教學單元2市政管道開槽施工TeachingUnit2:MunicipalPipelineTrenchingConstruction2.4
溝槽支撐2.4TrenchSupport【教學目標】[TeachingObjectives]通過本單元的學習:Bystudyingthisunit,youwill:1.掌握開槽施工的工序;1.Mastertheproceduresoftrenchexcavation;2.開槽施工的技術措施;2.Learnthetechnicalmeasuresfortrenchexcavation;3.明溝排水方法;3.Understandopentrenchdrainagemethods;4.輕型井點降水設計方法與布置要求;4.Learnthedesignmethodsandlayoutrequirementsforlightwellpointdewatering;5.溝槽開挖土方量計算方法及開挖要求;5.Understandthemethodsforcalculatingtrenchexcavationearthworkvolumeandexcavationrequirements;6.溝槽支撐的支設與拆除方法;6.Learnthemethodsforinstallingandremovingtrenchsupports;7.管道鋪設與接口方法;7.Understandpipelinelayingandjointingmethods;8.管道檢驗方法與要求;8.Learnthemethodsandrequirementsforpipelineinspection;9.溝槽土方回填的要求與方法;9.Understandtherequirementsandmethodsfortrenchbackfilling;10.熟悉柔性排水管道施工方法。10.Familiarizeyourselfwithflexibledrainagepipelineconstructionmethods.向前Forward結尾End向后Backward開端Beginning2.4溝槽支撐2.4TrenchSupport定義:
Definition:支撐是由木材或鋼材制成的防止溝槽土壁坍塌的一種臨時性擋土結構。
Supportsaretemporaryretainingstructuresmadeofwoodorsteeltopreventtrenchwallcollapse.考慮因素:
Considerations:土質、地下水情況、槽深、槽寬、開挖方法、排水方法、地面荷載等。
Soilquality,groundwaterconditions,trenchdepth,trenchwidth,excavationmethods,drainagemethods,surfaceloads,etc.結構要求:
StructuralRequirements:牢固可靠,支撐材料的質地和尺寸合格;
Sturdyandreliable,withsupportmaterialsmeetingqualityanddimensionalstandards;在保證安全的前提下,節約用料,宜采用工具式鋼支撐;
Economicaluseofmaterialswhileensuringsafety;tool-typesteelsupportsarepreferred;便于支設和拆除及后續工序的操作。
Easytoinstallandremove,andfacilitatessubsequentoperations.一、支撐種類及適用條件1.TypesofSupportsandApplicableConditions2.4溝槽支撐2.4TrenchSupport向前Forward結尾End向后Backward開端Beginning1、橫撐1.HorizontalBracing由撐板(擋土板)、立柱和撐杠組成。Composedofretainingboards(shoringboards),standcolumns,andstruts.擋土板放置位置PlacementofRetainingBoards{斷續式Intermittent連續式Continuous斷續式橫撐的適用場合:ApplicableConditionsforIntermittentHorizontalBracing:——適用于土質較好,地下水含量較小的黏性土且挖土深度小于3m的溝槽或基坑。—Suitableforcohesivesoilswithgoodqualityandlowgroundwatercontent,andtrenchorpitdepthslessthan3meters.橫撐圖HorizontalBracingDiagram1-撐板;2-立柱;3-工具式撐杠1-RetainingBoard;2-StandColumn;3-Tool-typeStrut連續式橫撐的適用場合:ApplicableConditionsforContinuousHorizontalBracing:——較潮濕的或散粒土及挖土深度不大于5m的溝槽。—Suitablefordamporgranularsoilsandtrencheswithexcavationdepthsnotexceeding5meters.一、支撐種類及適用條件1.TypesofSupportsandApplicableConditions2.4溝槽支撐2.4TrenchSupport挖槽到一定深度或接近地下水位時,開始支設,然后逐層開挖逐層支設。Begininstallationofsupportswhenthetrenchreachesacertaindepthorapproachesthegroundwaterlevel,thenproceedwithexcavationandsupportinstallationlayerbylayer.豎撐支設時:先在溝槽兩側將撐板垂直打入土中,然后開始挖土。Forverticalbracinginstallation:first,drivetheretainingboardsverticallyintothesoilonbothsidesofthetrench,thenbeginexcavation.經常檢查槽壁和支撐的情況,尤其在流砂地段或雨后。如支撐各部件有彎曲、傾斜、松動時,應立即加固,拆換受損部件。如發現槽壁有塌方預兆,應加設支撐,而不應倒拆支撐。Frequentlycheckthetrenchwallsandsupports,especiallyinquicksandareasorafterrain.Ifanycomponentofthesupportisbent,tilted,orloose,reinforceimmediatelyandreplacedamagedparts.Ifsignsofwallcollapsearedetected,addsupportsinsteadofremovingthem.二、支撐的設置和拆除2.InstallationandRemovalofSupports2.4溝槽支撐2.4TrenchSupport橫撐HorizontalBracing豎撐VerticalBracing1、支撐的設置1.InstallationofSupports二、支撐的設置和拆除2.InstallationandRemovalofSupports倒撐:在施工過程中更換立柱和撐扛位置。ReverseSupport:Repositioningstandcolumnsandstrutsduringconstruction.使用場合:原支撐妨礙下一工序進行;ApplicableConditions:Originalsupporthindersthenextprocess;原支撐不穩定;Originalsupportisunstable;一次拆撐有危險;Removingsupportallatonceisdangerous;其他原因必須重新安設支撐。Otherreasonsrequirereinstallationofsupports.2、倒撐2.ReverseSupport2.4溝槽支撐2.4TrenchSupport支撐的拆除:RemovalofSupports:支撐拆除的基本要求:BasicRequirementsforRemovingSupports:檢查槽壁有無裂縫,有危險時先還土;Inspectthetrenchwallsforcracks;backfillthesoilifthereisanydanger.多層支撐的溝槽,可自下而上逐層拆除;Fortrencheswithmultiplelayersofsupports,removethemlayerbylayerfromthebottomup.拆撐前要仔細檢查溝槽兩側的建筑物、電桿及其他外管道是否安全,必要時要加固后再拆撐;Beforeremovingsupports,carefullyinspectthebuildings,utilitypoles,andotherexternalpipelinesonbothsidesofthetrenchforsafety.Reinforceifnecessarybeforeremoval.溝槽內工作全部完成后,才可將支撐拆除。拆撐與溝槽回填同時進行,邊填邊拆。拆撐時必須注意安全,繼續排除地下水,避免材料損耗。遇撐板和立木較長時,可在還土后或倒撐后拆除。Supportsshouldonlyberemovedafterallworkwithinthetrenchiscompleted.Removalofsupportsandtrenchbackfillingshouldbedonesimultaneously,withfillingandremovaloccurr
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 滌綸纖維在防霉地毯材料中的應用考核試卷
- 塑料鞋制造過程廢料處理與回收利用考核試卷
- 生物制藥過程中的質量控制實驗室建設與管理考核試卷
- 電視廣播信號加密與解密技術考核試卷
- 玻璃屋頂搭建考核試卷
- 電視芯片原理與系統集成考核試卷
- 皮革護理技能競賽策劃與實施考核試卷
- 陽泉職業技術學院《單片機技術與應用》2023-2024學年第二學期期末試卷
- 四川托普信息技術職業學院《建設用地管理》2023-2024學年第二學期期末試卷
- 徐州市九里區2024-2025學年四下數學期末復習檢測試題含解析
- 房產中介勞動合同參考模板
- 2025廣東中山市殯儀館公開招聘工作人員歷年高頻重點提升(共500題)附帶答案詳解
- 事業單位考試計算機基礎知識試題
- 古法拓印(非遺課程)
- 2025年民航華北空管局招聘筆試參考題庫含答案解析
- 倉庫辣椒管理制度內容
- JJF(黔) 84-2024 便攜式制動性能測試儀校準裝置校準規范
- 裝飾裝修工程施工機械、物資材料、勞動力的配備及總體計劃
- 足浴店衛生管理規章制度模版(3篇)
- 衡重式及重力式擋土墻自動計算表
- 廣告制作投訴處理規則
評論
0/150
提交評論