




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
Lesson9
ConstructionManagement精品資料BuildingConstructionisaspecializedbranchofcivilengineeringconcernedwiththeplanning,executionandcontrolofconstructionoperationsforsuchprojectsashighways,buildings,dams,airports,andutilitylines.construction 施工(shīgōng)utilitylines 公共設(shè)施精品資料Planningconsistsofschedulingtheworktobedoneandselectingthemostsuitableconstructionmethodsandequipmentfortheproject.Executionrequiresthetimelymobilizationofalldrawings,layouts,andmaterialsonthejobtopreventdelaystothework.Controlconsistsofanalyzingprogressandcosttoensurethattheprojectwillbedoneonscheduleandwithintheestimatedcost.execution 實(shí)行,實(shí)施(shíshī),施工mobilization 動(dòng)員layouts 規(guī)劃,設(shè)計(jì),(工廠等的)布局圖精品資料PreparationofsiteThisconsistsoftheremovalandclearingofallsurfacestructuresandgrowthfromthesiteoftheproposedstructure.Abulldozerisusedforsmallstructures,largerstructuresmustbedismantled.bulldozer:推土機(jī),開土機(jī),壓路機(jī)dismantled:拆除,拆卸(chāixiè),粉碎精品資料EarthmovingThisincludesexcavationandtheplacementofearthfill.Excavationfollowspreparationofthesite,andisperformedwhentheexistinggrademustbebroughtdowntoanewelevation.Excavationgenerallystartswiththeseparatestrippingoftheorganictopsoil,whichislaterreusedforlandscapingaroundthenewbuilding.Thisalsopreventscontaminationoftheinorganic
materialwhichisbelowthetopsoilandwhichmayberequiredforfill.Excavationmaybedonebyanyofseveralexcavators(Fig9.1),suchasshovels,draglines,clamshells,cranes,andscrapers[1].
contamination 玷污(diànwū),污染,污染物inorganic 無機(jī)的精品資料Efficientexcavationonlandrequiresadryexcavationarea,becausemanysoilsareunstablewhenwetandcannotsupportexcavatingandhaulingequipment.Dewateringbecomesamajoroperationwhentheexcavationliesbelowthenaturalwatertableandinterceptsthegroundwaterflow.dewatering 降水(jiàngshuǐ)intercepts 攔截精品資料Whenthisoccurs,dewateringandstabilizingofthesoilmayheaccomplishedbytrenches,whichconductseepagetoasumpfromwhichthewaterispumpedout.Dewateringandstabilizingofthesoilmayinothercasesbeaccomplishedbywellpointsandelectroosmosis.wellpoint:降低(jiàngdī)地下水位的井點(diǎn),深坑點(diǎn)electroosmosis:[物]電滲精品資料Somematerials,suchasrock,cementedgravels,andhardclays,requireblastingtoloosenorfragmentthematerial.Blastholesaredrilledinthematerial;explosivesarethenplacedintheblastholesanddetonated.Thequantityofexplosivesandtheblast-holespacingaredependentuponthetypeandstructureoftherockandthediameteranddepthoftheblastholes.fragment:斷片(duànpiàn),碎塊,使成為碎片blastholes:炸藥孔detonated:突然大爆炸,使爆炸精品資料Afterplacementoftheearthfill,itisalmostalwayscompactedtopreventsubsequentsettlement.Compactionisgenerallydonewithsheep's-foot,grid,pneumatic-tired,andvibratory-typeroller,whicharetowedbytractorsoverthefillasitisbeingplaced.Hand-held,gasoline-drivenrammersareusedforcompactionclosetostructureswherethereisnoroomforrollerstooperate[2].earthfill:回填土compaction:土體壓實(shí)精品資料FoundationtreatmentWhensubsurfaceinvestigationrevealsstructuraldefectsinthefoundationareatobeusedforastructure,thefoundationmustbestrengthened.Waterpassages,cavities,fissures,faults,andotherdefectsarefilledandstrengthenedbygrouting.cavities 孔洞(kǒngdòng)fissures 裂縫grouting 注漿精品資料Groutingconsistsofinjectionoffluidmixturesunderpressure.Thefluidssubsequentlysolidifyinthevoidsofthestrata.Mostgroutingisdonewithcementandwatermixtures,butothermixtureingredientsareasphalt,cementandclay,andprecipitatingchemicals.injection 注漿solidify 固化,固結(jié)(ɡùjié),凝固void 空的精品資料
Stee1erectionTheconstructionofasteelstructureconsistsoftheassemblyatthesiteofmill-rolledorshop-fabricatedsteelsections[3].Thesteelsectionsmayconsistofbeams,columns、orsmalltrusseswhicharejoinedtogetherbyriveting,bolting,orwelding.Itismoreeconomicaltoassemblesectionsofthestructureatafabricatingshopratherthaninthefield,butthesizeofpreassembledunitsislimitedbythecapacityoftransportationanderectionequipment.riveting 鉚接bolting 螺栓連接welding 焊接連接preassemble 預(yù)先(yùxiān)裝配精品資料Thecraneisthemostcommontypeoferectionequipment,butwhenastructureistoohighorextensiveinareatobeerectedbyacrane,itisnecessarytoplaceoneormorederricksonthestructuretohandlethesteel.Inhighstructuresthederrickmustbeconstantlydismantledandreerectedtosuccessivelyhigherlevelstoraisethestructure.crane 起重機(jī)derrick 懸臂(xuánbì)起重機(jī)dismantled 拆除精品資料Forriverbridgesthesteelmaybehandledbycranesonbarges,or,ifthebridgeistoohigh,bytravelingderrickswhichrideanthebridgebeingerected.Cablesforlongsuspensionbridgesareassembledinplacebyspecialequipmentthatpullsthewirefromareel,setupatoneanchorage,acrosstotheoppositeanchorage,repeatingtheoperationuntilthebundleofwiresisoftherequiredsize[4].barge:駁船(bóchuán)suspension:懸掛anchorage:錨固點(diǎn)精品資料
ConcreteconstructionConcreteconstructionconsistsofseveraloperations:forming,concreteproduction,placement,andcuring(Fig9.2).Formingisrequiredtocontainandsupportthefluidconcretewithinitsdesiredfinaloutlineuntilitsolidifiesandcansupportitself.Theformismadeoftimberorsteelsectionsoracombinationofbothandisheldtogetherduringtheconcreteplacingbyexternalbracingorinternalties.Theformsandtiesaredesignedtowithstandthetemporaryfluidpressureoftheconcrete.forming 成型curing 養(yǎng)護(hù)timber 木材(mùcái)external 外部的精品資料Theusualpracticeforverticalwallsistoleavetheformsinpositionforatleastadayaftertheconcreteisplaced.Theyareremovedwhentheconcretehassolidifiedorset.Slipformingisamethodwheretheformisconstantlyinmotion(Fig9.3),justaheadoftheleveloffreshconcrete.Theformisliftedupwardbymeansofjackswhicharemountedonverticalrodsembeddedintheconcreteandarespacedalongtheperimeterofthestructure.Slipformsareusedforhighstructuressuchassilos,tanks,orchimneys[5].slip-forming 滑模施工(shīgōng)perimeter 周邊silo 筒倉tank 盛液體或氣體的大容器罐精品資料Concretemaybeobtainedfromcommercialbatchplantswhichdeliveritinmixtracks[6].Concreteproductionatthejobsiterequirestheerectionofamixingplant,andofcementandaggregatereceivingandhandlingplants.Aggregatesaresometimesproducedatornearthejobsite.Thisrequiresopeningaquarryanderectingprocessingequipmentsuchascrushers(碎石機(jī))andscreens(篩子(shāizi)).mixingplant:混凝土攪拌車間(chējiān)cement:水泥aggregate:骨料quarry:采石場精品資料Curingofexposedsurfacesisrequiredtopreventevaporationofmixwaterortoreplacemoisturethatdoesevaporate.Theproperbalanceofwaterandcementisrequiredtodevelopfulldesignstrength.evaporation 水分(shuǐfèn)蒸發(fā)balanceofwaterandcement 水灰比develop 發(fā)展,達(dá)到designstrength 設(shè)計(jì)強(qiáng)度精品資料Concretepavingforairportsandhighwaysisafullymechanizedoperation.Batchesofconcreteareplacedbetweentheroadformsfromamixtruckoramovablepaver,whichisacombinationmixerandplacer.Aseriesofspecializedpiecesofequipment,whichrideontheforms,followtospreadandvibratetheconcrete,smoothitssurface,cutcontractionjoints,andapplyacuringcompound.paving:路面Batches:一批批的movablepaver:可移動(dòng)式鋪路(pùlù)機(jī)vibrate:震動(dòng)精品資料PrestressedConcreteconstruction:ThecommonconstructionmethodofprestressedConcreteispre-tensioningandpost-tensioning.(Fig9.5)prestressedconcrete 預(yù)應(yīng)力混凝土pre-tensioning 先張法post-tensioning 后張法精品資料Prestressedconcreteusesteelsandconcretesofveryhighstrengthincombination.Thesteel,mostlyintheshapeofwiresorstrandsbutsometimesasbars,isembeddedintheconcreteunderhightensionwhichisheldinequilibriumbycompressionstressedinthesurroundingconcreteafterhardening.Becauseofthisprecompression,theconcreteinaflexuralmemberwillcrackonthetensionsideatamuchlargerloadthanwhennotsoprecompressed.wire 鋼絲strand 鋼鉸線bar 粗鋼筋(gāngjīn)precompression 預(yù)先壓縮精品資料Thisreducesradicallyboththedeflectionsandthetensilecracksatserviceloadsinsuchstructuresandtherebyenablesthesehighstrengthmaterialstobeusedeffectively.Prestressedconcreteisparticularlysuitedtoprefabricationonmassproductionbasis,althoughitisbeingusedaswellwithoutsuchprefabrication.Itsintroductionhasextendedtoaverysignificantdegree,therangeofstructuralusesofthecombinationofthesetwomaterials.deflection 構(gòu)件撓度tensilecracks 裂縫(lièfèng)寬度massproduction 大批量生產(chǎn)精品資料
TestsonCompletionandEmployer'sTaking-Over
Thecontractorshallprepare,andkeepup-to-date,acompletesetof"as-built"recordsoftheexecutionoftheworks,whicharecalledAs-BuiltDocuments,showingtheexactas-builtlocations,sizesanddetailsoftheworkasexecuted.Theserecordsshallbekeptonthesite.Twocopiesshallbesuppliedtotheengineerpriortothecommencementofthetestsoncompletion.Inaddition,thecontractorshallsupplytotheengineeras-builtdrawingsoftheworks,showingallworksasexecuted,andsubmitthemtotheengineerforreview.testsoncompletionandemployer‘sTaking-Over 竣工(jùngōng)初驗(yàn)和雇主的接收“as-built”records “竣工(jùngōng)”記錄精品資料Priortocommencementofthetestsoncompletion,thecontractorshallsupplytotheengineerprovisionalOperationandMaintenanceManualsinsufficientdetailfortheemployertooperate,maintain,dismantle,reassemble,adjustandrepairtheplant.ThecontractorshallcarryoutthetestoncompletionafterprovidingtheAs-BuiltDocumentsandOperationandMaintenanceManuals.testoncompletion 竣工初驗(yàn)OperationandMaintenanceManuals 《操作和維修(wéixiū)手冊》精品資料Iftheworks,orasection,failtopassthetestsoncompletion,theengineerorthecontractormayrequirethefailedtests,andtestsoncompletiononanyrelatedwork,toberepeatedunderthesametermsandconditions.contractor 承包商thesametermsandconditions 按照相同(xiānɡtónɡ)的條款和條件精品資料[1].Excavationmaybedonebyanyofseveralexcavators,suchasshovels,draglines,clamshells,cranes,andscrapers.土體開挖可由下列(xiàliè)任何一種開挖機(jī)械實(shí)施,比如:單斗挖土機(jī)、拉鏟挖土機(jī)、抓鏟挖土機(jī)、起重機(jī)、鏟運(yùn)機(jī)等。back精品資料[2].Compactionisgenerallydonewithsheep's-foot,grid,pneumatic-tired,andvibratory-typerollers,whicharetowedbytractorsoverthefillasitisbeingplaced.Hand-held,gasoline-drivenrammersareusedforcompactionclosetostructureswherethereisnoroomforrollerstooperate.土體壓實(shí)常用羊足碾、平碾、氣胎碾、震動(dòng)碾壓路機(jī),由牽引機(jī)拖拉(tuōlā)在回填土上進(jìn)行碾壓。當(dāng)沒有操作壓路機(jī)的空間時(shí),常用手持式和煤油驅(qū)動(dòng)錘來進(jìn)行土體壓實(shí)。back精品資料[3].Theconstructionofasteelstructureconsistsoftheassemblyatthesiteofmill-rolledorshop-fabricateds
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- T/CIQA 89-2024農(nóng)村電商運(yùn)營職業(yè)能力培養(yǎng)與評價(jià)規(guī)范
- T/CACE 0132-2024改性磷石膏混合料填筑應(yīng)用技術(shù)規(guī)程
- T/CI 465-2024質(zhì)量分級及“領(lǐng)跑者”評價(jià)要求多晶硅
- 商品砼運(yùn)輸承包合同10篇
- 幼兒園園長授權(quán)責(zé)任協(xié)議書9篇
- 食堂規(guī)范化整治項(xiàng)目施工合同3篇
- 農(nóng)村轉(zhuǎn)讓土地的合同3篇
- 2025年溫州市商品銷售合同4篇
- 履約擔(dān)保委托保證合同律師擬定版本5篇
- 綠化運(yùn)營維護(hù)合同5篇
- 歷年考研英語一真題及答案
- 寵物殯葬師理論知識考試題庫50題
- 飛花令“水”的詩句100首含“水”字的詩句大全
- 門診常見眼科病
- 保育師中級培訓(xùn)課件資源
- 心力衰竭病人的護(hù)理課件
- 教學(xué)機(jī)房規(guī)劃方案
- 腫瘤患者全程管理
- 可行性研究報(bào)告編制服務(wù)投標(biāo)方案
- 大學(xué)生如何處理學(xué)習(xí)與娛樂的平衡
- 專業(yè)文獻(xiàn)閱讀技巧
評論
0/150
提交評論