




版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
1、Sales ContractContract No:Contract Date:The Buyer:Address:Tel:Fax:E-mail:The Seller:Address:Tel:Fax:E-mail:The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below:1. Product Name:2. Purity:3. Quantity: % more or less allowed4. Unit Price:USD /KG5. To
2、tal Amount:USD(大寫)6. Terms of Delivery: 7. Country of Origin and Manufacturer:8. Packing:The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation / multi-transportation. The Seller shall be liable for any damage and
3、 loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as "Keep away from moisture", "Handle with care" shall be stenciled on the surface of each package with fadeless pigment.9. Shipping Marks:10. Ti
4、me of Shipment:No later than 11. Port of Loading:12. Port of Destination:13. Insurance:Insurance shall be covered by the (Buyer or Seller) for 110% of the invoice value against _ Risks and _ Additional Risks.14. Terms of Payment: (choose one/several of the terms)(a) Letter of Credit: The Buyer shall
5、, _ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire _ days after the completion of loading of the shipment as stipulated.(b) Documents against payment: After shipment, the Seller
6、 shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and _ Bank to the Buyer against payment, i.e.: D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.(c) Documents against Acceptance: After shipment,
7、 the Seller shall draw a sight bill of exchange, payable_ days after the Buyer delivers the document through Sellers bank and _Bank to the Buyer against acceptance (D/A _ days). The Buyer shall make the payment on date of the bill of exchange.(d) Cash on delivery (COD): The Buyer shall pay to the Se
8、ller total amount within _ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).15. Documents RequiredThe Seller shall present the following documents required to the bank for negotiation/collection:(a) Full set of clean on board Ocean/Combined Transportatio
9、n/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;(b) Signed commercial invoice in _copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;(c) Packing list/weight memo in _ copies issued by;(d) Certificate of Quality in _ copies issued by;(e) Certificate
10、 of Quantity in _ copies issued by;(f) Insurance policy/certificate in _ copies (Terms of CIF);(g) Certificate of Origin in _ copies issued by;(h) The Seller shall, within _ hours after shipment effected, send by courier each copy of the above-mentioned documents No.16. Terms of Shipment: (choose on
11、e of the terms)(a) FOBThe Seller shall, 30 days before the shipment date specified in the Contract, advise the Buyer by _(usually e-mail)_ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book
12、 shipping space. In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.(b) CIF or CFRThe Seller shall ship the goods duly within the
13、 shipping duration from the port of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _(usually e-mail)_ of the Contract No., commodity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.17. Shipping
14、 Advice:The Seller shall, immediately upon the completion of the loading of the goods, advise the Buyer of the Contract No., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _ within _hours.18. Quality Guarantee:The Seller shall guarantee that t
15、he commodity must be in conformity with the quality, specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be _ months after the arrival of the goods at the port of destination, and during the period the Seller shall be responsible for the
16、 damage due to the defects in designing and manufacturing of the manufacturer.19. Inspection (alternative):(a) The Seller shall have the goods inspected 天數_ days before the shipment and have the Inspection Certificate issued by _ 機構 _. The Buyer may have the goods re-inspected by _ after the goods a
17、rrival at the destination.(b) The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspecti
18、on. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the goods. If damages of the goods are found, or the specifications and/or
19、quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to th
20、e inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey.20. Claim:The buye
21、r shall make a claim against the Seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred therefrom shall be borne by the Seller. The claims mentioned above shall be regarded as being accepted if the Seller fail to reply within _days after the S
22、eller received the Buyer's claim.21. Late delivery and PenaltyShould the Seller fail to make delivery on time as stipulated in the Contract, with the exception of Force Majeure causes specified in Clause 21 of this Contract, the Buyer shall agree to postpone the delivery on the condition that th
23、e Seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. The rate of penalty is charged at_% for every _ days, odd days less than _days should be counted as _ days. But the penalty, however, shall not exceed_% of the total value of the goods invo
24、lved in the delayed delivery. In case the Seller fail to make delivery _ days later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract and the Seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the Buyer with
25、out delay.The buyer shall have the right to lodge a claim against the Seller for the losses sustained if any.22. Force Majeure:The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in
26、the course of loading or transit. The Seller shall advise the Buyer immediately of the occurrence mentioned above and within_ days thereafter the Seller shall send a notice by courier to the Buyer for their acceptance of a certificate of the accident issued by the local chamber of commerce under who
27、se jurisdiction the accident occurs as evidence thereof. Under such circumstances the Seller, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than _ days the Buyer shall have the right to cancel the Contract.23. Arbitration:Any dispute arising from or in connection with the Contract shall be settled through friendly negotiation. In case no settlement is reached, the dispute shall be submitted to Chi
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 藥物治療效果評估研究試題及答案
- 藥劑學中藥物安全使用試題及答案
- 規劃師考試資料資源分享試題及答案
- 西醫臨床考試復習策略試題及答案
- 2024-2025學年甘肅省白銀市會寧縣第一中學高三3月份模擬考試物理試題含解析
- 2024高中英語刷題首秧基礎練能力練Unit2TheOlympicGamesSectionⅡTheLanguagePointsofReading第1課時含解析新人教版必修2
- 龍江公司面試題及答案
- 安徽省滁州市中考化學試卷及答案
- 小學生輔導班課件
- 浙江余姚八中2025年高考沖刺物理模擬試題含解析
- 2025年4月自考00152組織行為學押題及答案
- 2025【英文合同】授權代理合同英文范本
- 2024年東莞市寮步鎮招聘特聘材料員筆試真題
- 北師大版2025二年級語文下冊期中考試綜合檢測
- 湖南2025屆新高考教學教研聯盟(長郡二十校)高三第二次預熱演練數學試題(含答案)
- 2025年注會合同法試題及答案
- 2025年礦區招聘考試試題及答案
- DBJ50T-220-2015 房屋建筑工程質量保修規程
- 8個事故案例13個警示視頻文字完善篇(礦山局迎檢資料)
- 黑龍江省齊齊哈爾市重點達標名校2025屆中考一模生物試題含解析
- Unit 3 Diverse Cultures Reading and Thinking (說課稿)高一英語同步高效課堂(人教版2019必修第三冊)001
評論
0/150
提交評論