so that thepracticalresultsand design request is betrayed, and the use ofunits ofthe basicrequest ofbetrayal,unnecessary disputes andlosses.4.Con structi onpers onneltrai ningand en couragecivilen
21、gineeringbuilding operators is worker of a gleam of. From theprese nt situati on,the con structi onteam of in dividual tech ni calquality is also very important. Some constructionunit,constructionpersonnel activity, the construction of personnel practice degree no true assessment, making the constru
22、ction quality to sell at a discount greatly.Then, is it right? A start to constructionpersonnelexam in ati on,request to high level? At least from the nowsituation, which is not ideal. First,each building project onthe detailed con structi on tech no logy has differe ntrequest.In the organization of
23、 the construction process, request a certain proportion of with somedegree of worker technician, another local can have initial operation skills of construction workers. Duringthe con structi on process, to guide the con structi onof areas on able distributio nof work, makethe workers work in practi
24、ceto further mature somebasic types of operational procedures and technical requirements,and on this basis, the organizationstaffto stop training, make the un dersta nding of the n ew tech no logy, becomeestablished during the construction of the backbone. Then let them in the work of a scheme to ot
25、her constructionpersonnelto impart technical.In this respect, the con structi onun it accord ingto thedetailed status of layout. There has bee n a reas on able trai ning mechanism, the constructionpersonnel to understand the practical operation level, and improve their technical level of power. Inth
26、e long run, the overall quality of the progress of the constructionunit is also very important.On the other hand, effectiveencouragement and improveconstructionworker job enthusiasm and learning enthusiasm of thenecessary measures. Frontline workers mostly from rural,energyconsumption,the low pay, t
27、he mood is stable. Therefore, toestablish effectiveencouraging mechanism. To ensure that thewage Qing mon th, labor safeguard measures, man ageme ntof huma n nature, care workers and Ankang. In addition, to organize the workers in volved in the con structi on man ageme ntand tech no logy research, f
28、ully adjustable open invention enthusiasm of workers. Tech no logy progress leads to an in crease in in come, so as to promote the stable constructionteam, the construction qualityis very important. It is hard to imagine that a majority of people full of grievances of the construction team can achie
29、ve the task.5 con structi onman ageme ntOn the con structi onqualityman ageme nt,mai nly in volves threeaspects, one is about the design, survey and document review management. On design, reconnaissanee unit quality behavior and resultsof the activities of the supervision, the emphasis isplaced on t
30、he design,survey and document review supervisorycon trol. If the violati onof the releva nt laws, regulati onsandmandatory standards for the design and survey documents, can be through direct economic penalties and legal sanctions,enablingdirect responsibilityassumed by the error caused by negligene
31、eor intentionalqualityresponsibility.Two of the activities ofthe biddingmanagement, focuses on the constructionbiddingsupervision,market supervision and quality supervision theeffectiveintegration,through the quality supervision to promotethe market competition and standardizationof the benignoperat
32、ion, effectively through market operation, to ensure the validity of quality supervisi on. Three is the text of the con tract supervisi on,is the focus of con structi oncon tract supervisi on,quality managemenstandardization and legalization to fulfil the terms of the con tract, the legal effect of
33、con tract bi ndi ng the construction quality and results.By analyzing the three aspectsof exam in ati on and supervisi on,to achieve the gover nmen tsconstruction quality of the implementationprocess control andsupervision.Before the construction, in the final analysisisthe emphasis of quality manag
34、emenfor owners of quality behavior management, because the owner of all these activitiesof theorganizers,decision makers, which is the standard constructionowner quality behavior and results of the activitiesof the importa nt measures.6 constructionmanagement6.1 Lraw materials qualitycontrolMaterial
35、 quality engineering construction quality is the key, use of raw materials does not meet the requirements of engineering,engineering quality can not meet the requirements.Therefore, in the constructionqualitycontrol of stop beforecon structi onon materialqualitycontrol,to ensure the qualityof materi
36、als, in orderto improvecon structi onquality.Forthecon trol ofmaterials, first of allto the commonmaterialsupplyn ecessaryaudit, selectqualifiedsuppliersfor the supplyofmaterials.Sec on dly, toapproachthe necessaryin specti onofrawmaterials,in cludi ng:qualityin specti onreportoftheinspection, the i
37、nspection of appearanee, physical and chemical inspection inspection. Through a series of tests to ensure the quality of the raw materials entering.6.2 procedures and time limitcontrolTo implement the handover inspection system, on the procedures of unq ualified shall en ter into n ext work ing proc
38、edure construction. At the same time construction quality affected by seas ons, the reas on able arran geme nt of con structi on schedule is to ensure the engineering quality are important measures, and blindly rush period will inevitably lead to serious consequences.Quality control step is to estab
39、lish quality control, selectedkey and key tech no logy to un dertake the key is checked, the two is to strengthen the operation of the management,project quality is good or bad, depends to some extent on the constructionofpers onnel operati on level.6.3 in crease on-site in specti onsQuality managem
40、entin the constructionsite should strive tograsp first-handinformation,and strive to achieve the timelycontrol, for the occurrenee of the problem must accomplish early discovery, early correction of bad old practices die hard, avoid, avoid large loss. For example, in the mason ry tie bar exam in ati
41、 on, if take n after the completi on of a masonry ope ning exam in ati on, is not easy to check, and to identifythe problems are alsodifficult to remedy, but in the on-siteinspection in a timelymanner to solve, can avoid bigger loss, but also easy to get the cooperati on.The entity qualityinspection
42、 methods should adopt scientificmonitoringinstruments and equipment, to provide accurate,reliable and convincing data,stre ngthe nthe gover nmentengineering quality supervisionand inspection of scientific andauthoritative. Through thesupervisi on,to en sure theimplementation of mandatory standards,
43、ensure the constructionof law, regulationsand standard carry out, from macroscopicaloverall grasp the construction project quality and structure safety. In addition,in strengthening program managementat thesame time, we must stre ngthe n the tech ni calcon trol.Tech no logycontrol method using stand
44、ard evaluation method is better. Evaluation of standard methods are mainly as follows: one is the on site quality assura nee con diti on exam in ati on and evaluati on, two is the completion of the project the detection results of the exam in ati on and evaluati on, three is on site quality assura n
45、ee data exam in ati on and evaluati on, four of engin eeri ng en tity size deviati on of the measured, five is for the completi onofengineering the macro visual inspectionevaluation.6.4 after the completion of the managementAfter the completion of the qualitymanagementof constructionprojects is put
46、into use check management. First of all to ensure that do not meet the quality standards of the project can not be put into use, avoid inferior project to the state and public users cause direct harm and in flue nee. The sec ond is the decorati on, repair and maintenance of qualitysupervisionin cons
47、tructionproject whole life quality management category : one is to elim in ate or reduce due to reno vati on, maintenance process caused by irregularities on the construction engineeringfoundation,body structure and environmentai quality, damage, cause quality accident. Two is prevented due to repai
48、r, maintenance quality is not up to the requirements to the state and public users production and livingenvironment caused by direct damage. At this stage ofthe supervisionshould be emphasized good two close: it isstrictly for its completion and acceptanee review, supervision, to ensure that the reg
49、istration of the reliability, authority and effectiveness. Two is to enhance the decoration, maintenance of qualitymanagementin the process, so that constructionprojectwhole life quality objectives are effective implementation, for users to create a safe, comfortable, healthy production,livingenviro
50、nment, so that the construction quality and realizingthesusta in abledevelopme nt.Advocat ing and impleme nti ngprojectquality in sura nee, the project quality man ageme ntinto econo mic managementcategory,to solve engineering after the delivery ofquality problem tenants to find the responsibleparty
51、 for anymen ace from the “rear ”.This phase is the project by constructionto use or productionof mark; is on engineering quality inspection the necessary link; is the guara ntee con tract task is fini shed in the round, improve project quality level of final checks. The unit after the completion of
52、the project,must undertake the finalinspectionand test. Un it engin eeri ng tech ni calpers on in charge should beprepared for the dema nds of in formatio ncollected materials,equipment, component quality certificate of materials, a variety of material test data, record of concealed work, constructi
53、onrecords records. By the tech ni cal director of project orga ni zati on project tech no logy, quality, producti on and other releva nt professi onal and tech ni cal pers onnel to the sce ne inspectionand evaluation.To identifythe constructionqualitydefects should be corrected, and should be correc
54、ted once again after the verificati on to dem on strate con formity.To en sureengin eeri ngquality accord with man datory sta ndarddesig ndocume nts and the requireme nts of the con tract, the employer, the Min istry of supervisi on of the project completi on report.Attended by the constructionunit
55、of the organizationof the mainparties in volved in the completi onof in itial in specti on,acceptanee procedure.7.C on clusi onIt is ofte n said,should be a matter of expediency incon structi on,quality first,however, the quality problem isemerge in an endless stream.If in the constructionprocess of
56、someli nks, quality differe nee,these differenee basically fromaccumulated will change the whole engineering quality. Therefore,do not let every link of the qualitymonitoring,on the problemof construction promptly corrected, is to use units, design units, as for as to constructionunit as, namely to
57、society as. With sucha sense of duty, our engineering degree will gradually progress, can form the good work habits.Constitute the benign developmentof buildingconstructionenvironment. On the other hand, qualitymanagement cantthink of what to do what, to systematic,procedural, design the whole managementprocess, all the data, project compilation record, best to establish a computer database, stored in the computer. Man ageme nt of exam in ati on conclusions,text, image, and correctingthe situationchartproblem t
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 江西省贛州市章貢區2025屆初三第四次月考(生物試題)試題含解析
- 內蒙古工業大學《植物造景技術(一)》2023-2024學年第二學期期末試卷
- 四川傳媒學院《設計素描(一)》2023-2024學年第二學期期末試卷
- 惠民縣2024-2025學年四下數學期末經典模擬試題含解析
- 昆明學院《模具制造工藝及設備》2023-2024學年第二學期期末試卷
- 浙江旅游職業學院《文創設計》2023-2024學年第二學期期末試卷
- 清華大學《文化政策與法規》2023-2024學年第一學期期末試卷
- 樂山職業技術學院《品牌與消費研究》2023-2024學年第二學期期末試卷
- 江西省贛州市寧都縣三中2025年高三第三次階段考試英語試題含解析
- 陜西省興平市華興中學2024-2025學年初三統一質量檢測試題生物試題試卷含解析
- 病人欠費催繳通知單
- MT 191-1989煤礦井下用橡膠管安全性能檢驗規范
- JJF 1319-2011傅立葉變換紅外光譜儀校準規范
- GB/T 4857.4-2008包裝運輸包裝件基本試驗第4部分:采用壓力試驗機進行的抗壓和堆碼試驗方法
- GB/T 25174-2010飼料添加劑4,7-二羥基異黃酮
- GB/T 17421.2-2000機床檢驗通則第2部分:數控軸線的定位精度和重復定位精度的確定
- GB/T 17311-1998標準音量表
- 耳鼻咽喉15種臨床路徑(整理完整版)
- GB 26851-2011火災聲和/或光警報器
- 司法鑒定人執業能力評估業務理論知識考試題庫
- 110KV 線路保護調試報告
評論
0/150
提交評論