1、 3322 巖石力學與工程學報 2006 年 圖 8 為測點 zx2 處在盾構開挖面通過 25 m 后的 橫向地面變形曲線,圖中實測值與有限元計算結果 均見姜忻良等 21 settlement and its derivatives caused by tunneling in soilJ. Ground Engineering,1982,15(8:1320,36. 3 劉建航,侯學淵 . 盾構法隧道 M. 北京:中國鐵道出版社, 1991.(Liu Jianhang , Hou Xueyuan. Shield Driven TunnelM. Beijing:China Railway Pub
2、lishing House,1991.(in Chinese 4 Sagaseta C. Analysis of undrained soil deformation due to ground lossJ. Geotechnique,1987,37(3:301320. 的研究,有限元采用 ABAQUS 軟 件。如圖 8 所示,有限元計算結果比實測值明顯偏 大,而本文方法的計算結果則與實測值較吻合,表 明本文方法比較可靠。 y/m 0 0 5 10 15 20 25 5 Loganathan N, Poulos H G. Analytical prediction for tunnelingi
3、nduced ground movement in claysJ. Journal of Geotechnical and Geoenvironmental Engineering,1998,124(9:846856. 15 w/mm 實測值 本文方法 有限元計算結果 6 姜忻良,趙志民 . 鏡像法在隧道施工土體位移計算中的應用 J. 哈爾濱工業大學學報,2005,37(6:801803.(Jiang Xinliang, Zhao Zhimin. Application of image method to calculating tunnelinginduced soil displacem
4、entJ. Journal of Harbin Institute of Technology,2005,37(6:801803.(in Chinese 30 45 7 朱忠隆,張慶賀,易宏傳. 軟土隧道縱向地表沉降的隨機預測方 法 J. 巖土力學,2001 ,22(1 :56 59.(Zhu Zhonglong , Zhang Qinghe,Yi Hongzhuan. Stochastic theory for predicting longitudinal settlement in soft-soil tunnelJ. Rock and Soil Mechanics,2001, 22(1
5、:5659.(in Chinese 圖8 Fig.8 橫向地面變形曲線(x =25 m Curves of transverse surface deformation (x =25 m 5 結 語 8 廖少明,余 炎,彭芳樂. 盾構近距離穿越相鄰隧道施工的數值 本文推導了盾構隧道掘進引起的開挖面前后三 維地面變形計算公式,該方法適用于施工階段,能 夠反映出盾構機開挖面通過前后整個地面的變形過 程,并考慮了多個施工參數,更符合實際情況。文 中將正面附加推力、摩擦力和土體損失計算得到的 地面變形量進行簡單疊加,沒有考慮三者之間的耦 合作用,計算結果可能會略微偏大。 分析表明,在盾構隧道掘進過程中
6、,地面通常 是先隆起、后沉降,地面是否隆起是由正面附加推 力、摩擦力和土體損失這 3 個因素共同決定的。在 實際施工中,這 3 種力學效應并不是相互獨立的, 它們的大小及相對比值是變化的,其中摩擦力相對 比較穩定,而正面附加推力和土體損失則與施工現 場控制相關,易產生起伏。下一步的研究可在本文 基礎上進一步考慮盾構機偏斜和注漿壓力對地面變 形的影響。 參考文獻(References: 1 Peck R B. Deep excavations and tunneling in soft groundA. In: Proceedings of the 7th International Confe
7、rence on Soil Mechanics and Foundation EngineeringC. Mexico:s. n.,1969. 225290. 2 Attewell P B,Woodman J P. Predicting the dynamics of ground 12 11 10 9 解析J. 巖土力學,2004,25(增 2:223226.(Liao Shaoming, Yu Yan , Peng Fangle. Numerical analysis of shield tunneling construction through adjacent objectsJ. R
8、ock and Soil Mechanics, 2004,25(Supp.2:223226.(in Chinese 于 寧,朱合華. 盾構隧道施工地表變形分析與三維有限元模擬J. 巖土力學, 2004, 25(8: 1 3301 334.(Yu Ning, Zhu Hehua. Analysis of earth deformation caused by shield tunnel construction and 3D finite element simulationJ. Rock and Soil Mechanics , 2004, 25(8: 1 3301 334.(in Chine
9、se 張海波,殷宗澤,朱俊高. 地鐵隧道盾構法施工過程中地層變位 的三維有限元模擬J. 巖石力學與工程學報,2005,24(5:755 760.(Zhang Haibo , Yin Zongze , Zhu Jungao. 3D finite element simulation on deformation of soil mass during shield tunnelingJ. Chinese Journal of Rock Mechanics and Engineering,2005,24(5: 755760.(in Chinese 魏 綱,徐日慶. 軟土隧道盾構法施工引起的縱向地面
10、變形預測J. 巖土工程學報,2005,27(9:1 0771 081.(Wei Gang,Xu Riqing. Prediction of longitudinal ground deformation due to tunnel construction with shield in soft soilJ. Chinese Journal of Geotechnical Engineering,2005,27(9:1 0771 081.(in Chinese 張冬梅, 黃宏偉. 地鐵盾構推進引起周圍土體附加應力分析J. 地 下空間, 1999, 19(5: 379382.(Zhang Don
11、gmei, Huang Hongwei. 第 25 卷 增1 魏 綱等. 盾構隧道施工引起的地面變形計算方法研究 Hangzhou:Zhejiang University,2006.(in Chinese 17 3323 Analysis for additional stress of surrounding soil due to the driving of shield tunnelJ. Underground Space,1999,19(5:379382.(in Chinese 13 Mindlin R D. Force at a point in the interior of a
12、 semi-infinite solidJ. Physics,1936,7(5:195201. 14 侯學淵,錢達仁,楊林德. 軟土工程施工新技術M. 合肥:安徽 科學技術出版社,1999.(Hou Xueyuan,Qian Daren,Yang Linde. New Techniques to the Construction of Soft Soil EngineeringM. Hefei:Anhui Science and Technology Publishing House,1999.(in Chinese 15 許宏發, 王 斌, 戴小平, 等. 樁土接觸面力學參數取值研究J. 河
13、 海大學學報,2001,29(增:5456.(Xu Hongfa,Wang Bin,Dai Xiaoping,et al. Determination of mechanical parameters on pile-soil interfaceJ. Journal of Hohai University, 2001, 29(Supp.: 5456.(in Chinese 16 魏 綱. 頂管工程土與結構的性狀及理論研究博士學位論文D. 21 20 19 18 Lee K M,Rowe R K,Lo K Y. Subsidence owing to tunneling,I: estimatin
14、g the gap parameterJ. Canadian Geotechnical Journal, 1992,29(6:929940. Schmidt C. Author s reply to SchmidtJ. Geotechnique, 1988, 38(4: 647649. Attewell P B. Ground movements caused by tunnelling in soilA. In: Proceedings of the Conference on Large Ground Movements and StructuresC. Cardiff,London:Pe
15、ntech Press,1978. 812848. Chi S Y , Chern J C , Lin C C. Optimized back-analysis for tunneling-induced ground movement using equivalent ground loss modelJ. Tunnelling and Underground Space Technology,2001, 16(3:159166. 姜忻良,崔 奕,李 園,等. 天津地鐵盾構施工地層變形實測 及動態模擬 J. 巖土力學, 2005 , 26(10 : 1 612 1 616.(Jiang Xinliang,Cui Yi,Li Yuan,et al. Measurement and simulation of ground set
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 礦石浮選工藝優化-石墨滑石選礦考核試卷
- 畜禽繁殖力與遺傳改良研究考核試卷
- 紡織材料與纖維的研究與發展考核試卷
- 電腦系統優化與提速技巧考核試卷
- 筆的制造生產計劃編制與執行考核試卷
- 嘉興南湖學院《Python數據分析與應用》2023-2024學年第二學期期末試卷
- 昆明理工大學津橋學院《CAD制圖》2023-2024學年第二學期期末試卷
- 咸陽市2025年三年級數學第二學期期末學業水平測試試題含解析
- 日照職業技術學院《國際商務創業策劃案例分析》2023-2024學年第二學期期末試卷
- 寧德市周寧縣2024-2025學年數學四年級第二學期期末考試試題含解析
- 2025年入團相關考試題型及答案
- 2023-2024學年北京市西城區德勝中學七年級(下)期中數學試卷
- 皮膚病靶向治療專家共識(2025版)解讀課件
- DB37-T 3274.3-2023 日光溫室建造技術規范 第3部分:山東VI型
- 《四輪驅動電動汽車制動系統設計》14000字(論文)
- 鄭州食品工程職業學院《中國宗教史》2023-2024學年第一學期期末試卷
- 新蘇教版一年級數學下冊綜合實踐活動1《抓抓數數》教案
- RoHS知識培訓課件
- 醫學課件痛風性關節炎
- 流程建設培訓課件
- 水利工程冬季低溫施工方案
評論
0/150
提交評論